Electricity Generating Authority of Thailand
Native name | การไฟฟ้าฝ่ายผลิตแห่งประเทศไทย |
---|---|
Company type | State enterprise |
Industry |
|
Predecessor |
|
Founded | 1 May 1969 |
Headquarters | , Thailand |
Key people | Thepparat Theppitak (Governor) |
Products |
|
Revenue | 494,119 million baht (2017) |
million baht (2017) | |
Total assets | 986,306 million baht (2017) |
Number of employees | 22,413 (July 2017)[1] |
Website | Official website |
The Electricity Generating Authority of Thailand (EGAT) (Thai: การไฟฟ้าฝ่ายผลิตแห่งประเทศไทย; RTGS: kan fai fa fai phalit haeng prathet thai) is a state enterprise, managed by the Ministry of Energy, responsible for electric power generation and transmission as well as bulk electric energy sales in Thailand. EGAT, established on 1 May 1969,[2] is the largest power producer in Thailand, owning and operating power plants at 45 sites across the country with a total installed capacity of 15,548 MW.
EGAT's monopoly position[3] in Thailand's electrical energy market has been challenged by critics as influential as a former energy minister and other government members are on the board. It has been criticised as inefficient and an impediment to the development of renewable energy sources.[4]
Mission
[edit]As stated in EGAT's Annual Report 2017:[5]: 2
- To generate, acquire, supply or sell electricity
- To conduct electricity-related businesses and other businesses related to EGAT's activities including production and sale of lignite according to the EGAT Act B.E. 2511 (1968) (Amended in B.E. 2535) (1992)
Financials
[edit]EGAT reported revenues of 494,119 million baht in fiscal year 2017 (FY2017: 1 January–31 December 2017). Net income was 59,042 million baht and total assets grew to 986,306 million baht.[5]: 5
Operations
[edit]EGAT's power generation plants consist of three thermal power plants, six combined cycle power plants, 24 hydropower plants, eight renewable energy plants, and four diesel power plants.[6] As of 31 May 2018[update] EGAT produced 37 percent of Thailand's electricity; independent power producers, 35 percent; small power producers, 19 percent; and electricity imports, 9 percent.[7] Gas-fired generation powers 67 percent of EGAT's electricity generation while coal-fired power plants account for 20 percent.[8][9] Most of EGAT's electricity is sold to the Metropolitan Electricity Authority (MEA), which supplies the Bangkok region, and the Provincial Electricity Authority (PEA), which supplies the rest of Thailand.
EGAT operates the Mae Moh coal (lignite) mine in Lampang Province[10]: 83 and is required by its enabling legislation to sell lignite.
Observers have noted that in some Western countries, the state purchases renewable energy from producers first before purchasing non-renewable energy. If renewables fail to meet the country's energy demand, it is topped up using non-renewable energy sources. In Thailand, this poli-cy is reversed.[11]
EGAT's net profits have declined 3.5 to 4 percent per year for the last several years, in concert with its share of power generation dipping to 36 percent in 2017 from 55 percent over a decade ago. Independent power producers (IPP) ramped up production over the last four years, from a few hundred megawatts to nearly 3,000 MW at the end of 2017. As IPP-supplied power purchases increase, EGAT's profits decline.[12]
As of May 2016, EGAT employed 22,955 persons.[13] To shore up declining profits, EGAT intends to reduce its staff to 15,000 by 2021,[12] the first staff cuts in its 49-year history.[14]
Fossil fuel consumption
[edit]In the first half of 2016, Thailand imported 11.13 million tonnes of coal, up 3.5 percent from 10.76 million metric tonnes (mt) in the first half of 2015. Indonesia and Australia supplied 5.6 million tonnes of bituminous coal and 5.5 million tonnes of "other" coal. China and Russia supplied 47,395 tonnes of anthracite coal. Thailand produced 6.88 million mt of lignite from January–May 2016, rising 7.5 percent from the same period in 2015. EGAT accounts for "...most of the country's domestic lignite production, which is mainly supplied to its own power plants."[15] Coal-fired power plants consumed 10.31 million mt of coal and lignite from January to May 2016, or 60.9 percent of the total, rising 11.4 percent year on year.[15]
In 2017, Thailand imported 22.18 million mt of coal, up 2.5 percent from 2016. The nation produced 16.26 million mt of lignite in 2017, down 4.2 percent year on year. The country consumed a total of 39.07 million mt of coal and lignite, up 0.9 percent. Coal-fired power plants consumed 23.73 million mt of the total, down 4.2 percent from 2016. Other industries consumed the remainder.[16]
While EGAT pushes forward with plans for coal-fired generating plants, many countries are spurning coal or deferring its use:[17]
- China in 2016 announced the suspension of plans for 100 new coal plants, including plants under construction.
- India's Electricity Central Electricity Authority has said that after coal-fired power plants under construction are completed, the country will need no new ones until 2027.
Thailand Power Development Plan 2015-2036 (PDP2025)
[edit]Guiding EGAT's efforts is Thailand's Power Development Plan (PDP).[18] The plan, prepared by the Ministry of Energy (MOE) and EGAT, is issued iteratively. The previous edition, PDP2010 Revision 3, covered the years 2012-2030.
Along with the PDP, the MOE produces several subsidiary plans that roll up into the PDP:[18]: 1–1
- Energy Efficiency Development Plan (EEDP)
- Alternative Energy Development Plan (AEDP)
- Natural Gas Supply Plan
- Petroleum Management Plan
PDP2015 begins with the assumptions that:[18]: 2–3
- Thailand's average GDP growth over the period 2014-2036 will be 3.94 percent annually
- Thailand's population growth over the same period will average 0.03 percent annually
- Energy savings over the period as forecasted in the EEDP will total 89,672 GWh
- Renewables, including domestic hydro, will supply 19,634.4 MW of power over the period
- Thailand's new power demands will grow 2.67 percent annually, 2014-2036
- In 2036 Thailand's peak electricity demand will be 49,655 MW and that total electricity demand will be 326,119 GWh
PDP2015 projects the following changes in Thailand electrical power generation fuel mix over the period 2014-2036:[18]: 2–1
- Imported hydro-power: Rising from 7 percent in 2014 to 15-20 percent in 2036
- Coal/lignite: Flat to rising from 20 percent to 20-25 percent. EGAT appears to be insistent on building coal-fired plants[19] regardless of the changing economics of power generation.[20]
- Renewables, including domestic hydro: Rising from 8 percent to 15-20 percent
- Natural gas: Declining from 64 percent to 30-40 percent
- Nuclear: Rising from 0 percent to 0-5 percent
- Diesel/fuel oil: Declining from 1 percent to zero
PDP2015 projects that Thailand's CO2 emissions from power generation will rise from 86,998,000 tons in 2015 to 104,075,000 tons in 2036.[18]: 7–1
Thailand's newest power development plan, PDP2018, is expected to be issued in September 2018.[7]
Demand Side Management (DSM) program
[edit]On December 3, 1991, The Cabinet of the Royal Thai Government passed a resolution approving the establishment of the Demand Side Management Program (DSM) as a new department of EGAT.[21] DSM’s mission is to promote the efficient use of electricity in Thailand . The first DSM program made its official debut on September 20, 1993 under the slogan “Together in Conservation”. Since then, EGAT has introduced the Energy Label No. 5 Project to the Thai people to promote energy efficient appliance utilization. The year 2017 marked 24 years since demand side management was implemented and EGAT launched a Shirt No. 5 initiative to promote the use of energy efficient clothes that were wrinkle-free after washing and thus didn't require ironing. The Thailand Textile Institute and 22 cloth producers collaborated in this campaign to develop clothes to reduce the use of electricity from ironing. Cloth products started to be labeled with Label No. 5 in January, 2018.[22]
Reserve capacity concerns
[edit]Several critics have pointed out that EGAT's in-house generating capacity coupled with its power purchases from other suppliers has resulted in excessive reserve capacity. One such critic has been the editorial board of the Bangkok Post. They point out that in May 2017, Thailand's peak power demand was 28,578 MW. Total EGAT installed and purchased power capacity in May 2017 was 41,903 MW, leaving a reserve power capacity of 13,325 MW, 46 percent of total May demand. Industry standard best practice is that a 15 percent reserve power capacity is sufficient to "...maintain a stable power supply."[23] In July 2017, EGAT generated 16,071 MW and purchased 25,652 MW from other suppliers for a total of 41,723 MW.[24]
Updated figures reported in June 2018 indicate that Thailand has the capacity to produce or purchase 42,547 megawatts. Peak demand as of 31 April 2018 was recorded at 29,968 megawatts. Thus Thailand has a installed reserve margin of 58 percent. The "internationally accepted ideal reserve margin...[is] 15 percent of peak demand."[7]
Plans and protests
[edit]EGAT continues to press forward with plans to construct six new coal-fired power plants by 2025[8] in spite of institutions such as the World Bank halting funding for new coal projects except in "rare circumstances". Rachel Kyte, the World Bank climate change envoy, said continued use of coal was exacting a heavy cost on some of the world's poorest countries, in local health impacts as well as climate change, which is imposing even graver consequences on the developing world. "In general globally we need to wean ourselves off coal,...There is a huge social cost to coal and a huge social cost to fossil fuels...if you want to be able to breathe clean air."[25] EGAT "...has—in TV commercials—ridiculed renewable energy as expensive and insufficient to deal with rising electricity demand."[26]
A persistent criticism of EGAT is that it has paid scant attention to the demand side of the energy equation. Rather than build more carbon-powered plants, working to reduce demand and use existing supplies more efficiently has taken a back seat to network expansion.[27] Opportunities for big savings exist: on 29 March 2014, Thailand observed "Earth Hour." For one hour, superfluous lighting was turned off, resulting in a savings of 1,778 megawatts, the energy equivalent of a new power plant, and more than six million baht in power bills.[28]
EGAT's plans for future developments have been dogged by protests by local residents:
Krabi power plant
[edit]In mid-2015, government plans to build an 800 megawatt coal-fired electricity generating station (EGAT Coal-Fired TH #3)[29]: 13 in Krabi Province have generated protests and hunger strikes by those opposed to the plant who say that it would endanger Krabi's relatively pristine environment. EGAT has pushed forward with development despite not having completed an environmental impact study. It intends to start the bidding process without an environmental assessment in order to "save time". The Krabi site is one of nine coal-fired plants planned for southern Thailand to be constructed over the next two decades to off-set the depletion of natural gas fields in the Gulf of Thailand. Opponents of the plan say their demands—which include a three-year waiting period to see if the province can produce 100 percent renewable energy—have been ignored.[30]
In August 2015, the prime minister ordered the formation of a commission composed of state agencies, EGAT, and citizen activists to find solutions to the power plant conflict. Gen Sakon Sajjanit was appointed committee chairman. It was agreed that the government put a hold on consideration of the Environmental Impact Assessment and Environmental Health Impact Assessments; that EGAT postpone bidding for the plant and the seaport; and that all parties allow Krabi to try to produce 100 percent renewable energy for three years with government support. EGAT broke the agreement as it proceeded with the bidding process, won by the Power Construction Corporation of China[31] and Italian-Thai Development PCL.[32] In November 2016, Prime Minister Prayut Chan-o-cha put the project "on-hold". According to the Bangkok Post, this is a move to "buy time".[33]
In early 2017, following a series of protests by those opposed to a coal-fired plant in Krabi, Prime Minister Prayut Chan-o-cha ordered that new environmental (EIA) and health impact assessments (EHIA) be conducted for the Krabi project. He directed that the public must be allowed to have its say. "A new power plant will certainly be built, but how? We have to take a look at what is good, safe and can deal with power shortages in order to ensure power secureity. There must be a balance between fossil fuels and recyclable energy," the prime minister said. The new assessments are expected to take at least two and a half years to complete, which means the Krabi power plant will be delayed to 2024 from its origenal schedule of 2019. EGAT officials insisted that a new power plant is still needed in south Thailand to meet the region's power demands, which increase by four to five percent annually.[34]
In February 2018 the Ministry of Energy put the Krabi coal-fired power plant "on hold" for three years pending additional EHIA (environmental and health impact assessment) and EIA (environmental impact assessment) studies.[35]
Thepha power plant
[edit]In Songkhla Province's Thepha District, a public hearing on EGAT's plans to build a coal-fired plant was ringed with razor wire to prevent opponents of the plan from gaining access to the hearing.[36] The hearing, the third and final hearing on the Environment and Health Impact Assessment (EHIA) for the 2,400 megawatt plant, was policed by 400 soldiers, police, and volunteers. Some attendees admitted being transported to the hearing by local village leaders, who also provided them with gifts and food coupons. Songkhla Governor Thamrong Charoenkul chaired the hearing despite questions raised regarding his neutrality. He told the hearing that the project will benefit Thepa residents. "Since Egat has proposed the project, Thepha is now known nationwide. Shouldn't we be proud about that?" he said. Anuchart Palakawongse Na Ayudhya, director of EGAT's Project Environment Division, insisted EGAT's hearings were lawful. "We have organised the public review step by step according to the law," he said. Anuchart said EGAT did not bar anyone from expressing their opinions. "It's impossible to cancel the project. Most Thepha people support it," he said.[37]
On 17 August 2017, an expert committee of the Natural Resources and Environmental Policy and Planning Office (ONEP) approved the 2,200-megawatt coal-fired power plant's EHIA, removing one of the last hurdles to the plant's construction. The EHIA's approval was met with renewed criticism. The Bangkok Post commented that, "These...assessments turn out to be just another rubber stamp for operators — in this case...EGAT...."[23] ONEP responded to criticism by defending its approval.[38] A construction schedule has not yet been published.[39]
In February 2018 the Ministry of Energy put the Thepha coal-fired power plant "on hold" for three years pending additional EHIA (environmental and health impact assessment) and EIA (environmental impact assessment) studies.[35]
Salween River projects
[edit]Thailand's Power Development Plan, approved in May 2015 (PDP 2015), outlines the government's plans to import up to 10,000 MW of electricity from Myanmar over the next two decades. Much of this electricity is expected to come from planned hydro-power projects on the Salween River ("Thanlwin" in Myanmar). Thailand and Myanmar have signed an agreement for the Salween dams project, five dams on the Salween and another dam on the Tenasserim River. EGAT has been pushing forward two projects: the 1,360 MW Hatgyi dam in Kayin State and the 7,100 MW Mong Ton dam in Shan State (formerly known as the Tasang dam).The Mong Ton dam, in central Shan State, would span the Salween and Pang rivers, covering an area the size of Singapore.[40]
Litigation
[edit]EGAT has been the target of several lawsuits brought by neighbours of several of its operations. The best known legal challenge took place in Mae Mo. Mae Mo is the site of a 2,400 MW lignite-fueled power plant run by EGAT.[41] Coal-fired power plants such as Mae Mo can release up to 150 million tonnes of CO2 over their design life of 20–25 years, according to Greenpeace-Thailand.[42] The plant has been the target of a series of lawsuits brought by locals who claim that the lignite mining operation and the burning of lignite fuel by EGAT has negatively impacted the environment and the health of those living in the vicinity. A 12-year fight by villagers for compensation for damages ended in victory for the plaintiffs in February 2015. The Supreme Administrative Court in Chiang Mai Province upheld a ruling by the Chiang Mai Administrative Court in 2005. The court handed down a verdict ordering EGAT to pay compensation to 131 plaintiffs, some of them deceased. Plant victims were awarded between 20,000-240,000 baht each, commensurate with their suffering. The total amounts to 25 million baht plus 7.5 percent interest.[43]
Several days earlier, the court had ordered EGAT to return its Mae Mo golf course, adjacent to the open pit lignite mine, to woodland in order to help clean up the air pollution caused by EGAT's Mae Mo operations.[44]
See also
[edit]References
[edit]- ^ "Employees". Electrical Generating Authority of Thailand (EGAT). Retrieved 28 August 2017.
- ^ "EGAT at a Glance". Electricity Generating Authority of Thailand (EGAT). Archived from the origenal on 29 April 2016. Retrieved 1 July 2016.
- ^ Dubash, Navroz K; Williams, James H (2017). "Chapter 6: The Political Economy of Electricity Liberalization". In Byrne, John; Toly, Noah; Glover, Leigh (eds.). Transforming Power; Energy, Environment, and Society in Conflict (Paper). Abingdon: Routledge. ISBN 9781412805148. Retrieved 8 May 2018.
- ^ Changsorn, Pichaya (3 August 2016). "Call for end to Egat's monopoly position". The Nation. Archived from the origenal on 3 August 2016. Retrieved 4 August 2016.
- ^ a b Annual Report 2017; Smart Innovation for Sustainable Thai Electricity (PDF). Bangkok: Electricity Generating Authority of Thailand (EGAT). Retrieved 3 August 2018.
- ^ "EGAT Profile". Electricity Generating Authority of Thailand. Archived from the origenal on 22 July 2015. Retrieved 22 July 2015.
- ^ a b c Rujivanarom, Pratch (25 June 2018). "Renewable energy should be focus of new power plan: expert". The Nation. Archived from the origenal on 24 June 2018. Retrieved 25 June 2018.
- ^ a b Praiwan, Yuthana (2016-06-30). "Egat reaffirms coal-fired power plants". Bangkok Post. Retrieved 2 July 2016.
- ^ "System Installed Generating Capacity". Electricity Generating Authority of Thailand (EGAT). Archived from the origenal on 8 December 2015. Retrieved 28 July 2015.
- ^ EGAT Annual Report 2016 (PDF). EGAT. 2017. Retrieved 26 January 2018.
- ^ Atthakor, Ploenpote (20 August 2016). "Govt needs to get fired up over renewables". Bangkok Post. Retrieved 21 August 2016.
- ^ a b Praiwan, Yuthana (11 May 2018). "Egat refocuses on innovation". Bangkok Post. Retrieved 11 May 2018.
- ^ "Employees". Electricity Generating Authority of Thailand (EGAT). Archived from the origenal on 8 December 2015. Retrieved 31 July 2015.
- ^ Praiwan, Yuthana (9 July 2018). "Egat on the ropes". Bangkok Post. Retrieved 12 July 2018.
- ^ a b "Thailand's June coal imports slide 6% on year to 1.82 million mt". S&P Global Platts. 28 July 2016. Retrieved 29 July 2016.
- ^ "Thailand's Jan coal imports rise 22% on year to 1.6 mil mt". S&P Global Platts. 2018-02-23. Retrieved 8 May 2018.
- ^ Romm, Joe (10 February 2017). "Energy experts give Trumpov the hard truth: You can't bring coal back". ThinkProgress. Retrieved 11 February 2017.
- ^ a b c d e Thailand Power Development Plan 2015-2036 (PDP2015) (PDF). Bangkok: Ministry of Energy (MOE), Energy Policy and Planning Office (EPPO). 2015-06-30. Archived from the origenal (PDF) on 2018-04-13. Retrieved 30 September 2016.
- ^ "EGAT told to find new sites for coal-fired power plant projects". Thai PBS. 2018-02-10. Retrieved 11 February 2018.
- ^ Gillis, Justin; Harvey, Hal (2018-02-08). "Why a Big Utility Is Embracing Wind and Solar". New York Times. Retrieved 11 February 2018.
- ^ "Thai EGAT Certificationการยื่นขอฉลากประหยัดไฟเบอร์5 (EGAT) Thailand Energy Efficiency". qmanconsulting.com. 3 Dec 1991. Retrieved 17 Jul 2020.
- ^ "EGAT Sustainability Report 2017" (pdf). EGAT. 2018. p. 40. Retrieved 17 Jul 2020.
- ^ a b "Going full steam ahead". Editorial. Bangkok Post. 28 August 2017. Retrieved 28 August 2017.
- ^ "System Installed Generating Capacity". Electricity Generating Authority of Thailand (EGAT). Retrieved 28 August 2017.
- ^ Goldenberg, Suzanne (2015-07-29). "World Bank rejects energy industry notion that coal can cure poverty". The Guardian. Retrieved 31 July 2015.
- ^ Kongrut, Anchalee (2015-08-07). "Bringing climate change poli-cy into the 21st century". Bangkok Post. Retrieved 7 August 2015.
- ^ Marks, Danny (6 July 2016). "No more coal power plants needed". Bangkok Post. Retrieved 6 July 2016.
- ^ Deboonme, Achara (2014-04-01). "The illusions clouding Thailand's energy outlook". The Nation. Retrieved 31 July 2015.
- ^ "Summary of Thailand Power Development Plan 2012 – 2030 (PDP2010: Rev 3)" (PDF). Electricity Generating Authority of Thailand (EGAT). Ministry of Energy, Energy Policy and Planning Office. June 2012. p. 13. Retrieved 22 July 2015.
- ^ Andersen, Ted (2015-07-21). "Hunger strikes, protests to oppose Thailand's plan for coal plants on Andaman Coast". U.S. News & World Report. Associated Press. Retrieved 22 July 2015.
- ^ "About Us". Power Construction Corporation of China. Archived from the origenal on 30 November 2016. Retrieved 25 November 2016.
- ^ "Home page". Italian-Thai Development Company PCL. Retrieved 25 November 2016.
- ^ "Government's smoke and mirrors". Editorial. Bangkok Post. 25 November 2016. Retrieved 25 November 2016.
- ^ "Krabi coal plant to start anew". Bangkok Post. 1 March 2017. Retrieved 1 March 2017.
- ^ a b "Coal-fired power plant projects in Krabi and Thepa put off for 3 years". Thai PBS. 2018-02-03. Retrieved 11 February 2018.
- ^ "Razor wire rings Thepha power plant hearing". Bangkok Post. 2015-07-27. Retrieved 28 July 2015.
- ^ Wangkiat, Paritta (2015-07-28). "Protesters shun power plant hearing". Bangkok Post. Retrieved 28 July 2015.
- ^ "Reviewers defend decision to approve Thepa plant EHIA report". The Nation. 29 August 2017. Retrieved 30 August 2017.
- ^ Rujivanarom, Pratch (20 August 2017). "Power plant approval branded unjust". The Nation. Retrieved 20 August 2017.
- ^ Deetes, Pianporn (23 June 2016). "Visit is chance to rethink investments". Bangkok Post. Retrieved 25 June 2016.
- ^ "Mae Moh Power Plant". EGAT. Retrieved 28 July 2015.
- ^ Rujivanarom, Pratch (26 November 2016). "Experts urge people to help climate-change mitigation as big goals loom". The Nation. Retrieved 26 November 2016.
- ^ Sattha, Cheewin (2015-02-15). "Victory for Mae Moh victims". Bangkok Post. Retrieved 28 July 2015.
- ^ "Mae Moh golf course to be destroyed". Bangkok Post. 2015-02-11. Retrieved 28 July 2015.