You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
GRACE-DA configuration seems to have a timing error, where the file output for the first day of the month does not include the analysis updates. The first day's output only represents the output from the model run of the first loop (used to calculate the innovations). When the model is rewound to write the analysis updates, the output is done from the second day of the month, due to a timing error in the rewinding process.
Steps to Replicate
Replace this text with instructions for replicating this bug.
The text was updated successfully, but these errors were encountered:
This update fixes the timing error in GRACE DA where the output for the
first day of the month does not reflect the analysis updates
Related to NASA-LIS#1474
Bug Description
GRACE-DA configuration seems to have a timing error, where the file output for the first day of the month does not include the analysis updates. The first day's output only represents the output from the model run of the first loop (used to calculate the innovations). When the model is rewound to write the analysis updates, the output is done from the second day of the month, due to a timing error in the rewinding process.
Steps to Replicate
Replace this text with instructions for replicating this bug.
The text was updated successfully, but these errors were encountered: