Content-Length: 10309 | pFad | http://www.ospo.noaa.gov/data/messages/2019/01/MSG_20190116_1624.html
Topic: GOES-17 ABI solar calibration scan scheduled for January 19, 2019
Date/Time Issued: January 16, 2019 1615 UTC
Product(s) or Data Impacted: GOES-17 ABI product outage
Date/Time of Initial Impact: January 19, 2019 0315 UTC
Date/Time of Expected End: January 19, 2019 0330 UTC
Length of Outage: Approximately 10 minutes at the end of a period of Continuous Full Disk operations
Details/Specifics of Change:
On January 19, 2019, GOES-17 ABI Flex Mode (mode 3) will be replaced with 15 minutes of Continuous Full Disk (mode 4) from 0315-0330 UTC. A GOES-17 ABI solar calibration scan will be performed between 0320-0330 UTC, resulting in an outage of all ABI products. ABI Flex Mode (mode 3) will resume at 0330 UTC. The next Full Disk scan will populate at 0330 UTC.
Contact Information for Further Information: ESPC Operations at ESPCOperations@noaa.gov or 301-817-3880
Web Site(s) for applicable information:
See https://www.ospo.noaa.gov/Operations/messages.html for this and other satellite related messages.
Fetched URL: http://www.ospo.noaa.gov/data/messages/2019/01/MSG_20190116_1624.html
Alternative Proxies: