Content-Length: 102459 | pFad | http://www.ospo.noaa.gov/data/messages/2022/MSG006160403.html
Message number: | 8637 |
Message creation: | Thu Jan 06 15:57:49 UTC 2022 |
Type: | Planned Maintenance |
Ann Nr: | 7582 |
Rev: | 1 |
Start Time: | 2021-12-07 00:00:00.0 |
End Time: | 2022-01-31 00:00:00.0 |
Satellites: | Metop-C |
Subsystem: | ASCAT |
Impact: | risk-of-interruption |
Detail: | Calibrations to support transponder test.. Short outages of the ASCAT GDS Level 1, soil moisture and global and regional winds products can be expected, during satellite passes over Turkey. |
Status: | scheduled |
Issue Time: | 2021-11-17 14:58:54.0 |
Services: |
ASCAT Soil Moisture - Metop-C ASCAT Level 1 - Metop-C |
Type: | Service Enhancement |
Ann Nr: | 7704 |
Rev: | 1 |
Start Time: | 2021-12-29 00:00:00.0 |
End Time: | 2022-02-01 23:59:00.0 |
Satellites: | NOAA-20 |
Subject: | general-announcement |
Detail: | Due to a potential post-maneuver conjunction, NOAA-20 has postponed its Drag Makeup Maneuver (DMU). This will cause NOAA-20 to leave its nominal ground track box on December 29th 2021, crossing the eastern edge. This box is +/- 20 kilometers equatorial longitudinal offset from the reference ground track. The maximum distance reached outside the eastern edge of the box is expected to be about 10 kilometers. The re-planned Drag Makeup Maneuver (DMU) will be performed on January 13th, 2022 at 1628 UTC to correct the drift. The expected date to return to the nominal ground track box is February 1st, 2022. This may vary with the performance of the maneuver. Another notice will be sent when the return to the nominal ground track box is known. The exact times will be announced closer to the events. |
Status: | scheduled |
Issue Time: | 2021-12-22 11:06:58.0 |
Services: |
ATMS Level 1 - JPSS CrIS Level 1 - JPSS VIIRS EDR - JPSS |
Type: | Planned Maintenance |
Ann Nr: | 7740 |
Rev: | 1 |
Start Time: | 2022-01-10 02:00:00.0 |
End Time: | 2022-01-18 05:00:00.0 |
Satellites: | Metop-B |
Subject: | ground-segment-maintenance |
Impact: | risk-of-delay |
Detail: | McMurdo ground segment Maintenance. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system may be impacted during the following maintenance period. Therefore only nominal Arctic timeliness may be available during this period. The maintenance period is the following: on 10 January from 02:00 to 08:00 UTC, on 11 January from 02:00 to 08:00 UTC, on 12 January from 01:00 to 04:30 UTC, on 13 January from 01:00 to 04:30, on 14 January from 01:00 to 04:30 UTC, and on 16 January from 23:00 to 05:00 UTC next day and on 17 January from 23:00 to 05:00 UTC next day. |
Status: | scheduled |
Issue Time: | 2022-01-05 16:02:18.0 |
Services: |
SEM L0 - Metop-B AVHRR Level 1 - Metop-B MHS Level 1 - Metop-B AMSU-A Level 1 - Metop-B HIRS Level 1 - Metop-B ASCAT Level 1 - Metop-B IASI Level 1 - Metop-B GRAS Level 1 - Metop-B GOME-2 Level 1 - Metop-B ATOVS Sounding products - Metop-B IASI Sounding Products - Metop-B ASCAT Soil Moisture - Metop-B AVHRR Polar Winds - Metop-B Multi-Sensor Products - Metop-B Multi-Metop Wind Products |
Type: | Planned Maintenance |
Ann Nr: | 7735 |
Rev: | 1 |
Start Time: | 2022-01-10 08:00:00.0 |
End Time: | 2022-01-10 10:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | EARS Lannion maintenance. MEOS upgrades, Phase I.There may be disruption to the listed EUMETSAT based services. |
Status: | scheduled |
Issue Time: | 2022-01-05 15:10:25.0 |
Services: |
EARS-ATOVS EARS-AVHRR EARS-MWRI EARS-ASCAT EARS-IASI EARS-ATMS EARS-CrlS EARS-VIIRS EARS-NWC EARS-VASS EARS-MERSI |
Type: | Planned Maintenance |
Ann Nr: | 7727 |
Rev: | 1 |
Start Time: | 2022-01-10 09:00:00.0 |
End Time: | 2022-01-10 11:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | data-delayed |
Detail: | Planned maintenance activity on the Data Services infrastructure, affecting Data Store and Data Tailor. Users may experience delays when accessing data. |
Status: | scheduled |
Issue Time: | 2022-01-05 14:26:49.0 |
Services: |
Data Store and Data Tailor Web Service |
Type: | Planned Maintenance |
Ann Nr: | 7733 |
Rev: | 1 |
Start Time: | 2022-01-10 15:19:00.0 |
End Time: | 2022-01-10 15:25:00.0 |
Satellites: | Metop-C |
Subsystem: | ASCAT |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | Gain Compression |
Status: | scheduled |
Issue Time: | 2022-01-05 14:56:19.0 |
Services: |
ASCAT Soil Moisture - Metop-C ASCAT Level 1 - Metop-C EARS-ASCAT ASCAT AHRPT Metop-C OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 7732 |
Rev: | 1 |
Start Time: | 2022-01-11 08:00:00.0 |
End Time: | 2022-01-11 08:07:00.0 |
Satellites: | Metop-C |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2022-01-05 14:55:25.0 |
Services: |
SEM L0 - Metop-C SEM AHRPT Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 7729 |
Rev: | 1 |
Start Time: | 2022-01-11 08:49:00.0 |
End Time: | 2022-01-11 08:56:00.0 |
Satellites: | Metop-B |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2022-01-05 14:51:27.0 |
Services: |
SEM L0 - Metop-B SEM AHRPT Metop-B |
Type: | Planned Maintenance |
Ann Nr: | 7730 |
Rev: | 1 |
Start Time: | 2022-01-11 08:49:00.0 |
End Time: | 2022-01-11 10:32:00.0 |
Satellites: | Metop-B |
Subsystem: | SEM |
Component: | TED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM TED in flight calibration. |
Status: | scheduled |
Issue Time: | 2022-01-05 14:51:48.0 |
Services: |
SEM L0 - Metop-B SEM AHRPT Metop-B |
Type: | Planned Maintenance |
Ann Nr: | 7706 |
Rev: | 1 |
Start Time: | 2022-01-11 09:00:00.0 |
End Time: | 2022-01-11 16:00:00.0 |
Satellites: | Metop-B,Metop-C |
Subject: | ground-segment-maintenance |
Impact: | data-unavailable |
Detail: | Software maintenance, affecting the ATOVS Level 1 and Level 2 products. The expected outage in production is approximately 2 hours. |
Status: | scheduled |
Issue Time: | 2021-12-22 13:12:32.0 |
Services: |
ATOVS Sounding products - Metop-B ATOVS sounding products - Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 7728 |
Rev: | 1 |
Start Time: | 2022-01-11 19:58:00.0 |
End Time: | 2022-01-11 19:59:00.0 |
Satellites: | MET-8 |
Subject: | in-plane-manoeuvre |
Impact: | data-degraded |
Detail: | East-West Station Keeping Manoeuvre. Users may experience degraded image quality and degraded meteorological product quality up to a few hours after the manoeuvre. |
Status: | scheduled |
Issue Time: | 2022-01-05 14:44:19.0 |
Services: |
IODC SEVIRI Level 1.5 Image Data IODC Meteosat Meteorological Products |
Type: | Planned Maintenance |
Ann Nr: | 7736 |
Rev: | 1 |
Start Time: | 2022-01-11 23:00:00.0 |
End Time: | 2022-01-12 05:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | EARS Maspalomas PCCW Data Line Maintenance. There may be disruption to the listed EUMETSAT based services. |
Status: | scheduled |
Issue Time: | 2022-01-05 15:11:19.0 |
Services: |
EARS-ATOVS EARS-MWRI EARS-AVHRR EARS-ASCAT EARS-IASI EARS-ATMS EARS-CrlS EARS-VIIRS EARS-MERSI EARS-VASS EARS-NWC |
Type: | Planned Maintenance |
Ann Nr: | 7726 |
Rev: | 1 |
Start Time: | 2022-01-12 08:18:00.0 |
End Time: | 2022-01-12 08:29:00.0 |
Satellites: | Sentinel-3B |
Subject: | in-plane-manoeuvre |
Impact: | data-degraded |
Detail: | Reduced data quality should be expected for data sensed during this period. |
Status: | scheduled |
Issue Time: | 2022-01-05 09:12:12.0 |
Services: |
SLSTR Level 1 Products - S3B SLSTR Level 2 Atmospheric Products - S3B SLSTR Level 2 Marine Products - S3B SRAL Level 1 Products - S3B SRAL Level 2 Marine Products - S3B |
Type: | Planned Maintenance |
Ann Nr: | 7707 |
Rev: | 1 |
Start Time: | 2022-01-12 09:00:00.0 |
End Time: | 2022-01-12 16:00:00.0 |
Satellites: | Metop-B,Metop-C |
Subsystem: | ASCAT |
Subject: | ground-segment-maintenance |
Impact: | data-unavailable |
Detail: | Software maintenance, affecting the ASCAT Level 1 and ASCAT Level 2 (Soil Mosture) products. The expected outage in production is approximately 2 hours. |
Status: | scheduled |
Issue Time: | 2021-12-22 13:13:00.0 |
Services: |
ASCAT Level 1 - Metop-B ASCAT Soil Moisture - Metop-B ASCAT Soil Moisture - Metop-C ASCAT Level 1 - Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 7737 |
Rev: | 1 |
Start Time: | 2022-01-13 09:00:00.0 |
End Time: | 2022-01-13 09:00:00.0 |
Satellites: | Suomi NPP |
Subject: | VIIRS Lunar Roll |
Impact: | data-unavailable |
Detail: | Lunar Calibration.The exact time will be announced closer to the day of the manoeuvre. |
Status: | scheduled |
Issue Time: | 2022-01-05 15:19:16.0 |
Services: |
ATMS Level 1 - JPSS CrIS Level 1 - JPSS VIIRS EDR - JPSS EARS-VIIRS SNPP - JPSS Copernicus data |
Type: | Planned Maintenance |
Ann Nr: | 7738 |
Rev: | 1 |
Start Time: | 2022-01-13 09:00:00.0 |
End Time: | 2022-01-13 09:00:00.0 |
Satellites: | NOAA-20 |
Subject: | VIIRS Lunar Roll |
Impact: | data-unavailable |
Detail: | Lunar Calibration.The exact time will be announced closer to the day of the manoeuvre. |
Status: | scheduled |
Issue Time: | 2022-01-06 11:34:11.0 |
Services: |
ATMS Level 1 - JPSS CrIS Level 1 - JPSS VIIRS EDR - JPSS EARS-VIIRS SNPP - JPSS Copernicus data |
Type: | Planned Maintenance |
Ann Nr: | 7739 |
Rev: | 1 |
Start Time: | 2022-01-13 09:00:00.0 |
End Time: | 2022-01-13 09:00:00.0 |
Satellites: | NOAA-20 |
Subject: | in-plane-manoeuvre |
Impact: | data-unavailable |
Detail: | Drag Make-Up manoeuvre (DMU). This may cause data to be unavailable or degraded. The exact time will be announced closer to the manoeuvre. |
Status: | scheduled |
Issue Time: | 2022-01-06 12:54:27.0 |
Services: |
ATMS Level 1 - JPSS CrIS Level 1 - JPSS VIIRS EDR - JPSS EARS-VIIRS SNPP - JPSS Copernicus data |
Type: | Planned Maintenance |
Ann Nr: | 7731 |
Rev: | 1 |
Start Time: | 2022-01-14 04:25:00.0 |
End Time: | 2022-01-14 11:12:00.0 |
Satellites: | Metop-B |
Subsystem: | IASI |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | External Calibration. Lunar acquisition. CS2 campaign. |
Status: | scheduled |
Issue Time: | 2022-01-05 14:54:24.0 |
Services: |
IASI Level 1 - Metop-B IASI Sounding Products - Metop-B EARS-IASI IASI AHRPT Metop-B OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 7734 |
Rev: | 1 |
Start Time: | 2022-01-14 05:18:00.0 |
End Time: | 2022-01-14 12:13:00.0 |
Satellites: | Metop-C |
Subsystem: | IASI |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | External Calibration. Lunar acquisition. CS2 campaign. |
Status: | scheduled |
Issue Time: | 2022-01-05 15:00:41.0 |
Services: |
IASI Level 1 - Metop-C IASI Sounding products- Metop-C EARS-IASI IASI AHRPT Metop-C OSI SAF - Products |
Type: | Service Enhancement |
Ann Nr: | 6944 |
Rev: | 2 |
Start Time: | 2022-01-17 09:00:00.0 |
End Time: | 2022-01-17 09:00:00.0 |
Subject: | general-announcement |
Detail: | Change to DCP messages disseminated on EUMETCast. They will no longer be wrapped into LRIT files and, instead, will be disseminated as individual files. This will also involve a filename change and a change of EUMETCast channels. For full details, see the URL provided below. [Rev. 2] Date changed from 9 November 2021 to 17 January 2022. To facilitate user transition, there will be a period of parallel dissemination from 17 January to 17 March 2022. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/change-dcp-messages-disseminated-eumetcast |
Status: | scheduled |
Issue Time: | 2021-10-18 14:43:13.0 |
Services: |
Meteosat 0° DCP Meteosat IODC DCP |
Type: | Planned Maintenance |
Ann Nr: | 7680 |
Rev: | 1 |
Start Time: | 2022-01-17 09:00:00.0 |
End Time: | 2022-01-24 09:00:00.0 |
Satellites: | MET-11 |
Subject: | instrument-decontamination |
Impact: | data-unavailable |
Detail: | SEVIRI decontamination. Meteosat-9 will cover the Full Earth Scan service during the decontamination period. Meteosat-9 data will also be disseminated on EUMETCast Europe one week before and one week after Meteosat-11 decontamination, i.e. from 10/01 to 31/01/2022. An outage of up to two repeat cycles can be expected when switching to and from Meteosat-9. Users wishing to receive the parallel Meteosat data streams on EUMETCast should register with our User Helpdesk (ops@eumetsat.int). For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/upcoming-meteosat-11-seviri-decontamination-2022 |
Status: | scheduled |
Issue Time: | 2021-12-16 14:33:33.0 |
Services: |
0° SEVIRI Level 1.5 Image Data 0° Meteosat Meteorological Products |
Type: | Service Enhancement |
Ann Nr: | 7677 |
Rev: | 1 |
Start Time: | 2022-01-18 09:00:00.0 |
End Time: | 2022-01-18 09:00:00.0 |
Subject: | product-change |
Detail: | Release of new Processing Baselines for Sentinel-3 SLSTR Level 1 and Level 2 SST products. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/new-processing-baselines-slstr-level-1-2-sst |
Status: | scheduled |
Issue Time: | 2021-12-16 10:07:26.0 |
Services: |
SLSTR Level 1 Products - S3A SLSTR Level 2 Marine Products - S3A SLSTR Level 1 Products - S3B SLSTR Level 2 Marine Products - S3B |
Type: | Planned Maintenance |
Ann Nr: | 7655 |
Rev: | 1 |
Start Time: | 2022-01-20 09:00:00.0 |
End Time: | 2022-01-20 12:00:00.0 |
Satellites: | Metop-B,Metop-C |
Subsystem: | IASI |
Subject: | general-announcement |
Impact: | no-impact |
Detail: | Instrument-calibration – new IASI L1 processing version 8.4. |
Status: | scheduled |
Issue Time: | 2021-12-09 14:20:45.0 |
Services: |
IASI Level 1 - Metop-B IASI Level 1 - Metop-C EARS-IASI |
Type: | Planned Maintenance |
Ann Nr: | 7678 |
Rev: | 1 |
Start Time: | 2022-01-23 09:00:00.0 |
End Time: | 2022-01-23 12:00:00.0 |
Satellites: | Metop-C |
Subsystem: | IASI |
Subject: | instrument-calibration |
Impact: | no-impact |
Detail: | Update of the on-board coding table for the scan mirror characterisation. |
Status: | scheduled |
Issue Time: | 2021-12-16 11:43:21.0 |
Services: |
IASI Level 1 - Metop-C EARS-IASI |
Type: | Planned Maintenance |
Ann Nr: | 7679 |
Rev: | 1 |
Start Time: | 2022-01-23 09:00:00.0 |
End Time: | 2022-01-23 12:00:00.0 |
Satellites: | Metop-B |
Subsystem: | IASI |
Subject: | instrument-calibration |
Impact: | no-impact |
Detail: | Update of the on-board coding table for the scan mirror characterisation. |
Status: | scheduled |
Issue Time: | 2021-12-16 11:39:43.0 |
Services: |
IASI Level 1 - Metop-B EARS-IASI |
Type: | Planned Maintenance |
Ann Nr: | 7743 |
Rev: | 1 |
Start Time: | 2022-01-26 09:00:00.0 |
End Time: | 2022-01-26 09:00:00.0 |
Satellites: | Metop-B |
Subject: | in-plane-manoeuvre |
Impact: | data-degraded |
Detail: | Routine in-plane manoeuvre. Reduced data quality should be expected for data sensed during this period. The exact burn time will be announced closer to the day of the manoeuvre. |
Status: | scheduled |
Issue Time: | 2022-01-06 09:51:33.0 |
Services: |
SEM L0 - Metop-B AVHRR Level 1 - Metop-B AMSU-A Level 1 - Metop-B MHS Level 1 - Metop-B HIRS Level 1 - Metop-B ASCAT Level 1 - Metop-B IASI Level 1 - Metop-B GRAS Level 1 - Metop-B ATOVS Sounding products - Metop-B GOME-2 Level 1 - Metop-B IASI Sounding Products - Metop-B ASCAT Soil Moisture - Metop-B AVHRR Polar Winds - Metop-B Multi-Sensor Products - Metop-B A-DCS AHRPT Metop-B ASCAT AHRPT Metop-B AMSU-A AHRPT Metop-B AVHRR AHRPT Metop-B GRAS AHRPT Metop-B GOME-2 AHRPT Metop-B HIRS AHRPT Metop-B MHS AHRPT Metop-B IASI AHRPT Metop-B SEM AHRPT Metop-B |
Type: | Service Enhancement |
Ann Nr: | 7533 |
Rev: | 1 |
Start Time: | 2022-02-01 09:00:00.0 |
End Time: | 2022-03-22 09:00:00.0 |
Subject: | general-announcement |
Detail: | The EUMETCast Europe Basic Service channels will be reorganised in the first quarter of 2022. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/eumetcast-basic-service-channels-reorganisation |
Status: | scheduled |
Issue Time: | 2021-11-03 15:27:49.0 |
Services: |
EUMETCast-Europe |
Type: | Planned Maintenance |
Ann Nr: | 7741 |
Rev: | 1 |
Start Time: | 2022-02-01 11:45:00.0 |
End Time: | 2022-02-01 13:19:00.0 |
Satellites: | Metop-B |
Subsystem: | GRAS |
Subject: | general-announcement |
Impact: | data-unavailable |
Detail: | GRAS receiver software update. |
Status: | scheduled |
Issue Time: | 2022-01-05 16:12:10.0 |
Services: |
GRAS Level 1 - Metop-B |
Type: | Planned Maintenance |
Ann Nr: | 7742 |
Rev: | 1 |
Start Time: | 2022-02-02 12:15:00.0 |
End Time: | 2022-02-02 13:51:00.0 |
Satellites: | Metop-C |
Subsystem: | GRAS |
Subject: | general-announcement |
Impact: | data-unavailable |
Detail: | GRAS receiver software update. |
Status: | scheduled |
Issue Time: | 2022-01-05 16:13:39.0 |
Services: |
GRAS Level 1 - Metop-C |
Type: | Service Enhancement |
Ann Nr: | 7033 |
Rev: | 3 |
Start Time: | 2022-03-31 09:00:00.0 |
End Time: | 2022-03-31 09:00:00.0 |
Subject: | product-change |
Detail: | Principal Component (PC) compressed IASI L1C data will be updated in November 2021 (exact date to be announced in due course). For full details, see the URL provided below. [Rev. 2]: The update is being deferred to Q1 2022, with exact date to be announced in due course. [Rev. 3]: A live test data stream has been put in place. For details on how to access the data and how to use them, see the URL provided below. |
Url: | https://www.eumetsat.int/changes-pc-compressed-iasi-l1c-data |
Status: | scheduled |
Issue Time: | 2021-11-25 14:35:01.0 |
Services: |
IASI Level 1 - Metop-A IASI Level 1 - Metop-B IASI Level 1 - Metop-C |
Type: | Service Enhancement |
Ann Nr: | 7329 |
Rev: | 1 |
Start Time: | 2022-07-01 09:00:00.0 |
End Time: | 2022-07-01 09:00:00.0 |
Subject: | general-announcement |
Detail: | Transponder migration for the EUMETCast Europe High Volume Service planned for Q3 2022. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/eumetcast-europe-service-transponder-migration |
Status: | scheduled |
Issue Time: | 2021-09-08 16:58:29.0 |
Services: |
EUMETCast-Europe |
Type: | Service Enhancement |
Ann Nr: | 7414 |
Rev: | 1 |
Start Time: | 2022-10-01 09:00:00.0 |
End Time: | 2022-10-01 09:00:00.0 |
Subject: | product-change |
Detail: | File formats of Meteosat meteorological products distributed on EUMETCast are planned to be updated in October 2022. At the same time, there will be a small change in the timestamp of the AMV products distributed on the GTS. For full details and test data, see the URL provided below. |
Url: | https://www.eumetsat.int/change-file-formats-meteosat-meteorological-products |
Status: | scheduled |
Issue Time: | 2021-09-30 13:23:12.0 |
Services: |
0° Meteosat Meteorological Products IODC Meteosat Meteorological Products RSS Meteosat Meteorological Products |
Name: | EUMETSAT |
Address: |
Eumetsat-Allee 1 D-64295 Darmstadt Germany |
Telephone: | +49 6151 807 3660/3770 |
Fax: | +49 6151 807 3790 |
E-mail: | ops@eumetsat.int |
Internet: | www.eumetsat.int |
Fetched URL: http://www.ospo.noaa.gov/data/messages/2022/MSG006160403.html
Alternative Proxies: