Content-Length: 3074 | pFad | http://www.ospo.noaa.gov/data/messages/2024/02/MSG_20240228_2211.html

Topic: GOES-18 - ABI L1b Band 09 Full Disk, Band 15 MESO-1 products delivered to AWIPS, GRB, PDA - Issued: Feb 28, 2024 2211Z
 
Date/Time Issued: Feb 28, 2024 2211Z
 
Product or Data Impacted: GOES-18 ABI L1b Bands 09, 15 and derived products Full Disk, MESO 1 delivered to AWIPS, GRB, PDA.
 
Date/Time of Initial Impact: Feb 28, 2024 2124Z
 
Date/Time of Expected End: TBD
 
Length of the Outage/Event: 
 
Details/Specifics of Change: GOES-18 ABI L1b Bands 09, 15 and derived products Full Disk, MESO 1 delivered to AWIPS, GRB, PDA. KPPs impacted.
 
Contact information for further information: ESPC Operations at ESPCOperations@noaa.gov or 301-817-3880 24x7 or goes-r.product.engineering.group@noaa.gov during normal business hours









ApplySandwichStrip

pFad - (p)hone/(F)rame/(a)nonymizer/(d)eclutterfier!      Saves Data!


--- a PPN by Garber Painting Akron. With Image Size Reduction included!

Fetched URL: http://www.ospo.noaa.gov/data/messages/2024/02/MSG_20240228_2211.html

Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy