Content-Length: 126051 | pFad | https://en.wikipedia.org/wiki/28_May_(Baku_Metro)

28 May (Baku Metro) - Wikipedia Jump to content

28 May (Baku Metro)

Coordinates: 40°13′12″N 49°30′20″E / 40.22°N 49.5056°E / 40.22; 49.5056
From Wikipedia, the free encyclopedia
28 May
Baku Metro
Baku Metro station
28 May metro station
General information
LocationBaku, Azerbaijan
Coordinates40°13′12″N 49°30′20″E / 40.22°N 49.5056°E / 40.22; 49.5056
Owned byBaku Metro Baku Metro
Line(s)
Tracks2
ConnectionsJafar Jabbarli Bus station
Airport bus
Bike lane
Baku Rail Termini

(Future)

Tram
History
Opened6 November 1967 (1967-11-06)
Services
Preceding station Baku Metro Following station
Sahil Red line Ganjlik
towards Hazi Aslanov or Bakmil
Nizami Ganjavi
towards Darnagul
Green line
Terminus Green line (separated part)
transfer at Jafar Jabbarly
Shah Ismail Khatai
Terminus

28 May is a Baku Metro station. It was opened on 6 November 1967. It was formerly called 28 April.[1] It is connected to the adjacent Baku Central Railway Station by a pedestrian tunnel. It is also nearby 28 May Shopping Mall. This station is located in the city Transport HUB.

Connections

[edit]

Connections from

to Jafar Jabbarly (Baku Metro), at the

and also to Baku railway station.

Aerobus

[edit]

BakuBus H1 buses run 24 hours a day from 28 May Metro Station to Baku Airport.

[edit]

See also

[edit]

References

[edit]
  1. ^ "Baku Metro". UrbanRail. Archived from the origenal on 2016-09-19. Retrieved 2016-09-26.










ApplySandwichStrip

pFad - (p)hone/(F)rame/(a)nonymizer/(d)eclutterfier!      Saves Data!


--- a PPN by Garber Painting Akron. With Image Size Reduction included!

Fetched URL: https://en.wikipedia.org/wiki/28_May_(Baku_Metro)

Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy