Content-Length: 903 | pFad | https://download.hao.ucar.edu/d5/mlso/log/observer/2016/mlso.2016d005.olog

----------------------------------------------------------------------------- Mauna Loa Solar Observatory Observer's Log ----------------------------------------------------------------------------- Tue Jan 5 16:41:20 GMT 2016 Year: 16 Doy: 005 Observer: berkey WEATHER COMMENT: Observer: Tue Jan 05 16:41:35 GMT 2016 Temp: 36.8f, Humidity: 4%, Pressure: 28.749in, Wind: 4mph from west, Skies: ___end___ GENERAL COMMENT BY berkey: Tue Jan 05 16:42:23 GMT 2016 The contractor has ordered a crane so we will at least prepare for dome swap today. Hope the winds stay lite. ___end___ GENERAL OBSERVATORY COMMENT BY stueben: Wed Jan 6 01:50:01 GMT 2016 Old dome has been removed, dome walls cut down and new dome put in place. No comments during the day as this was happening as the electricians were working in the control room and we didn't have easy access to the log. ___end___








ApplySandwichStrip

pFad - (p)hone/(F)rame/(a)nonymizer/(d)eclutterfier!      Saves Data!


--- a PPN by Garber Painting Akron. With Image Size Reduction included!

Fetched URL: https://download.hao.ucar.edu/d5/mlso/log/observer/2016/mlso.2016d005.olog

Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy