eIAF Changes for Grants Administration

The following changes relating to the electronic Internal Approval Form (eIAF) system are effective immediately:

  • The F&A enrichment split will now be determined during account setup once a project is awarded. The enrichment split information no longer needs to be included in the “Enrichment Award” section of the eIAF, thereby significantly reducing approvals required for submission.
  • eIAFs will no longer be required for general letters of intent (LOIs) or pre-proposals that do not require a detailed budget and budget justification.
  • CGO review/approval will be removed from the workflow process as this is now handled by the PI’s CGS Pre-Award Grant Specialist.
  • eIAFs will only require the PI and Co-Is who meet the sponsor’s definition of key personnel to sign (rather than all faculty as currently required).
  • Once the PI, their chair, and the ADR/Director have signed, the eIAF will be considered complete for submission purposes.
  • eIAF revisions will only be required when adding key personnel and will not be necessary for budget revisions or removing personnel.
  • Coming soon - Approval workflow will automatically advance for the next signature after 24 hours.

See related messages from the Acting Vice President for Research: Nov 25 and  Dec 4.

See OSPA Electronic Resources for eIAF guidance

pFad - Phonifier reborn

Pfad - The Proxy pFad of © 2024 Garber Painting. All rights reserved.

Note: This service is not intended for secure transactions such as banking, social media, email, or purchasing. Use at your own risk. We assume no liability whatsoever for broken pages.


Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy