Template:Nuclear power in the PRC: Difference between revisions
Appearance
Content deleted Content added
Agentjoerg (talk | contribs) Lufeng 5 under construction since September 8th 2022 |
m Lianjiang under construction |
||
Line 37: | Line 37: | ||
: [[Zhangzhou Nuclear Power Plant|Zhangzhou]] |
: [[Zhangzhou Nuclear Power Plant|Zhangzhou]] |
||
;Guangdong |
;Guangdong |
||
⚫ | |||
: [[Lufeng Nuclear Power Plant|Lufeng]] |
: [[Lufeng Nuclear Power Plant|Lufeng]] |
||
: [[Taipingling Nuclear Power Plant|Taipingling]] |
: [[Taipingling Nuclear Power Plant|Taipingling]] |
||
Line 46: | Line 47: | ||
| group3 = Planned power plants |
| group3 = Planned power plants |
||
| list3 = |
| list3 = |
||
;Guangdong |
|||
⚫ | |||
;Guangxi |
;Guangxi |
||
: [[Guangxi Bailong Nuclear Power Project|Bailong]] |
: [[Guangxi Bailong Nuclear Power Project|Bailong]] |
Revision as of 20:01, 9 October 2023
This template's initial visibility currently defaults to autocollapse
, meaning that if there is another collapsible item on the page (a navbox, sidebar, or table with the collapsible attribute), it is hidden apart from its title bar; if not, it is fully visible.
To change this template's initial visibility, the |state=
parameter may be used:
{{Nuclear power in the PRC|state=collapsed}}
will show the template collapsed, i.e. hidden apart from its title bar.{{Nuclear power in the PRC|state=expanded}}
will show the template expanded, i.e. fully visible.