Jump to content

Lyublinsko-Dmitrovskaya line

Route map:
From Wikipedia, the free encyclopedia
#10 Lyublinsko-Dmitrovskaya line Lyublinsko-Dmitrovskaya line
Overview
OwnerMoskovsky Metropoliten
LocaleMoscow
Termini
Stations26
Service
TypeRapid transit
SystemMoscow Metro
Operator(s)Moskovsky Metropoliten
Rolling stock81-717.5/714.5
81-717.5M/714.5M
81-717.6/714.6
History
Opened28 December 1995
Technical
Line length44.3 kilometres (27.5 mi)
CharacterUnderground
Track gauge1,520 mm (4 ft 11+2732 in)
ElectrificationThird rail
Route map

Fiztekh
Lianozovo
#D1 Line D1 (Moscow Central Diameters)
Yakhromskaya
Seligerskaya
Verkhniye Likhobory
Okruzhnaya
Ground transferTransfer for #14 Moscow Central Circle at Okruzhnaya Transfer for #D1 Line D1 (Moscow Central Diameters) at Okruzhnaya
Transfer for #9 Serpukhovsko-Timiryazevskaya line at Petrovsko-Razumovskaya via cross-platform interchange Ground transfer(Transfer for #D1 Line D1 (Moscow Central Diameters) at Petrovsko-Razumovskaya)
Fonvizinskaya
Ground transfer Transfer for #13 Moscow Monorail at Ulitsa Milashenkova
Butyrskaya
Ground transfer Ostankino railway station
Maryina Roshcha
Transfer for #11 Bolshaya Koltsevaya line at Maryina Roshcha
Dostoevskaya
(Transfer for #5 Koltsevaya line at Suvorovskaya)
Trubnaya
Transfer for #9 Serpukhovsko-Timiryazevskaya line at Tsvetnoy Bulvar
Sretensky Bulvar
Transfer for #1 Sokolnicheskaya line at Chistye Prudy Transfer for #6 Kaluzhsko-Rizhskaya line at Turgenevskaya
Chkalovskaya
Kursky railway station Transfer for #3 Arbatsko-Pokrovskaya line at Kurskaya Transfer for #5 Koltsevaya line at Kurskaya (Transfer for #D2 Line D2 (Moscow Central Diameters) at Moscow Kursky)
Rimskaya
Transfer for #8 Kalininskaya line at Ploshchad Ilyicha Ground transferTransfer for #D2 Line D2 (Moscow Central Diameters) at Serp i MolotMoskva-Tovarnaya railway station
Krestyanskaya Zastava
Transfer for #7 Tagansko-Krasnopresnenskaya line at Proletarskaya
Dubrovka
Ground transferTransfer for #14 Moscow Central Circle at Dubrovka
Kozhukhovskaya
(Transfer for #16 Troitskaya line at Kozhukovskaya) Ground transferTransfer for #14 Moscow Central Circle at Dubrovka
Yuzhny Port
Pechatniki
Transfer for #11 Bolshaya Koltsevaya line at Pechatniki Ground transferTransfer for #D2 Line D2 (Moscow Central Diameters) at Pechatniki
Volzhskaya
Lyublino
Bratislavskaya
Maryino
Borisovo
Shipilovskaya
Zyablikovo
Transfer for #2 Zamoskvoretskaya line at Krasnogvardeyskaya

The Lyublinsko-Dmitrovskaya line (Russian: Любли́нско-Дми́тровская ли́ния, IPA: [lʲuˈblʲinskə ˈdmʲitrəfskəjə ˈlʲinʲɪjə]) (Line 10; Light Green Line) is a line of the Moscow Metro. The line first opened in 1995 as a radial stretch of rail connecting Chkalovskaya station in the center with Maryino station in the southeast and has been greatly expanded northwards since. Before 2007, it was known as "Lyublinskaya line" (Любли́нская ли́ния) by the name of the district of Lyublino that it passes through. As of 2024, the line has 44.3 kilometres (27.5 mi) of track and 26 stations, making it the longest fully-underground line in the Moscow Metro and one of the longest tunnels in the world.

History

[edit]

Plans

[edit]

In the early 1980s, the Moscow development plan put forward several ideas about solving the build-up that came as a result of the radial-ring alignment which has determined the development of the Moscow Metro since the mid-1950s. In the previous programme the radial lines, with an ever-increasing build-up of passengers, were forced to use the central transfer points and those on the ring, severely overcrowding the system.

In attempt to solve this problem, the future Lyublinskaya line was designed so that some of its transfer points would be outside the Koltsevaya line. This meant it would begin at the ring before extending south to the Kursky Rail Terminal, Perovsky, and Zhdanovsky. The ultimate goal of the line was to then bring the metro to the new developing districts of Maryino and Lyublino in the south-east of Moscow.

The initial design when bringing the new line to the new districts was to follow Lyublinskaya Street, not far from the bank of the Moskva River. However, after several debates, this was altered and the line would continue westwards until it reached Volzhsky Boulevard and only then turn southwards towards the districts of Lyublino. Although this left out the possibility of railway transfer with Kurskaya, it did allow the metro to enter into the heart of the region more thoroughly.

1990s and later

[edit]

The change in plans, combined with the financial crises that beset the metro construction in the 1990s, meant that the first stage opened with delays. In late 1995 the first section finally opened, and a year later it would reach Maryino. Several problems were encountered with the construction, particularly for Dubrovka. This station was left incomplete due to nearby factories heating up the soil, which prevented the freezing of the underground water to allow the construction of an escalator tunnel. However, in the late 1990s, because of the financial crises which paralyzed most of the industries, the metro-builders were able to complete the station.

Despite the delays, the line demonstrated some of the newest methods for metro-building. Deep-level stations were built on a monolithic concrete plate instead of a conventional tubular base. Also, the new wall-column design was introduced on two of the deep-level stations and a single-deck for the shallow ones. New finishing materials, such as a fibreglass vaults, were added to offer more reliable waterproofing.

The development of further extensions was for many years delayed and paralyzed by the lack of finances, and only in 2005 construction was resumed on the long-awaited second stage towards the city centre, with Trubnaya being the first to open on August 30, 2007. Sretensky Bulvar was opened on this section on December 29 the same year.

The second segment of a central extension was opened on June 19, 2010 (construction was resumed only in early 2007) and included two stations Dostoyevskaya and Maryina Roshcha.

In a separate case, a three station extension from Maryino to Zyablikovo (Lyublinsky (southern) radius) began in 1997, but in 2000 the construction sites of the stations Borisovo, Shipilovskaya, and Zyablikovo was abandoned. The importance of this is that Zyablikovo will be a transfer to the Krasnogvardeyskaya station of the Zamoskvoretskaya line. In 2008 construction finally resumed and the stations were opened on 2 December 2011, together with the transfer to the Krasnogvardeyskaya station.

The extension of the line from Maryina Roshcha northwest to Petrovsko-Razumovskaya via Butyrskaya and Fonvizinskaya was originally planned to be opened in December 2015.[1] The projected opening date was later shifted to 2016.[2] The stations were opened on 16 September 2016. Further extension to the north to Seligerskaya is operational and opened on 22 March 2018.[3]

Timeline

[edit]
Segment Date opened Length
ChkalovskayaVolzhskaya 1995-12-28 12.1 km
VolzhskayaMaryino 1996-12-25 5.4 km
Dubrovka 1999-12-11 N/A
ChkalovskayaTrubnaya 2007-08-30 3.7 km
Sretensky Bulvar 2007-12-29 N/A
TrubnayaMaryina Roshcha 2010-06-19 3.5 km
MaryinoZyablikovo 2011-12-02 4.5 km
Maryina RoshchaPetrovsko-Razumovskaya 2016-09-16 4.4 km
Petrovsko-RazumovskayaSeligerskaya 2018-03-22 4.9 km
SeligerskayaFiztekh 2023-09-07 6 km
Total: 26 stations

Stations

[edit]
Station Name Transfers
English Russian
Fiztekh 'Физтех
Lianozovo Лианозово #D1 Line D1 (Moscow Central Diameters) Lianozovo
Yakhromskaya Яхромская
Seligerskaya Селигерская
Verkhniye Likhobory Верхние Лихоборы
Okruzhnaya Окружная Transfer for #14 Moscow Central Circle at Okruzhnaya Okruzhnaya
Transfer for #D1 Line D1 (Moscow Central Diameters) at Okruzhnaya Okruzhnaya
Petrovsko-Razumovskaya Петровско-Разумовская Transfer for #9 Serpukhovsko-Timiryazevskaya line at Petrovsko-Razumovskaya Petrovsko-Razumovskaya
Transfer for #D1 Line D1 (Moscow Central Diameters) at Petrovsko-Razumovskaya Petrovsko-Razumovskaya
Transfer for #D3 Line D3 (Moscow Central Diameters) at Petrovsko-Razumovskaya Petrovsko-Razumovskaya
Fonvizinskaya Фонвизинская Transfer for #13 Moscow Monorail at Ulitsa Milashenkova Ulitsa Milashenkova
Butyrskaya Бутырская #D3 Line D3 (Moscow Central Diameters) Ostankino
Maryina Roshcha Марьина Роща Transfer for #11 Bolshaya Koltsevaya line at Maryina Roshcha Maryina Roshcha
#D2 Line D2 (Moscow Central Diameters) #D4 Line D4 (Moscow Central Diameters) Maryina Roshcha
Dostoyevskaya Достоевская Transfer for #5 Koltsevaya line at Suvorovskaya Suvorovskaya
Trubnaya Трубная Transfer for #9 Serpukhovsko-Timiryazevskaya line at Tsvetnoy Bulvar Tsvetnoy Bulvar
Sretensky Bulvar Сретенский бульвар Transfer for #1 Sokolnicheskaya line at Chistye Prudy Chistye Prudy
Transfer for #6 Kaluzhsko-Rizhskaya line at Turgenevskaya Turgenevskaya
Chkalovskaya Чкаловская Transfer for #3 Arbatsko-Pokrovskaya line at Kurskaya Kurskaya
Transfer for #5 Koltsevaya line at Kurskaya Kurskaya
#D2 Line D2 (Moscow Central Diameters) Transfer for #D4 Line D4 (Moscow Central Diameters) at Moscow Kursky Moscow Kursky
Rimskaya Римская Transfer for #8 Kalininskaya line at Ploshchad Ilyicha Ploshchad Ilyicha
#D2 Line D2 (Moscow Central Diameters) Transfer for #D4 Line D4 (Moscow Central Diameters) at Serp i Molot Serp i Molot
Krestyanskaya Zastava Крестьянская застава Transfer for #7 Tagansko-Krasnopresnenskaya line at Proletarskaya Proletarskaya
Dubrovka Дубровка Transfer for #14 Moscow Central Circle at Dubrovka Dubrovka
Kozhukhovskaya Кожуховская
Yuzhny Port Южный порт
Pechatniki Печатники Transfer for #11 Bolshaya Koltsevaya line at Pechatniki Pechatniki
#D2 Line D2 (Moscow Central Diameters) Transfer for #D5 Line D5 (Moscow Central Diameters) at Pechatniki Pechatniki
Volzhskaya Волжская
Lyublino Люблино
Bratislavskaya Братиславская
Maryino Марьино
Borisovo Борисово
Shipilovskaya Шипиловская
Zyablikovo Зябликово Transfer for #2 Zamoskvoretskaya line at Krasnogvardeyskaya Krasnogvardeyskaya

Rolling stock

[edit]

The line is served by the Pechatniki depot (#15) and Likhobory depot (#18) . 81-717/714 (including .5 and .5M modifications) wagons are used since the opening of the line. In 1998-2004 some new 81-720/721 (and .1) "Yauza" trains were received, but now their production is stopped. Some "Yauza" trains (except the original, which were retired) are still in service, but all the new rolling stock used on the line are 81-717/714.5/.5M and 81-717/714.6.

Subway car types used on the line over the years:

-Series 81-717.5: 1995–present

-Series 81-717.5M: 1995–present

-Series 81-720/721: 1998 - 2008

-Series 81-720.1/721.1: 2005 - 2019

-Series 81-717.6: 2011–present

-Series 81-760/761: 2016 (one train)

Future plans

[edit]

In early November 2017, it became known that between the stations Kozhukhovskaya and Pechatniki of the Lublin radius, a new station Yuzhny Port could be built, which will be located in the industrial zone. It is scheduled to be constructed from 2022 through 2023.[4]

In the Fall of 2019, Andrey Bochkarev confirmed that the station is planned to be built before the end of 2023. According to the targeted investment program of Moscow from 2022 to 2023, 7 billion rubles will be allocated for the construction of the station with the working name Yuzhny Port.

References

[edit]
  1. ^ "Станции метро "Окружная", "Верхние Лихоборы" и "Селигерская" откроют до конца 2016 года" (in Russian). Interfax. 29 January 2015. Retrieved 7 October 2015.
  2. ^ "Открытие станции "Бутырская" перенесли на 2016 год" (in Russian). Marfino.ru. 25 June 2015. Retrieved 7 October 2015.
  3. ^ Информационная служба портала Стройкомплекса (2018-03-22). "Станции метро "Окружная", "Верхние Лихоборы" и "Селигерская" открыты – Собянин". stroi.mos.ru. Комплекс градостроительной политики и строительства города Москвы. Retrieved 2018-03-22.
  4. ^ "Moscow to start construction works for two new metro lines". Railway PRO. 2020-02-26. Retrieved 2020-05-29.
[edit]
KML is from Wikidata
pFad - Phonifier reborn

Pfad - The Proxy pFad of © 2024 Garber Painting. All rights reserved.

Note: This service is not intended for secure transactions such as banking, social media, email, or purchasing. Use at your own risk. We assume no liability whatsoever for broken pages.


Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy