[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

20000317: NGM operational changes




James,
did I send this to you? If I already did, heres another copy.
Anyhow, it mentioned a little tweaking of the NGM that seemed to coincide
with the data we missed.

Steve


---------- Forwarded message ---------- 
Date: Fri, 17 Mar 2000 11:34:04 -0700
(MST) From: Unidata Local Data Manager <address@hidden> To:
address@hidden Subject: ADMIN NOTICE NOUS41 KWBC


873 NOUS41 KWBC 171832 PNSWSH
       
PUBLIC INFORMATION STATEMENT...TECHNICAL IMPLE. NOTICE 00-06 NATIONAL WEATHER
SERVICE HEADQUARTERS WASHINGTON DC 130 PM EST FRI MAR 17 2000
 
TO FAMILY SERVICES/FOS/SUBSCRIBERS...NOAAPORT
          SUBSCRIBERS...OTHER NATIONAL
          WEATHER SERVICE /NWS/ CUSTOMERS...NWS EMPLOYEES
       
FROM THERESE Z PIERCE...CHIEF...HYDROMETEOROLOGICAL SERVICES
                 
SUBJECT CHANGES TO THE NCEP NESTED GRID MODEL...EFFECTIVE MARCH
          15 2000
                  
I. RATIONALE FOR CHANGES
     
   AT 1200 UTC 15 MARCH 2000 (TENTATIVE) A SERIES OF CHANGES TO THE
INITIALIZATION PROCEDURE FOR THE NCEP NESTED GRID MODEL WERE MADE. SINCE THE
DISABLING OF THE NCEP CRAY C-90 COMPUTER ON 27 SEPTEMBER 1999...THE NGM HAS BEEN
RUN ON A CRAY J-90 WHICH IS 3-4 TIMES SLOWER THAN THE C-90. THUS... NGM PRODUCTS
ARE NOW AVAILABLE ABOUT ONE HOUR LATER THAN BEFORE.
     
  SINCE NWS FIELD FORECASTERS AND OUTSIDE CUSTOMERS ARE STILL HEAVILY DEPENDENT
ON TIMELY NGM AND NGM MOS PRODUCTS... AND BECAUSE THERE ARE NO FUNDS TO MAINTAIN
THE CRAY J-90 IN OPERATIONS BEYOND MARCH 2000...THERE WAS A NEED FOR NCEP'S
ENVIRONMENTAL MODELING CENTER (EMC) TO CONVERT THE NGM TO RUN ON THE NEW IBM-SP
COMPUTER. CONVERSION OF THE ENTIRE SUITE OF CODES WHICH RAN ON THE C-90
(INCLUDING THE REGIONAL OPTIMUM INTERPOLATION (ROI) ANALYSIS) USING IBM'S
MESSAGE PASSING INTERFACE (MPI) WAS ESTIMATED TO TAKE 2 PERSON YEARS OF WORK.  
SUCH AN EFFORT WAS NEITHER FEASIBLE NOR COST EFFECTIVE.
     
   TO SATISFY BOTH THE USERS' REQUIREMENTS FOR A TIMELY NGM FORECAST AND NCEP'S
REQUIREMENTS FOR A MAINTAINABLE NGM SYSTEM...THE FOLLOWING CHANGES WERE MADE:
     
  - NGM INITIAL CONDITIONS WILL BE OBTAINED FROM THE MESO ETA ANALYSIS OVER
NORTH AMERICA...AND FROM A 6-H AVN FORECAST OVER THE REST OF THE NORTHERN
HEMISPHERE...INSTEAD OF FROM THE HEMISPHERIC ROI ANALYSIS.
     
  - SINCE THE ETA ANALYSIS DOES NOT EXTEND BEYOND THE NORTH POLE INTO EUROPE AND
ASIA...THE HIGH RESOLUTION NGM C-GRID WAS MODIFIED TO BE SIMILAR IN SIZE TO THE
ETA COMPUTATIONAL GRID.
     
   USE OF THE ETA ANALYSIS/AVN FORECAST TO INITIALIZE THE NGM WILL HAVE
ADVANTAGES AND DISADVANTAGES WHICH WILL CAUSE IMPROVEMENT OR DEGRADATION OVER
THE CRAY NGM SYSTEM:
     
CURRENT AND FUTURE ADVANTAGES
     
     1) SINCE THE NGM IS INITIALIZED FROM THE ETA ANALYSIS...IT
CAN START ONE HOUR EARLIER ON THE IBM THAN IT DID ON CRAY J-90.
ALTHOUGH THE NGM RUNS SLOWER ON THE IBM THEN IT DID ON THE CRAY
C-90...THE EARLIER START TIME ON THE IBM WILL  COMPENSATE FOR
THIS...AND NGM PRODUCTS FROM THE IBM WILL BE  AVAILABLE AT ABOUT
THE SAME TIME AS BEFORE THE DISABLING OF THE C-90. 
(ABOUT 50 MINUTES SOONER THAN TODAY).
     
     2) ETA ANALYSIS USES MORE DATA TYPES THAN REGIONAL OPTIMUM
INTERPOLATION ANALYSIS...SUCH AS AIRCRAFT TEMPERATURES...WSR-88D 
VAD WINDS...SSM/I OCEANIC WIND SPEEDS...SURFACE WIND OBSERVATIONS 
OVER LAND...AND PRECIPITABLE WATER FROM THE GOES AND SSM/I
SSM/I SOUNDER.
     
     3) THE ETA ANALYSIS WILL CONTINUE TO BE IMPROVED BY
ALGORITHM CHANGES AND BY NEW DATA SOURCES (SATELLITE 
RADIANCES...ASSIMILATION OF OBSERVED PRECIPITATION AND 
CLOUD...WSR-88D RADIAL WINDS).
     
     4) CONTINUED IMPROVEMENTS IN THE AVN FORECAST SUITE.
     
     5) THE IBM VERSION OF THE NGM COULD BE RUN WELL INTO
THE FUTURE TO PROVIDE EARLY MOS GUIDANCE AND TO PROVIDE 
EMC WITH A BASELINE FOR THE MEASUREMENT OF MESO ETA SKILL.      
DISADVANTAGES
     
     1) SMALLER INNERMOST GRID WHICH STOPS AT THE NORTH POLE.     
 
     2) OCCASIONAL PROBLEMS WITH ETA ANALYSIS IN PACIFIC WHICH
ADVERSELY IMPACT THE NGM FORECAST ON THE IBM. THIS COULD BE  THE
RESULT OF FEWER OBSERVATIONS BEING AVAILABLE TO THE
ETA ANALYSIS DUE TO THE EARLY (T+70 MINUTES) DATA CUTOFF TIME.    
 
     3) USE OF A 6-H AVN FORECAST INSTEAD OF AN ROI ANALYSIS TO
INITIALIZE ANY PART OF THE NGM GRIDS OUTSIDE OF THE ETA 
COMPUTATIONAL GRID. AT THE EARLY DATA CUTOFF TIME OF THE ETA 
THERE WOULD BE LITTLE IF ANY OBSERVATIONS AVAILABLE FOR AN 
ANALYSIS IN THE EASTERN HEMISPHERE.
     
II. RESULTS
     
   EMC HAS PERFORMED TWO PARALLEL TESTS OF THE IBM VERSION OF THE
NGM: A REAL-TIME TEST WHICH STARTED AT 1200 UTC
16 DECEMBER 1999...AND A WARM SEASON RETROSPECTIVE TEST FOR  JULY
1999. EMC'S QUANTITATIVE SKILL SCORES (FIT TO RAWINSONDE  DATA
AND 24-H QUANTITATIVE PRECIPITATION FORECASTS (QPF) 
SCORES) FOR THESE TESTS CAN BE FOUND AT 
HTTP://SGI62.WWB.NOAA.GOV:8080/NGMSTATS/ . THE TECHNIQUES 
DEVELOPMENT LABORATORY (TDL) RAN THE NGM MOS PACKAGE FROM  THE
PARALLEL NGM FORECASTS; THESE RESULTS CAN BE FOUND  AT
HTTP://WWW.NWS.NOAA.GOV/TDL/SYNOP/NGMCAFTI.HTM .
      
   DURING THE JULY 1999 TEST...THE EMC SCORES AND THE TDL
MOS VERIFICATIONS SHOW SMALL DIFFERENCES IN THE 
QUALITY OF THE PARALLEL NGM WHEN COMPARED TO THE 
OPERATIONAL NGM. QPF SKILL FROM THE PARALLEL NGM WAS 
SLIGHTLY BETTER IN THE EASTERN U.S. AND SLIGHTLY WORSE 
IN THE WESTERN U.S....WHILE THE FIT TO RAWINSONDE DATA 
WAS GENERALLY BETTER FOR ALL VARIABLES.
     
   FOR THE CURRENT COOL SEASON TEST...THERE ARE LARGER
DIFFERENCES IN QUALITY BETWEEN THE OPERATIONAL AND 
PARALLEL NGM...WITH DEGRADATION MORE COMMON AT UPPER LEVELS  THAN
IN THE WARM SEASON TEST. GREATEST DIFFERENCES WERE
SEEN IN WINDS (WORSE ABOVE 700 MB)...TEMPERATURE AND HEIGHTS 
(COMPARABLE OR BETTER BELOW 400 MB BUT WORSE ABOVE DUE TO
A GROWING WARM BIAS) AND SURFACE TEMPERATURE (BETTER AT 
AT 12-H AND 24-H RANGE BUT SLIGHTLY WORSE AT 48-H). QPF
SKILL IS COMPARABLE OR SLIGHTLY BETTER IN THE EASTERN U.S.  BUT
WORSE IN THE WESTERN U.S.
     
   TDL PRODUCED AVERAGE VERIFICATION STATISTICS FROM 700+
SITES IN THE CONUS AND ALASKA FOR BOTH THE OPERATIONAL 
AND PARALLEL NGM. FOR THE TWO NGM RUNS THE ERRORS ARE 
COMPARABLE THROUGH THE 12-36 H PERIOD...WITH SLIGHT 
DEGRADATION (4% FOR THE COOL SEASON TEMPERATURE) FOR 
THE PARALLEL NGM'S 60-H MOS TEMPERATURE FORECAST.
     
   FURTHER DETAILS CAN BE FOUND IN THE NWS TECHNICAL
PROCEDURES BULLETIN #464..."CHANGES TO THE NCEP REGIONAL 
ANALYSIS AND FORECAST SYSTEM (RAFS): INITIAL CONDITIONS FOR  FOR
THE NESTED GRID MODEL" AT
HTTP://SGI62.WWB.NOAA.GOV:8080/NGMTPB/
     
   THE 3/1/2000 PRESENTATION TO THE NWS COMMITTEE ON
ANALYSIS AND FORECAST TECHNIQUES IMPLEMENTATION (CAFTI) 
ON THE NGM CHANGES IS ALSO AVAILABLE ONLINE AT
FTP://FTP.NCEP.NOAA.GOV/PUB/EMC/WD20ER/NGMCAFTI6/INDEX.HTM      
NOTE TO FORECASTERS
     
   USERS SHOULD NOT EXPECT TO SEE AN EXACT MATCH BETWEEN
THE ETA ANALYSIS AND THE NGM 00-H FIELDS DERIVED FROM 
THE ETA ANALYSIS IN ALL SITUATIONS FOR THE FOLLOWING 
REASONS:
     
1) THE NGM IMPLICIT NORMAL MODE INITIALIZATION IS PERFORMED  ON
THE INTERPOLATED ETA ANALYSIS BEFORE THE NGM MODEL 
INTEGRATION.
     
2) VERTICAL RESOLUTION DIFFERENCE : THE OPERATIONAL MESO 
ETA MODEL HAS 45 VERTICAL LEVELS...WHILE THE NGM HAS 16 
LEVELS. CERTAIN FEATURES (SUCH AS NARROW JET STREAKS
OR SHARP VERTICAL MOISTURE GRADIENTS) WHICH ARE RESOLVED 
IN THE ETA ANALYSIS MAY NOT BE CAPTURED WITH THE SAME 
DETAIL WHEN INTERPOLATED TO THE THICKER NGM VERTICAL 
LAYERS.
     
3) MODEL TERRAIN HEIGHT DIFFERENCES : THE 32-KM ETA MODEL 
TERRAIN HEIGHT IS DERIVED FROM HIGH RESOLUTION 30 SECOND 
DATA OVER THE CONUS...WHILE THE NGM USES MUCH SMOOTHER 
TERRAIN BASED ON R40 SPECTRAL RESOLUTION. THUS...THERE ARE  MANY
REGIONS WITH SIGNIFICANT DIFFERENCES IN MODEL TERRAIN  HEIGHT.
DURING THE ETA-TO-NGM INTERPOLATION...THE FIRST STEP  IS TO
RECOMPUTE THE ETA ANALYSIS SURFACE PRESSURE BASED ON  THE NGM
TERRAIN HEIGHT. IF THE NGM TERRAIN HEIGHT IS LESS  THAN THE ETA
TERRAIN HEIGHT...ONE MUST EXTRAPOLATE THE WIND...
TEMPERATURE...AND MOISTURE FROM THE FIRST ATMOSPHERIC ETA 
LAYER TO GET VALUES AT NGM LEVELS BELOW THE ETA MODEL 
TERRAIN.
     
4) FORECASTERS WHO USE THE MESO ETA AND NGM FORECAST HOURLY 
STATION PROFILES PACKED IN BUFR FORMAT SHOULD BE AWARE THAT  THE
STATION DATA IN THE ETA MODEL IS TAKEN FROM THE MODEL  GRID POINT
CLOSEST TO THE STATION LOCATION...WHILE THE NGM  PERFORMS A
BILINEAR INTERPOLATION FROM THE FOUR GRID POINTS  CLOSEST TO THE
STATION.  THEREFORE...THE 00-H ETA AND NGM PROFILES MAY NOT
ALWAYS AGREE EVEN FOR STATIONS CLOSE TO SEA  LEVEL...ESPECIALLY
IN REGIONS WITH STRONG GRADIENTS.
 
 
END




pFad - Phonifier reborn

Pfad - The Proxy pFad of © 2024 Garber Painting. All rights reserved.

Note: This service is not intended for secure transactions such as banking, social media, email, or purchasing. Use at your own risk. We assume no liability whatsoever for broken pages.


Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy