City Construction Projects

Complete Streets Approach

The City of Cambridge is committed to improving the roadways, sidewalk and utilities to make them safe for all users. The construction season in Cambridge runs from mid-April through November, weather permitting. Work may be done outside of the official construction season if it doesn’t interfere with snow removal. To learn more about how City streets are prioritized for reconstruction, please visit the 5 Year Sidewalk and Street Reconstruction Plan

  • City Construction Projects- For detailed information about City construction projects, see below. You can filter for projects In Planning, In Construction or Completed. These construction projects may also be viewed as a map. You can sign up to receive email updates for any of the projects by going to the “Contact” tab of the project page.
  • University Construction Projects- Harvard University Construction information can be found here, MIT Construction Information can be found here
  • Utility Construction and Private Development Projects- For all other construction updates, including work being done by the Cambridge Water Department, Cambridge Electric Department, Eversource, other utility companies and large private development projects, click here.

Filter  
Close  
Displaying 1-10 of 139 results
Project Name & Description Description Type Status
River Street Reconstruction Project
Welcome to the River Street Construction Webpage! This is the place to find current information and updates related to construction of the River Street Infrastructure and Streetscape Project. The project includes utility and surface reconstruction of the following streets and public spaces: • River Street from Memorial Drive to Massachusetts Avenue • Carl Barron Plaza (the major public space at the intersection of River Street/Western Ave/Mass Ave in Central Square) • The MBTA bus stops and busway at Magazine/Green/River Street adjacent to Carl Barron Plaza • Pleasant Street and Tubman Square between Pleasant Place and River Street • Green Street between Magazine and Pearl Street • Magazine Street between Franklin and Green Street • Blackstone Street In addition, the project includes the following nearby neighborhood streets which are due for reconstruction under the City's Five Year Sidewalk and Street Reconstruction Plan • Fairmont Avenue / Fairmont Street / Rockwell Street / Laurel Street / Kelly Road
Welcome to the River Street Construction Webpage! This is the place to find current information and updates related to construction of the River Street Infrastructure and Streetscape Project. The project includes utility and surface reconstruction of the following streets and public spaces: • River Street from Memorial Drive to Massachusetts Avenue • Carl Barron Plaza (the major public space at the intersection of River Street/Western Ave/Mass Ave in Central Square) • The MBTA bus stops and busway at Magazine/Green/River Street adjacent to Carl Barron Plaza • Pleasant Street and Tubman Square between Pleasant Place and River Street • Green Street between Magazine and Pearl Street • Magazine Street between Franklin and Green Street • Blackstone Street In addition, the project includes the following nearby neighborhood streets which are due for reconstruction under the City's Five Year Sidewalk and Street Reconstruction Plan • Fairmont Avenue / Fairmont Street / Rockwell Street / Laurel Street / Kelly Road Streets and Sidewalks Current Construction
Danehy Track and Field Construction Project
The track and field, installed in 2012, are at the end of their useful life and need to be replaced. The scope of work will include the replacement of the synthetic turf field and the track, as well as upgrades to the adjoining amenities including team benches, bleachers, and shot put and discus throwing areas. The scope of work will include the replacement of the synthetic turf field and the track, as well as upgrades to the adjoining amenities including team benches, bleachers, and shot put and discus throwing areas.
The track and field, installed in 2012, are at the end of their useful life and need to be replaced. The scope of work will include the replacement of the synthetic turf field and the track, as well as upgrades to the adjoining amenities including team benches, bleachers, and shot put and discus throwing areas. The scope of work will include the replacement of the synthetic turf field and the track, as well as upgrades to the adjoining amenities including team benches, bleachers, and shot put and discus throwing areas. Parks Current Construction
Harvard Square Kiosk and Plaza
The City is reconstruction the historic Out of Town News Kiosk and surrounding plaza.
The City is reconstruction the historic Out of Town News Kiosk and surrounding plaza. Streets and Sidewalks Public Works
Willard Street Drainage Improvement Project
The main goal of the Willard Street Drainage Improvement Project is to address stormwater flooding of the street and abutting properties. The project also provides an opportunity to upgrade other obsolete utilities and provide surface improvements including accessible sidewalks and traffic calming.
The main goal of the Willard Street Drainage Improvement Project is to address stormwater flooding of the street and abutting properties. The project also provides an opportunity to upgrade other obsolete utilities and provide surface improvements including accessible sidewalks and traffic calming. Sewer and Stormwater Current Construction
Maple Ave Reconstruction Project
Maple Ave from Broadway to Cambridge St. is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
Maple Ave from Broadway to Cambridge St. is scheduled for reconstruction in 2024 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction. Streets and Sidewalks Current Construction
Chestnut Street Reconstruction Project
Chestnut Street from Sydney St. to Pleasant St. is scheduled for reconstruction in 2023 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction.
Chestnut Street from Sydney St. to Pleasant St. is scheduled for reconstruction in 2023 as part of the City's Five Year Plan for Sidewalk and Street Reconstruction. Streets and Sidewalks Current Construction
Updated Combined Sewer Overflow (CSO) Control Plan
The City of Cambridge, the City of Somerville, and the Massachusetts Water Resources Authority are collaborating on CSO Control plans to protect and improve our water resources.
The City of Cambridge, the City of Somerville, and the Massachusetts Water Resources Authority are collaborating on CSO Control plans to protect and improve our water resources. Sewer and Stormwater Public Works
Webster Avenue
Webster Ave, between Lincoln St. and Hampshire St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan.
Webster Ave, between Lincoln St. and Hampshire St., is scheduled for upcoming street and sidewalk reconstruction as part of the City’s 5 Year Plan. Streets and Sidewalks Current Construction
Elm St Reconstruction Project
Elm St Reconstruction Project
Elm St Reconstruction Project Streets and Sidewalks Current Construction
Dodge Street Reconstruction Project
Dodge St. between Western Ave. and Callendar St. is schedule for reconstruction as part of the Five Year Sidewalk and Street Plan.
Dodge St. between Western Ave. and Callendar St. is schedule for reconstruction as part of the Five Year Sidewalk and Street Plan. Streets and Sidewalks In Planning

Will I be able to get out of my driveway or walk down the street during construction?

If any work is scheduled to be performed directly in front of your driveway, the contractor will notify you directly regarding the accessibility timeline. Pedestrian access will be maintained at all times. if you live on a road that has a bicycle lane, the contractor will try to maintain a bicycle lane around the work zone. If that is not possible, crews will post signage in the area to alert cyclists that the bicycle lane ends and to alert motorists that they should "Share the Road" with cyclists.

How can I receive updates about construction in my neighborhood?

Click on the "Sign Up" button on the Contact tab of the project page or go to cambridgema.gov/subscribe to search for mailing lists. 

Page was last modified on 3/4/2024 6:56 PM
Contact Us

How can we help?

Please provide as much detail below as possible so City staff can respond to your inquiry:

As a governmental entity, the Massachusetts Public Records Law applies to records made or received by the City. Any information received through use of this site is subject to the same provisions as information provided on paper.

Read our complete privacy statement


Service Requests

Enter a service request via SeeClickFix for things like missed trash pickups, potholes, etc.

pFad - Phonifier reborn

Pfad - The Proxy pFad of © 2024 Garber Painting. All rights reserved.

Note: This service is not intended for secure transactions such as banking, social media, email, or purchasing. Use at your own risk. We assume no liability whatsoever for broken pages.


Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy