NCEP Synergy Meeting
Highlights: January 13, 2014
This meeting was led by
Wallace Hogsett (WPC) and attended by Keith Brill (WPC); Becky Cosgrove (NCO);
Vera Gerald, Stephen Barry, Eric Rogers, Geoff DiMego, John Derber, Yuejian
Zhu, Jun Du, and Mary Hart (EMC); Kathy Gilbert (MDL); Andy Dean, Steve Weiss,
and Israel Jirak (SPC); Joe Sienkiewicz (OPC);
Richard Pasch (NHC); David Bright, Ben Schwedler, and
Steve Silberberg (AWC); Jeff Waldstreicher and David Radell (ER); Jeff Craven (CR); Bill Ward (PR); Andy Edman (WR); Bernard Meisner (SR);
John Kelley (NOS); Becky Baltes
1.
NOTES
FROM NCO (Becky Cosgrove)
- In December, global
RTOFS model was implemented and is now on SBN.
- The RTMA and RAP
30-day parallels have ended, and NCO is expecting feedback now.
- Director’s briefing
for the RTMA is scheduled for January 27th. RTMA implementation is
scheduled for January 28th, but may be delayed.
- Although RAP 30-day
has ended, NCO will run a 30-day stability test to ensure no more model
failures. RAP implementation will occur February 25th.
- RAP will not include
ceiling height data (see TIN), because something is wrong with the data.
- NCO requests that all
users focus evaluation efforts on the SREF now, which restarted this week. The
SREF implementation, including dataflow to NOAAPORT, will occur on Wednesday,
February 26th. SREF fields on SBN include accumulated total precip
and 2-m temperatures. It is on 32-km Lambert grid, with 3-hourly data to 87
hours.
- Next implementation is
the NAEFS, which is tentatively scheduled for March 18th, with the evaluation
starting in 2-3 weeks.
2.
NOTES
FROM EMC
2a.
Global Climate and Weather Modeling Branch (GCWMB) (John Derber)
- The 13km GFS is on
track for Q4, and the GEFS will come in Q1 2015 at
35km resolution.
2b.
Mesoscale Modeling Branch (MMB) (Geoff DiMego)
- The high-res windows
are on schedule, with the ARW going to 3.4km, and the NMMB replacing the NMM.
NMMB will be initialized from the RAP, adding compared to the NAM nest.
- Preemption during
hurricane season after the upgrade will have to be discussed further, as the
higher resolution after the upgrade will leave less room on supercomputer.
- The NAM upgrade is
looking good; scheduled for Q3. Upgrades include better details for severe
storms, assimilation (including radar assimilation via the RAP methodology).
- Next quarter is the
HRRR. HRRR code has been handed off from GSD to EMC, but it will be a number of
weeks before it’s ready for NCO.
- RTMA/URMA is a big
player in the Sandy Blender Project, but it won’t be perfect.
2c.
Marine Modeling and Analysis Branch (MMAB) (Vera Gerald)
No report.
3.
NATIONAL
OCEAN SERVICE (NOS, Aijun Zhang):
Waiting on official parallel testing for SF Bay. NCO is now ready for code fix, and the
evaluation should begin soon.
4.
FEEDBACK
FROM MDL/OPERATIONAL CENTERS/REGIONS
4a. MDL (Kathy Gilbert):
MDL has three upcoming
implementations:
- Probabilistic storm
surge (contact Arthur Taylor) will hopefully go in before this season
- Convection/LAMP TIN is
out for March 11 implementation.
- New GMOS grids,
including probabilistic winter ptype and predominant
weather. DRG action to get these routed to SBN.
MDL needs retro runs for
the NAM. EMC is running it on Zeus and hopes to have a month or more, but they
need to know which month to run (probably warm season). GFS retro runs will
start at the end of this month.
4b. NCEP Centers and NWS
Regions
Weather Prediction
Center (WPC, Wallace Hogsett): No report.
Storm Prediction Center
(SPC, Israel Jirak): No report.
National Hurricane
Center (NHC, Richard Pasch):
NHC needs to discuss retro cases with EMC, because the 2012-13 seasons were not
good. May need to go back earlier. EMC is planning on
running 2011-13.
Space Weather Prediction
Center (SWPC, no representative):
Ocean Prediction Center
(OPC, Joe Sienkiewicz): No report.
Aviation Weather Center
(AWC, Steve Silberberg): No report.
Pacific Region (PR, Bill Ward): Need to catch up with
NCO on getting HWRF on SBN, and some issues with
Monterrey.
Alaska Region (AR, no representative): No report.
Eastern Region (ER, Jeff Waldstreicher):
Nothing to report.
Western Region (WR, Andy Edman):
Southern Region (SR, Bernard Meisner): No report
Central Region (CR, Jeff Craven):
5.
NESDIS (no representative):
The next Synergy Meeting will be held at 2:30 pm EST on Monday, February 24 2014 in NCWCP conference room 2890, with remote teleconferencing capability.