Content-Length: 366966 | pFad | http://en.wikipedia.org/wiki/Agara_metro_station

Agara metro station - Wikipedia Jump to content

Agara metro station

Coordinates: 12°55′14″N 77°38′37″E / 12.92053°N 77.64359°E / 12.92053; 77.64359
From Wikipedia, the free encyclopedia

Agara
Namma Metro station
Under Construction of this metro station as of April 2024 under Phase 2A of Blue Line of Namma Metro
General information
LocationAH45, Agara Village, 1st Sector, HSR Layout, Bengaluru, Karnataka 560034
Coordinates12°55′14″N 77°38′37″E / 12.92053°N 77.64359°E / 12.92053; 77.64359
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Blue Line
Red Line (Proposed)
PlatformsSide platform (TBC)
Platform-1Central Silk Board
Platform-2Krishnarajapura / KIAL Terminals
Side platform (TBC)
Platform-3Hebbala
Platform-4Sarjapura
Platform Numbers (TBC)
Tracks2 (TBC)
ConnectionsBus interchange Agara BMTC Bus Terminus
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
Status  Under Construction
  Proposed
Station codeAGRA (TBC)
History
Opening  June 2026; 17 months' time (June 2026) (TBC)
  2030; 6 years' time (2030) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
HSR Layout Blue Line
(Future Service)
Ibbaluru
Jakkasandra
towards Hebbala
Red Line
(Proposed)
Ibbaluru
towards Sarjapura
Location
Map

Agara is an upcoming elevated metro station on the North-South corridor of the Blue Line[1] and proposed Red Line of Namma Metro in Bangalore, India. Around this metro station holds the main Agara, a major suburban area which was operated by the Madras Engineer Groups and was one of the biggest army cantonments during the British Times. This metro station is adjacent to its neighbouring localities like HSR Layout, Koramangala, Outer Ring Road and Varthur. This metro station (under Blue Line) is slated to become operational around June 2026.[2][3][4][5]

History

[edit]

Blue Line

[edit]

In December 2019, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Agara metro station, part of the 9.859 km Reach 2A – Package 1 section (Central Silk Board - Kodibeesanahalli) of the 18.236 km Blue Line of Namma Metro. On 13 October 2020, Afcons Infrastructure was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [6] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.

Station layout

[edit]

Blue Line Station Layout - To Be Confirmed

Agara track layout (TBC)
P#
P#
Station with two tracks and two side platforms
** Proposed & * Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Northbound
Towards → Krishnarajapura / KIAL Terminals
Next Station: Ibbalur
Change at the next station for Red Line
Platform #
Southbound
Towards ← Central Silk Board
Next Station: HSR Layout
Side platform | Doors will open on the left Disabled access
L2

Red Line Station Layout - To Be Confirmed

Agara track layout (TBC)
P#
P#
Station with two tracks and two side platforms
* Proposed & ** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Northbound
Towards → Hebbala
Next Station: Jakkasandra
Platform #
Southbound
Towards ← Sarjapura
Next Station: Ibbaluru
Change at the next station for Blue Line
Side platform | Doors will open on the left Disabled access
L2

Connections

[edit]

Entry/Exit

[edit]

See also

[edit]

References

[edit]
  1. ^ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. ^ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. ^ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. ^ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Retrieved 14 December 2023.
  6. ^ "Afcons & Shankaranarayana Win Bangalore Metro Phase 2A ORR Work". The Metro Rail Guy. 13 October 2020. Retrieved 24 October 2024.
[edit]








ApplySandwichStrip

pFad - (p)hone/(F)rame/(a)nonymizer/(d)eclutterfier!      Saves Data!


--- a PPN by Garber Painting Akron. With Image Size Reduction included!

Fetched URL: http://en.wikipedia.org/wiki/Agara_metro_station

Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy