Content-Length: 473277 | pFad | http://en.wikipedia.org/wiki/Damansara_Link

Sprint Expressway - Wikipedia Jump to content

Sprint Expressway

From Wikipedia, the free encyclopedia
(Redirected from Damansara Link)

Expressway 23 shield}}
Expressway 23
SPRINT Expressway
(System of Traffic Dispersal in Western Kuala Lumpur)
Lebuhraya Sprint, Kuala Lumpur 20240501 162047.jpg
Route information
Maintained by Sistem Penyuraian Trafik KL Barat Sdn Bhd (Sprint)
Length26.5 km (16.5 mi)
Kerinchi Link: 11.5 km (7.1 mi)
Damansara Link: 9.5 km (5.9 mi)
Penchala Link: 5.5 km (3.4 mi)
Existed1999–present
HistoryCompleted in 2004
Component
highways
Sprint Expressway Kerinchi Link
(Kg. Kerinchi–Mont Kiara)
Sprint Expressway Penchala Link
(Jalan Duta–Sungai Penchala)
Sprint Expressway Damansara Link
(Semantan–Damansara Interchange)
Major junctions
Major intersections North–South Expressway Northern Route AH2 AH141 New Klang Valley Expressway
Damansara–Shah Alam Elevated Expressway Damansara–Shah Alam Elevated Expressway
Damansara–Puchong Expressway Damansara–Puchong Expressway
FT 2 Federal Highway
Jalan Tuanku Abdul Halim (Jalan Duta)
Location
CountryMalaysia
Primary
destinations
Damansara Utama, Damansara City, Petaling Jaya, Taman Tun Dr Ismail, Mont Kiara, Pusat Sains Negara, Sri Hartamas, Bangsar, Kuala Lumpur, Kerinchi, Jalan Duta
Highway system

SPRINT Expressway Sprint Expressway(Malay: Sistem Penyuraian Trafik Kuala Lumpur Barat, English: System of Traffic Dispersal in Western Kuala Lumpur) is the main expressway network in Klang Valley, Malaysia. The 26.5 km (16.5 mi) expressway is divided into three sections: the Kerinchi Link, Damansara Link and Penchala Link. It is a three-lane dual carriageway that was built to disperse traffic from congested inner city roads and narrow residential streets leading into Kuala Lumpur from the western suburbs, including Petaling Jaya, Damansara, and surrounding areas. It is one of the busiest expressway during rush hour to and from the city centre.

Route background

[edit]
[edit]

The 11.5 km (7.1 mi) sections from Seputeh Interchange at Federal Highway to NKVE at Jalan Duta. The Kilometre Zero of the Kerinchi Link's section is located at Mont Kiara-NKVE Interchange.

[edit]

The 9.5 km (5.9 mi) sections from Kayu Ara to Jalan Duta-Semantan Interchange. The Kilometre Zero of the Damansara Link's section is located at Kampung Kayu Ara in Petaling Jaya, Selangor.

[edit]

The 5.5 km (3.4 mi) sections from Damansara–Puchong Expressway at Penchala, Penchala Tunnel to Mont Kiara. The Kilometre Zero of the Penchala Link's section is located at Mont Kiara Interchange

History

[edit]

The proposal to build the expressway was motivated by heavy traffic on Jalan Damansara. The concession for the expressway was awarded to Sistem Penyuraian Trafik KL Barat Sdn Bhd (SPRINT). On 23 October 1997, the concession agreement was signed between the Government of Malaysia and Sprint for the privatisation of the improvement, upgrading, design, construction, maintenance, operations, and management of the expressway.[citation needed]

A supplementary agreement was subsequently signed on 4 September 1998 to defer the construction of the Penchala Link. The concession period is for 33 years and commenced on the effective date on 15 December 1998. After this period, the toll collection will cease and the highways will be handed over to the government. Construction began in 1999, which included acquiring and upgrading several major roads, such as Jalan Damansara, Jalan Kayu Ara, Jalan Sri Hartamas, and Jalan Semantan. The Kerinchi Link and Damansara Link were opened in 2001, followed by the Penchala Link in 2004.[citation needed]

This expressway also featured its own toll collection system known as the "FasTrak". On 1 July 2004, the FasTrak electronic payment system was replaced by Touch 'n Go and Smart TAG electronic payment systems.[citation needed]

Pioneer roads

[edit]

The construction of the SPRINT Expressway included acquiring and upgrading several major roads:

[edit]
Roads Sections
Jalan Sri Hartamas Sri Hartamas
Jalan Bukit Kiara Sri Hartamas–Bukit Kiara
[edit]
Roads Sections
Jalan Semantan Jalan Duta–Damansara Town Centre
Jalan Beringin South side
Jalan Johar–Semantan
Jalan Johar Jalan Beringin–Jalan Damansara
Jalan Damansara Damansara Town Centre–Damansara
Jalan Kayu Ara Damansara–Kampung Kayu Ara

Features

[edit]
The Damansara Link section of Klang Valley's Sprint Expressway.
A section of the former Damansara Town Centre building as seen from Sprint Expressway's Damansara Link.

The expressway has several notable features:

Controversies and criticisms

[edit]
[edit]

The double-deck carriageway design of Kerinchi Link from Bukit Kiara Interchange Exit 2310 to Kerinchi Interchange Exit 2310 was made as a result of the early controversial issues during the development stage. The construction of the stretch took place at the border of Universiti Malaya, which meant that the construction could take up some of the university area, which sparked complaints. As a result, the expressway concessionaire Sprint came up with the idea of a double-deck carriageway which could reduce the land usage.

Damansara Town Centre as the "island" of separated carriageway

[edit]

During the construction of the expressway, Jalan Semantan could not be widened to six lanes; consequently, the highway concessionaire took another main road at Damansara Town Centre for the Eastbound route, including Jalan Johar and Jalan Beringin. Damansara Town Centre became the "island" of the separated carriageways.

[edit]

Disputed ramp

[edit]

When the expressway was opened to the traffic, the 530 m-long two-lane off-ramp from the Northbound direction of Kerinchi Link to Penchala Link at the Mont Kiara Interchange Exit 2303 could not be opened to traffic as a result of a land owner fencing the land which became a part of the ramp. The land owner's action has created difficulties among the residents of Bukit Kiara and Sri Hartamas, and even the highway concessionaire itself.

Meanwhile, the highway concessionaire has made a narrower temporary ramp to Penchala Link but according to the highway concessionaire, the temporary ramp is quite unsafe due to risks of being collided from behind. For the time being, the highway concessionaire is still negotiating with the land owner in order to open the two-lane ramp.[1]

Opening the ramp

[edit]

At 3pm, 3 June 2010, Works Minister Datuk Shaziman Abu Mansor officially opened this disputed ramp.

Hitherto, road users living in the Mont Kiara and Sri Hartamas areas wanting to go to Jalan Duta, Duta–Ulu Klang Expressway (DUKE) and Penchala Link only had two lanes to use.

"This new ramp will ease the movement of almost 22,000 vehicles per day", he told reporters after opening the ramp.

Shaziman said the 50-metre ramp, which was delayed for seven years owing to problems related to acquisition of land, was completed in five months after the intervention by the Malaysian Prime Minister, Datuk Seri Najib Tun Razak, who had immediately approved about RM20 million for the acquisition of land.

The old SJKC Damansara near Sprint Expressway

[edit]

The old SJKC Damansara has one block located at Section 17 near Jalan Damansara (now Sprint Expressway). However, on 26 January 2001, the school was moved from old block at Section 17 to the new smart school at PJU 3, near Tropicana Golf and Country Club following the instructions from federal government that it no longer provided a "conducive learning environment" because of traffic congestion and noise pollution from the neighbouring Sprint Expressway.

Tolls

[edit]

The Sprint Expressway uses open toll systems.

Electronic Toll Collections (ETC)

[edit]

As part of an initiative to facilitate faster transactions at the Kerinchi Link, Damansara Link and Penchala Link Toll Plazas, all toll transactions at three stretches toll plazas on the Sprint Expressway have been conducted electronically via Touch 'n Go cards or SmartTAGs since 2 March 2016.[2][3]

Toll rates

[edit]

(As of 15 October 2015)[4][5][6]

[edit]
Class Type of vehicles Rate (in Malaysian Ringgit (RM))
0 Motorcycles, bicycles or vehicles with 2 or less wheels Free
1 Vehicles with 2 axles and 3 or 4 wheels excluding taxis RM2.50
2 Vehicles with 2 axles and 5 or 6 wheels excluding buses RM7.00
3 Vehicles with 3 or more axles RM10.50
4 Taxis RM1.80
5 Buses RM1.50
[edit]
Class Type of vehicles Rate (in Malaysian Ringgit (RM))
0 Motorcycles, bicycles or vehicles with 2 or less wheels Free
1 Vehicles with 2 axles and 3 or 4 wheels excluding taxis RM2.00
2 Vehicles with 2 axles and 5 or 6 wheels excluding buses RM4.00
3 Vehicles with 3 or more axles RM6.00
4 Taxis RM1.00
5 Buses RM1.00
[edit]
Class Type of vehicles Rate (in Malaysian Ringgit (RM))
0 Motorcycles, bicycles or vehicles with 2 or less wheels Free
1 Vehicles with 2 axles and 3 or 4 wheels excluding taxis RM3.00
2 Vehicles with 2 axles and 5 or 6 wheels excluding buses RM6.00
3 Vehicles with 3 or more axles RM9.00
4 Taxis RM1.50
5 Buses RM2.00

List of interchanges

[edit]
[edit]
km Exit Interchange To Remarks
Sprint Expressway
0
2301 Jalan Duta Interchange North–South Expressway Northern Route AH141 New Klang Valley Expressway

West
North–South Expressway Northern Route AH2 Ipoh
North–South Expressway Northern Route AH141 Klang
North–South Expressway Central Link AH2 Kuala Lumpur International Airport (KLIA)
North–South Expressway Southern Route AH2 Johor Bahru
Duta–Ulu Klang Expressway AH141 Duta–Ulu Klang Expressway
FT 54 Kepong
FT 28 Batu Caves
East Coast Expressway FT 2 AH141 Kuantan
East Coast Expressway FT 2 AH141 Genting Highlands
FT 28 Ampang
FT 28 Ulu Klang

East
Jalan Tuanku Abdul Halim (Jalan Duta)
Jalan Duta
City Centre
Segambut
Directional T expressway interchange
North–South Expressway Northern Route New Klang Valley Expressway
PLUS Expressway border limit
Sprint Expressway Sprint Expressway
Kerinchi Link
(Touch 'n Go,
MyRFID and SmartTAG ETC only)
Sprint border limit
2302 Mont Kiara Interchange West
Sprint Expressway Penchala Link
Penchala Tunnel
Sprint Expressway Taman Tun Dr. Ismail
Sprint Expressway Mutiara Damansara
Damansara–Puchong Expressway Damansara
Damansara–Puchong Expressway Puchong
FT 29 Putrajaya
FT 29 Cyberjaya
FT 217 Sungai Besi
Stacked interchange
Jalan Sri Hartamas 22 Exit West
Jalan Sri Hartamas 22
Desa Sri Hartamas
Mont Kiara bound
2303 Sri Hartamas Interchange Jalan 19/70A

Northwest
Desa Sri Hartamas
Mont Kiara
Segambut

East
Sri Hartamas
Jalan Duta
Plaza Damas
Diamond interchange
Sprint Expressway
3
Jalan 48/70 Exit Northwest
Jalan 48/70
Kiara View
Mont Kiara bound
3.9 2305 Pusat Sains Negara Interchange West
Bukit Kiara Equestrian & Country Resort

East
Persiaran Bukit Kiara
Pusat Sains Negara
(National Science Centre)
Bukit Damansara
Diamond interchange
Sprint Expressway
4
Securities Commission Malaysia Securities Commission Malaysia Kerinchi bound
Selangor Club Selangor Club Mont Kiara bound
2306 INTAN Interchange West
Jalan Bukit Kiara 1
Kuala Lumpur Golf & Country Club
Sime Darby Convention Centre

East
Institut Tadbiran Awam Negara (INTAN)
(National Institute of Public Administration)
Main Gate
Diamond interchange
Jalan Bukit Kiara Exit Northwest
Jalan Bukit Kiara 1
Bukit Kiara
Bukit Kiara Sports Complex
Kuala Lumpur Golf & Country Club
Mont Kiara bound
2307 Bukit Kiara Interchange West
Slip Roads to Jalan Dato' Abu Bakar
Section—until --
Section 17 commercial centre
Section 17


Sprint Expressway Damansara Link

West
Sprint Expressway Damansara
Sprint Expressway Taman Tun Dr. Ismail
North–South Expressway Northern Route AH2 New Klang Valley Expressway
North–South Expressway Northern Route AH2 Ipoh
North–South Expressway Northern Route AH141 Klang
North–South Expressway Central Link AH2 Kuala Lumpur International Airport (KLIA)
North–South Expressway Central Link AH2 Johor Bahru

East
Sprint Expressway Bangsar
Sprint Expressway Damansara Town Centre
City Centre
Putra World Trade Centre (PWTC)
Stacked interchange
Double deck carriageway Start/End of double deck carriageway
Double deck carriageway

Upper double deck carriageway (Kerinchi-Federal Highway-bound)
Kerinchi Link toll plaza
KCL
SmartTAG BET
MyRFID Touch 'n Go TnG POS
Opened toll systems
Pay toll
(Accepts electronic toll payment (Touch 'n Go,
MyRFID and SmartTAG) only)
Double deck carriageway

Below double deck carriageway (Mont Kiara-NKVE-bound)
Kerinchi Link toll plaza
KCL
TnG POS
MyRFID Touch 'n Go SmartTAG BET
Opened toll systems
Pay toll
(Accepts electronic toll payment (Touch 'n Go,
MyRFID and SmartTAG) only)
Double deck carriageway
Kerinchi Link toll plaza
KCL
Northbound
Double deck carriageway Start/End of double deck carriageway
Sprint Expressway Sprint Expressway
Kerinchi Link
(Touch 'n Go,
MyRFID and SmartTAG ETC only)
FT 2 Federal Highway
2308 Kerinchi Interchange West
FT 2 Federal Highway - Petaling Jaya, Subang Jaya, Sultan Abdul Aziz Shah Airport , Shah Alam, Klang
South
KL Gateway-Universiti LRT station 5

Northeast

Setiawangsa–Pantai Expressway Setiawangsa–Pantai ExpresswaySetiawangsa, Bandar Malaysia, Wangsa Maju, Kuantan

Directional T expressway interchange
Diamond interchange

Stacked interchange

[edit]
km Exit Interchange To Remarks Pictures
Jalan Duta-Semantan Interchange Jalan Tuanku Abdul Halim (Jalan Duta)

North
North–South Expressway Northern Route AH2 Ipoh
East Coast Expressway FT 2 AH141 Kuantan
Segambut

South
City Centre
North–South Expressway Southern Route AH2 Seremban
Malaysian Houses of Parliament
Putra World Trade Centre (PWTC)
Trumpovet interchange
Wisma ELM HELP University (ELM Business School) From Damansara only
Jalan Semanatan
DBKL border limit
Sprint Expressway Sprint Expressway
Damansara Link
(Touch 'n Go,
MyRFID and SmartTAG ETC only)
Start/End of expressway
Sprint border limit
8
Wisma Damansara Wisma Damansara From Damansara only
Changkat Semanatan Underpass Exit North
Changkat Semanatan
Istana Negara (Gate 2)
Suruhanjaya Koperasi Malaysia Headquarters
Wisma Chase Perdana
Trumpovet interchange
Jalan Dungun Exit North
Jalan Dungun
Wisma UN (United Nations Headquarters in Malaysia)
Wisma I&P

HELP University

Junctions from Damansara only
Jalan Damansara Endah Exit South
Jalan Damansara Endah
ECM Libra Building
Junctions from Jalan Duta only
Semantan MRT station Semantan MRT station
9
Start/End of separated carriageway
2315A Semantan Interchange Northwest
Jalan Dungun
Jalan Beringin
U-turn to Kuala Lumpur
Interchange
2315C Interchange East
Jalan Damansara
Galeria Sri Perdana

West
Medan Damansara
Bukit Damansara
Jalan Johar
Bangsar
Trumpovet interchange from Jalan Duta only
2315D Interchange West
Bangsar
Jalan Maarof
Taman Duta
HELP Residency
Trumpovet interchange from Jalan Duta only
Damansara City Exit West
Damansara City
Off ramp from Damansara only
2314B Interchange Jalan Damanlela Off ramp from Damansara only
2314A Bukit Damansara Interchange North
Jalan Beringin
Jalan Johar
Bukit Damansara
Damansara Town Centre
Damansara City

U-turn to Petaling Jaya

Interchange from Damansara only
Jalan Johar Exit East
Jalan Johar
Junctions from Jalan Duta only
P&R Pusat Bandar Damansara MRT station P&R Pusat Bandar Damansara MRT station
9
Jalan Kasah Exit West
Jalan Kasah

Petron

Junctions from Damansara only
Start/End of separated carriageway
2314 Maarof Interchange East
Jalan Maarof
Bangsar
KL Sentral
Mid Valley City
Interchange
7
Jalan Medang Tanduk Exit East
Jalan Medang Tanduk
Bukit Bandaraya
Junctions from Jalan Duta only
Jalan Setiapuspa Exit West
Jalan Setiapuspa
Taman Bukit Damansara
Junctions from Damansara only
Jalan Gegambir Exit East
Jalan Gegambir
Universiti Malaya
Junctions from Jalan Duta only
2307 Bukit Kiara Interchange West
Slip Roads (Jalan 16/11) to Jalan Dato' Abu Bakar
Section—until --
Section 16 commercial centre
Section 16
Section 17

Sprint Expressway Kerinchi Link

North
North–South Expressway Northern Route AH2 Ipoh
North–South Expressway Northern Route Segambut
Sprint Expressway Mont Kiara
Sprint Expressway Sri Hartamas

South
Sprint Expressway Kerinchi
FT 2 Federal Highway
North–South Expressway Southern Route AH2 Seremban
East–West Link Expressway Cheras
FT 2 Petaling Jaya
Stacked interchange
Sprint Expressway
4
2313 Section 16 Interchange North
Kelab Golf Perkhidmatan Awam (KGPA)


West
Section 17 Slip Roads (Jalan 16/11)
Section 16 commercial centre

Section 16
Section 17



South
Jalan Dato' Abu Bakar
Jalan Universiti
Jalan Kemajuan
Universiti Malaya
Petaling Jaya
Diamond interchange
Elevated U-Turn East
Kuala Lumpur
Damansara Town Centre
Damansara City
From Section 17 slip roads (Jalan 16/11) to Kuala Lumpur via Damansara Link
TTDI Bound Exit Northwest
TTDI Bound
T Damansara Link= Toll Plaza (Plaza A)
Jalan Damansara
Taman Tun Dr. Ismail
Damansara–Puchong Expressway Damansara–Puchong Expressway
Damansara–Puchong Expressway Bandar Utama
Damansara–Puchong Expressway Mutiara Damansara
FT 54 Sungai Buloh
FT 54 Kepong
Phileo Damansara MRT station Phileo Damansara MRT station
9
Petronas Layby Petronas Dunkin' Donuts
Petronas petrol station with Dunkin' Donuts drive thru
Jalan Duta bound
Damansara Link toll plaza (PLAZA A = TTDI bound)
DRL
MyRFID SmartTAG Touch 'n Go TnG POS
Opened toll systems
Pay toll
(Accepts electronic toll payment (Touch 'n Go,
MyRFID and SmartTAG) only)
Jalan 17/1 Exit South
Jalan 17/1
Section 17
International Islamic University Malaysia (IIUM) (Petaling Jaya Campus)
Junctions on the Eastin Hotel one way
Damansara Link toll plaza (Plaza B = NKVE bound)
DRL
MyRFID SmartTAG Touch 'n Go TnG POS
Opened toll systems
Pay toll
(Accepts electronic toll payment (Touch 'n Go,
MyRFID and SmartTAG) only)
3 Damansara Link toll plaza
DRL
TnG TAG
Customer Service Centre
Sprint operation office
TTDI bound only
2312 TTDI South Interchange Northwest
Jalan Damansara
Taman Tun Dr. Ismail
Damansara–Puchong Expressway Damansara–Puchong Expressway
Damansara–Puchong Expressway Bandar Utama
Damansara–Puchong Expressway Mutiara Damansara
FT 54 Sungai Buloh
FT 54 Kepong
Interchange with ramp to Jalan Damansara
2311 Section 17 Interchange South
Jalan 17/21
Section 17
Interchange
Bukit Kiara Muslim Cemetery Bukit Kiara Muslim Cemetery
Eastbound
For Muslims only
Sungai Penchala bridge
SS 20 Exit North
Jalan Damansara
SS 20
Tropicana City Mall
Eastbound
Federal Territory of Kuala Lumpur
FT Kuala Lumpur–Selangor border
Selangor Darul Ehsan
Petaling district border
Tropicana City Mall Tropicana City Mall
Parking ramp interchanges
1 2310 Damansara Utama Interchange Damansara–Puchong Expressway Damansara–Puchong Expressway

North
FT 54 Kepong
FT 54 Sungai Buloh
Damansara–Puchong Expressway Bandar Utama
Damansara–Puchong Expressway Taman Tun Dr. Ismail

South
Damansara–Puchong Expressway Puchong
FT 29 Putrajaya
FT 29 Cyberjaya
FT 217 Sungai Besi
Multi-level stacked diamond interchange
Jalan SS 22/11 Exit South
Jalan SS 22/11
Damansara Jaya
Junctions from Jalan Duta only
0.4 Jalan SS 21/1 Exit North
Jalan SS 21/1
Damansara Utama
Junctions from NKVE only
0.3 Kayu Ara flyover Start/End of flyover
0.2 2309 Kayu Ara flyover
Kayu Ara Interchange
South
Jalan SS 23/23
Damansara Jaya
Atria Shopping Gallery
Half-diamond interchange
0.1 Kayu Ara flyover
Sungai Kayu Ara bridge
Start/End of flyover
Sprint Expressway
0
Kampung Sungai Kayu Ara Kampung Sungai Kayu Ara
Sprint Expressway Sprint Expressway
Damansara Link
(Touch 'n Go,
MyRFID and SmartTAG ETC only)
Sprint border limit
North–South Expressway Northern Route AH2 AH141 New Klang Valley Expressway
(Touch 'n Go,
MyRFID and SmartTAG ETC only)
PLUS Expressway border limit
Restricted Routes
Heavy vehicles (laden and unladen heavy vehicles weighing 10,000 kg or more)
are not allowed to enter the expressway Monday to Friday (except public holidays) 6:30 am to 9:30 am

Shah Alam - Jalan Duta (km 9.3 - km 31)
Damansara toll plaza
DMR
TnG TAG
Customer Service Centre
West bound
Damansara toll plaza
DMR
MyRFID Touch 'n Go TnG POS Touch 'n Go SmartTAG SmartTAG Touch 'n Go TnG POS Touch 'n Go
Closed toll systems
Touch in and Touch out your Touch n go cards and pay a distance toll
Damansara-NKVE Interchange North–South Expressway Northern Route AH2 AH141 New Klang Valley Expressway

North
North–South Expressway Northern Route AH2 Ipoh
North–South Expressway Northern Route AH2 Alor Setar
North–South Expressway Northern Route AH2 George Town
North–South Expressway Northern Route Kuala Lumpur
North–South Expressway Northern Route AH2 Sungai Buloh
North–South Expressway Northern Route AH2 Rawang
East Coast Expressway AH141 Kuantan

South
North–South Expressway Northern Route AH141 Klang
North–South Expressway Northern Route AH141 Shah Alam
North–South Expressway Central Link AH2 Kuala Lumpur International Airport (KLIA)
North–South Expressway Southern Route Sungai Besi
North–South Expressway Southern Route AH2 Seremban
North–South Expressway Southern Route AH2 Melaka
North–South Expressway Southern Route AH2 Johor Bahru
Closed tolled expressway trumpet interchange
[edit]
km Exit Interchange To Remarks Pictures
6.2 2304 Penchala Interchange Northwest 2304A
Jalan PJU 8/1
Damansara Perdana
Desa Temuan
Southwest
Jalan PJU 7/9
Mutiara Damansara
The Curve
IKANO Power Centre-IKEA

Damansara–Puchong Expressway Damansara–Puchong Expressway

North
FT 28 Kepong
FT 54 Sungai Buloh
North–South Expressway Northern Route AH2 Ipoh
Damansara–Puchong Expressway Bandar Sri Damansara

South 2304B
Damansara–Puchong Expressway Petaling Jaya
Damansara–Puchong Expressway Puchong
FT 29 Putrajaya
FT 29 Cyberjaya
FT 217 Sungai Besi
Stacked expressway interchange
2316 DASH Highway Interchange
Damansara–Shah Alam Elevated Expressway
Damansara–Shah Alam Elevated Expressway

Puncak Alam
Puncak Perdana
Subang
Sungai Buloh
Kota Damansara
Stacked expressway interchange
Damansara–Puchong Expressway Damansara–Puchong Expressway
Litrak border limit
Sprint Expressway Sprint Expressway
Penchala Link
(Touch 'n Go,
MyRFID and SmartTAG ETC only)
Sprint border limit
Selangor Darul Ehsan
Petaling district border
FT Kuala Lumpur–Selangor border
Federal Territory of Kuala Lumpur
Sprint Expressway
6
Petronas Layby Petronas Eastbound
TTDI North flyover Start/End of flyover
Sprint Expressway
5
TTDI North flyover
Sungai Penchala bridge
2317 TTDI North flyover
TTDI North Interchange
Jalan Datuk Sulaiman

North
Kampung Sungai Penchala

South
Taman Tun Dr. Ismail
Rasta @ TTDI
Diamond interchange
TTDI North flyover Start/End of flyover
Motorcycle shelter points Eastbound
Motorcycles only
Sprint Expressway
4
Penchala Tunnel
700 metres
Start/End of tunnel
Penchala Tunnel
700 metres
Maximum height 5 m
Penchala Tunnel
700 metres
Start/End of tunnel
Motorcycle shelter points Westbound
Motorcycles only
Petronas Layby Petronas Westbound
Mont Kiara toll plaza
MTK
MyRFID TnG POS Touch 'n Go SmartTAG SmartTAG Touch 'n Go TnG POS TnG POS
Opened toll systems
Pay toll
(Accepts electronic toll payment (Touch 'n Go,
MyRFID and SmartTAG) only)
Mont Kiara toll plaza
MTK
Eastbound
Mont Kiara flyover Start/End of flyover
Mont Kiara flyover
Sprint Expressway Penchala Link
(Touch 'n Go,
MyRFID and SmartTAG ETC only)
Sprint Expressway Kerinchi Link
(Touch 'n Go,
MyRFID and SmartTAG ETC only)
Sprint Expressway
0
2302 Mont Kiara flyover
Mont Kiara Interchange
Sprint Expressway Kerinchi Link

Upper Flyover
North
North–South Expressway Northern Route AH141 New Klang Valley Expressway
North–South Expressway Northern Route AH2 Ipoh
North–South Expressway Northern Route AH141 Klang
North–South Expressway Central Link AH2 Kuala Lumpur International Airport
North–South Expressway Southern Route AH2 Johor Bahru
Jalan Duta
City Centre
Segambut

Duta–Ulu Klang Expressway AH141 Duta–Ulu Klang Expressway
Kepong
Batu Caves
Ampang
Ulu Klang
Sungai Besi–Ulu Klang Elevated Expressway Cheras
East Coast Expressway FT 2 AH141 Kuantan
East Coast Expressway FT 2 AH141 Genting Highlands

Below Flyover
South
Sprint Expressway Mont Kiara
Sprint Expressway Sri Hartamas
Sprint Expressway Bukit Damansara
Sprint Expressway Damansara Town Centre
FT 2 Petaling Jaya
East–West Link Expressway Cheras
North–South Expressway Southern Route AH2 Seremban
Stacked interchange

References

[edit]
  1. ^ Missing link is the cause of Mont Kiara's daily crawl Archived 25 June 2009 at the Wayback Machine The Star, 22 June 2009
  2. ^ Chin, Graham (27 January 2016). "LDP and Sprint tolls to go fully cashless this year".
  3. ^ Lee, Jonathan (26 February 2016). "Cashless toll collection on KESAS, SPRINT, Guthrie, LEKAS and LATAR to begin on March 2, 2016".
  4. ^ "SPRINT Toll Fares". litrakgroup.com.my.
  5. ^ "Information you should know on SPRINT Highway's toll review dated 15th October 2015". litrakgroup.com.my.
  6. ^ Lim, Anthony (13 October 2015). "Sprint Expressway toll rates to go up on October 15 – Kerinchi Link, Penchala Link and Damansara Link".
[edit]








ApplySandwichStrip

pFad - (p)hone/(F)rame/(a)nonymizer/(d)eclutterfier!      Saves Data!


--- a PPN by Garber Painting Akron. With Image Size Reduction included!

Fetched URL: http://en.wikipedia.org/wiki/Damansara_Link

Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy