Content-Length: 232021 | pFad | http://en.wikipedia.org/wiki/Expressway_S10_(Poland)

Expressway S10 (Poland) - Wikipedia Jump to content

Expressway S10 (Poland)

Coordinates: 52°58′22″N 18°42′01″E / 52.972786°N 18.700254°E / 52.972786; 18.700254
From Wikipedia, the free encyclopedia
Expressway S10 shield}}
Expressway S10
Droga ekspresowa S10
Route information
Length56 km (35 mi)
460 km (286 mi) planned
Major junctions
From A 6 near Szczecin
Major intersections
To S 50 near Płock
Location
CountryPoland
RegionsWest Pomeranian Voivodeship, Kuyavian-Pomeranian Voivodeship, Masovian Voivodeship
Major citiesSzczecin, Bydgoszcz, Toruń
Highway system
S 8 S 11

Expressway S10 or express road S10 (in Polish droga ekspresowa S10) is a Polish highway which, when completed, will serve as a direct route between Szczecin and Warsaw. It has been planned to run from the interchange with Motorway A6 on the eastern outskirts of Szczecin, through Bydgoszcz and Toruń, to the interchange with express road S50 near Płock, west of Warsaw. Its planned length is 460 km (290 mi).

As of 2024, only short stretches of S10 serving as bypasses of Bydgoszcz, Toruń and several smaller towns have been built, totalling about 56 km (35 mi). According to the plans, the road from Bydgoszcz to Toruń will be constructed by 2026, from Szczecin to Bydgoszcz – by 2030, and from Toruń to Warsaw – by 2032.[1][2]

Route

[edit]
Section Planned completion Notes
Szczecin (A6) – Stargard (including bypass) 2028 Completed as dual-carriageway road mostly in expressway standard, but two intersections remain at-grade. They are planned to get reconstructed to full expressway standard by 2028.
Stargard – Piła (S11) 2028 Design-build contracts ongoing.
Wałcz bypass completed.
Piła – Bydgoszcz (S5) 2030 Preparatory works.
1st carriageway of Wyrzysk bypass completed.
1st carriageway of Piła bypass completed with at-grade intersections and traffic lights (to be reconstructed during the addition of the 2nd carriageway).
Bydgoszcz – Toruń (A1) 2026 Design-build contracts ongoing.
Bydgoszcz bypass completed.
1st carriageway of Toruń bypass completed.
Toruń – Włocławek 2013 Concurrency with A1
Włocławek (A1) – PłockWarsaw (S50) 2032 Preparatory works.
Until S10 is completed, the primary transit route between Toruń and Warsaw is via motorways A1 and A2.

Exit List

[edit]
CountryVoivodeshipLocationkmmiExitNameDestinationsNotes
PolandWest Pomeranian VoivodeshipSzczecin1Szczecin Kijewo interchange A 6 / E28Gdańsk/Berlin
S 3 / E65Gorzów Wielkopolski/Świnoujście/Solidarity Szczecin–Goleniów Airport
DK 10Szczecin/Lubieszyn
proposed western endpoint of expressway

Kilometrage starting point


cloverleaf interchange


currently signed as DK 10
Kijewo — city limits of Szczecin sectionSzczecin-Płonia/Szczecin Zdunowosection planned
pending environmental decision
transition from national road DK 10Western endpoint of expressway section
Gmina Kobylanka4Kobylanka DW 120Kobylanka/Gryfino/Motaniec
Gmina Stargard5Stargard ZachódStargard/KobylankaIncomplete junction: no entry ramp Kobylanka → Szczecin
Zachód means west
Stargard6Stargard Południe DW 106 — Stargard/PyrzycePołudnie means south
Gmina Stargard7Stargard Wschód DK 20 — StargardWschód means east
transition to national road DK 10Eastern endpoint of expressway section
8KrąpielKrąpielexit planned as part of Stargard — Recz section
Gmina Suchań9Suchań DW 160Suchań/Choszcznoexit planned as part of Stargard — Recz section
Gmina Recz10Recz DW 151Świdwin/Recz/Choszcznoexit planned as part of Stargard — Recz section
Gmina Drawno11ŻołwinoŻołwinoexit planned as part of Recz — Mirosławiec section
Gmina Kalisz Pomorski12CybowoCybowoexit planned as part of Recz — Mirosławiec section
13Kalisz Pomorski DW 175Drawsko Pomorskie/Kalisz Pomorski/Choszcznoexit planned as part of Recz — Mirosławiec section
Gmina Mirosławiec14Łowicz WałeckiŁowicz Wałeckiexit planned as part of Recz — Mirosławiec section
15Mirosławiec DW 177Czaplinek/Mirosławiec/Wieleńexit planned as part of Mirosławiec bypass
16PiecnikPiecnikexit planned as part of Mirosławiec — Wałcz section
Wałcztransition from national road DK 10Western endpoint of expressway section
17Wałcz ZachódWałczIncomplete junction: no exit ramp Bydgoszcz → Wałcz; no entry ramp Wałcz → Bydgoszcz
Zachód means west
18Wałcz Północ DW 163 — Wałcz/Kołobrzeg/Gorzów WielkopolskiPółnoc means north
19Wałcz Wschód DK 22 — Wałcz/Gorzów Wielkopolski/CzłuchówWschód means east
Gmina Wałcz20WitankowoNowa Szwecja/Skrzatusz/Witankowo
transition to national road DK 10Eastern endpoint of expressway section
Greater Poland VoivodeshipGmina Szydłowo21Stara ŁubiankaStara Łubiankaexit planned as part of Wałcz — Piła section
PiłaPiła bypass S 11/Piłaconcurrency with Expressway S11 planned

section planned as part of Expressway S11


pending environmental decision
Piła — Wyrzysk sectionBiałośliwiesection planned
pending environmental decision
Gmina Wyrzysktransition from national road DK 10Western endpoint of expressway section
27Wyrzysk Zachód DW 242Więcbork/Gołańcz/WyrzyskZachód means west
28Wyrzysk WschódWyrzyskWschód means east
transition to national road DK 10Eastern endpoint of expressway section
Kuyavian-Pomeranian VoivodeshipWyrzysk — Bydgoszcz sectionNakło nad Noteciąsection planned
pending environmental decision
Gmina Sicienkotransition from national road DK 10Western endpoint of expressway section
34Bydgoszcz Zachód interchange S 5 / E261 — Gdańsk
DK 25Koszalin
DK 80Bydgoszcz
Western End of concurrency with Expressway S5

Western End of concurrency with national road 25


modified cloverleaf interchange


Zachód means west
Gmina Białe Błota13Bydgoszcz MiedzyńBydgoszcz—Miedzyń/NakłoExit number part of Expressway S5
35Bydgoszcz Błonie interchange S 5 / E261Poznań
DW 223 — Bydgoszcz-Centrum
Eastern End of concurrency with Expressway S5

cloverleaf interchange


Centrum means center
36Bydgoszcz Południe DK 25Konin
Bydgoszcz Ignacy Jan Paderewski Airport
Eastern End of concurrency with national road 25
Południe means south
transition to national road DK 10Eastern endpoint of expressway section
Bydgoszcz37Bydgoszcz EmilianowoBydgoszcz-Emilianowoexit under construction as part of Bydgoszcz Południe — Bydgoszcz Emilianowo section
Gmina Solec Kujawski38Bydgoszcz Makowiska DW 397 — Bydgoszcz/Solec Kujawskiexit under construction as part of Bydgoszcz Emilianowo — Solec section
39Solec DW 249 — Solec Kujawskiexit under construction as part of Solec — Toruń Zachód section
Gmina Wielka Nieszawkatransition from national road DK 10Western endpoint of expressway section
40Toruń Zachód DK 15Toruń/Olsztyn/PoznańWestern endpoint of expressway section
Zachód means west
Toruń41Toruń PodgórzToruń Podgórzexit planned
Gmina Wielka Nieszawka42Toruń Czerniewice DK 91 — Toruń/Włocławekexit planned
43Toruń Południe interchange A 1 / E75ŁódźWestern End of concurrency with A1 autostrada

trumpet interchange


Południe means south
Vistula RiverBridge over the Vistula River
Gmina LubiczPPO Nowa WieśWestern terminus of toll section
PPO means toll station
44Lubicz interchange A 1 / E75 — Gdańsk
DK 80 — Toruń
Eastern End of concurrency with A1 autostrada

Eastern terminus of toll section


interchange equipped with toll station


double trumpet interchange
transition to national road DK 10Eastern endpoint of expressway section
Toruń — Border with Masovian Voivodeship sectionWłocławeksection in early planning stage
Masovian VoivodeshipBorder with Masovian Voivodeship — greater Warsaw bypass sectionPłocksection in early planning stage
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

[edit]

References

[edit]
  1. ^ "Rządowy Program Budowy Dróg Krajowych do 2030 r. (Z perspektywą do 2033 r.) - Ministerstwo Infrastruktury - Portal Gov.pl".
  2. ^ "Portal Gov.pl".

52°58′22″N 18°42′01″E / 52.972786°N 18.700254°E / 52.972786; 18.700254










ApplySandwichStrip

pFad - (p)hone/(F)rame/(a)nonymizer/(d)eclutterfier!      Saves Data!


--- a PPN by Garber Painting Akron. With Image Size Reduction included!

Fetched URL: http://en.wikipedia.org/wiki/Expressway_S10_(Poland)

Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy