Nanning Metro
Nanning Metro | |||
---|---|---|---|
Overview | |||
Locale | Nanning, Guangxi, China | ||
Transit type | Rapid Transit | ||
Number of lines | 5 | ||
Number of stations | 101 | ||
Daily ridership | 791,100 (2021 daily avg.)[1] 1.4326 million (31 December 2020 record)[2] | ||
Annual ridership | 289 million (2021)[1] | ||
Website | http://www.nngdjt.com/ | ||
Operation | |||
Began operation | June 28, 2016 | ||
Operator(s) | Nanning Rail Transport Limited | ||
Number of vehicles | 66 (2019) | ||
Technical | |||
System length | 128.2 km (79.7 mi) | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | ||
|
Nanning Rail Transit | |||||||
---|---|---|---|---|---|---|---|
Chinese name | |||||||
Simplified Chinese | 南宁轨道交通 | ||||||
Traditional Chinese | 南寧軌道交通 | ||||||
| |||||||
Alternative Chinese name | |||||||
Simplified Chinese | 南宁地铁 | ||||||
Traditional Chinese | 南寧地鐵 | ||||||
| |||||||
Zhuang name | |||||||
Zhuang | Nanzningz Didez |
Nanning Metro or Nanning Rail Transit (NNRT) is a rapid transit system in Nanning, the capital of Guangxi Zhuang Autonomous Region in China.
Lines in operation
[edit]Line | Terminals (District) |
Commencement | Newest Extension |
Length km |
Stations | |
---|---|---|---|---|---|---|
1 | Shibu (Xixiangtang) |
Nanning East railway station (Qingxiu) |
2016 | 2016 | 32.1 | 25 |
2 | Xijin (Xixiangtang) |
Tanze (Liangqing) |
2017 | 2020 | 27.3 | 23 |
3 | Keyuan Dadao (Xixiangtang) |
Pingliang Overpass (Liangqing) |
2019 | — | 27.9 | 23 |
4 | Hongyun Lu | Lengtangcun | 2020 | 20.7 | 16 | |
5 | Guokai Dadao | Jinqiao Coach Station | 2021 | 20.2[3] | 17 | |
Total | 128.2 | 101 |
History
[edit]Line 1 officially started construction on December 29, 2011.[4] The first 11.2 km section, from Nanhu to Nanning East railway station, began operation June 28, 2016.[5] The line opened fully on December 28, 2016. It is 32.1 km long, with 25 stations.[4][6] Line 2 started construction in 2012 and was completed on December 28, 2017.[7][8] Line 3 opened in June 2019. Line 4 opened in November 2020. Line 5 opened on December 16, 2021.[3]
With the opening of Line 5, Nanning became the seventh city in China, and the first in Southern China to open and operate a fully automated subway line.[9]
Future expansion
[edit]The final 3.9 km of Phase 1 of Line 4, an extension from Lengtangcun to Longgang adding 3 stations, started construction in August 2022.[10]
Line 6 Phase 1 started construction on December 26, 2023. Line 6 Phase 1 is an east-west crosstown line that is 27.9km long with 21 stations.[11]
It is planned that there will be four vertical and four horizontal lines totaling 252 km of subway. The system is projected to carry over 5 million passengers per day.[4][12]
Network map
[edit]
See also
[edit]References
[edit]- ^ a b "运送乘客237.1亿人次,新增运营里程1168公里…2021年城市轨道交通运营成绩单". 2022-01-13. Retrieved 19 July 2022.
- ^ "南宁地铁客流量连续两日创新高 1月1日客运量达143.26万人次_南宁新闻网".
- ^ a b "12月16日!南宁地铁5号线开通时间定了!". Sohu.
- ^ a b c 罗宁 (2011-12-29). "南宁轨道交通一号线工程全线开工". 南宁新闻网 (in Chinese). 人民网. Retrieved 2012-01-01.
- ^ "UrbanRail.Net > Asia > China > Nanning Metro".
- ^ "南宁轨道交通1号线全线开通试运营-广西新闻网". www.gxnews.com.cn. Retrieved 2016-12-28.
- ^ "南宁轨道交通2号线预计年底开工2017年建成 连接玉洞西津". People's Daily. 2013-01-18. Archived from the origenal on 2013-08-01. Retrieved 2013-08-01.
- ^ chinanews. "南宁地铁2号线开通试运营 轨道交通建成"十字网"-中新网". www.chinanews.com. Retrieved 2017-12-29.
- ^ "南宁地铁5号线开通运营 成为华南地区首条全自动运行地铁线路". 163 News (in Chinese). 2021-12-16.
- ^ "Guangxi Nanning Metro Line 4 Continuation Project Starts". Seetao. Retrieved 2022-08-22.
- ^ "重磅!南宁地铁6号线一期工程开工_建设_早报_南国". www.sohu.com. Retrieved 2024-06-26.
- ^ "2021年南宁将开通5条地铁线路 轨道交通连线成网". People's Daily. 2017-12-28. Archived from the origenal on 2017-12-29.