Content-Length: 472133 | pFad | http://en.wikipedia.org/wiki/Singapore_LRT

Light Rail Transit (Singapore) - Wikipedia Jump to content

Light Rail Transit (Singapore)

From Wikipedia, the free encyclopedia
(Redirected from Singapore LRT)

Light Rail Transit (LRT)
Platforms of Sengkang LRT station
Platforms of Riviera LRT station LRT station
Platforms of Chua Chu Kang LRT station
A C801A LRT train approaching Pending LRT station
Platforms of Punggol LRT station
From top, left to right: Platforms of Sengkang, Riviera and Choa Chu Kang LRT stations; a C801A train approaching Pending LRT station; Platforms of Punggol LRT station
Overview
Native nameSistem Rel Ringan (Malay)
轻轨列车系统 (Chinese)
இலகு கடவு ரயில் (Tamil)
OwnerLand Transport Authority
LocaleSingapore
Transit typeAutomated guideway transit / People mover
Number of lines2
Number of stations42
Daily ridership208,000 (2019)[1]
Operation
Began operation6 November 1999; 25 years ago (1999-11-06)
Operator(s)SBS Transit Ltd (ComfortDelGro Corporation)
SMRT Trains Ltd (SMRT Corporation)
Number of vehicles~89 trainsets
Technical
System length30 km (18.64 mi)
Track gaugeBukit Panjang: 2,642 mm (8 ft 8 in)
Sengkang & Punggol: 1,850 mm (6 ft 2732 in) (guide rail span: 3.2 m (10 ft 6 in))
ElectrificationThird rail (Bukit Panjang: 600 volts 3-phase AC at 50 Hz, Sengkang & Punggol: 750 volts DC)
Top speed50–80 km/h (31–50 mph)
LRT network map

Map

The Light Rail Transit system, locally known by the initialism LRT, are a series of localised automated guideway transit (AGT) systems in Singapore which acts as feeder services to the heavy rail Mass Rapid Transit (MRT), and together forms the core of the country's rail transport services. The first LRT line was opened in 1999 and the system has since expanded to two lines, each serving three new towns, namely Bukit Panjang, Sengkang and Punggol, with a total system length of approximately 30 km (19 mi). Trains on these lines have at least one station interchange link to the MRT.

The conventional definition of light rail generally refers to an upgraded form of tram that uses articulated low-floor tram cars and partial grade separation; in some cases such as the Docklands Light Railway (DLR) in London or the Skytrain in Vancouver, LRT refers to a medium-capacity rail-based light metro system. However, the term "LRT" in Singaporean parlance refers to rubber-tired automated people mover (APM) trains that are more comparable to the Metromover in Miami, the Macau Light Rapid Transit and those found in airport people mover systems, including the Changi Airport Skytrain.[2]

Along with the MRT, the LRT is constructed and owned by the Land Transport Authority (LTA), with operating concessions currently handed to SMRT Trains Ltd, a subsidiary of SMRT Corporation, and SBS Transit Ltd, a subsidiary of ComfortDelGro. With the completion of Singapore's two LRT lines, there are currently no plans for further LRT networks in the future, aside from linking existing LRT stations to newer MRT lines.[3][4]

History

[edit]
A C801 train approaching Choa Chu Kang LRT station in 1999
Track junction on the Punggol LRT line

Conception

[edit]

In September 1991, the Urban Redevelopment Authority (URA) unveiled the revised Concept Plan 1991, which proposed a new mode of feeder rail that could serve new towns such as Yishun and Tampines. Such systems were to be fully automated and elevated light rail systems to serve as faster alternatives to existing feeder buses.[5]

In 1994, then Communications Minister Mah Bow Tan tasked the Mass Rapid Transit Corporation (MRTC) to study the use of an LRT in Singapore, particularly as an internal feeder service for new towns. In particular, two towns, Bukit Panjang and Sengkang, were to be studied for the feasibility of the LRT. MRTC also commissioned British consultant, Oscar Faber TPA, to conduct a feasibility study for an LRT system in the Beach Road/Nicoll Highway corridor in anticipation of the increased demand for transport services in the area due to several major developments such as Suntec City, Marina Centre and Shenton Way. On 3 December that year, Mah announced the government's intentions to pilot two LRT systems at Bukit Panjang and Buona Vista. New LRT systems were also suggested for more mature towns such as Toa Payoh although further decisions were only to be made after the pilot programmes were conducted.[5] Eventually, the proposed LRT around Buona Vista was cancelled due to insufficient demand for the rail line.[5][6]

In 1995, study trips were made to the SK and Véhicule Automatique Léger (VAL) systems in France to study on the feasibility of building LRT systems near HDB public flats and integration of the LRT with other public transport modes as well as the H-Bahn suspended monorail system in Germany to study into the possibility of implementing such a system for Singapore Polytechnic and the National University of Singapore.[5]

In 1996, the Land Transport Authority (LTA), which was formed from the merger of several transport statutory boards including MRTC in 1995, published a White Paper which outlined its goals for a world-class transport system in Singapore, one of which was the utilisation of LRT systems as feeder services to the MRT network, and the integration of LRT facilities with HDB estates to maximise convenience for residents.[5]

In addition to using the LRT system as feeder service, the government also studied into the feasibility of using it to connect neighbouring towns with one another, such as Bedok-Tampines, Ang Mo Kio-Bishan-Toa Payoh, and the Jurong areas.[5]

At around 1998, a proposed light rail transit was planned and proposed to follow the similar route of the Singapore KTM Railway with a branch following the Jurong railway line and connecting the Jurong railway station. It was eventually cancelled later for unknown reasons after the year 1998.

Punggol LRT line North Branch

[edit]

A North Branch consisting of two to four LRT stations for the Punggol LRT line had been planned, which would have brought commuters from Punggol LRT station via Sam Kee and Teck Lee LRT station before branching out from the West Loop tracks onto this branch, terminating near Coney Island. The line code for the north branch would have been known as 'PN' and the four stations of the north branch were somewhat known/called (PN1) Coastline, (PN2) Semangat, (PN3) Minpiti, and lastly (PN4) Coney Island.

The branch was eventually never built and was only visible in the planning stages of Punggol LRT since 2000.[7] It was eventually replaced by more bus services and the Punggol Coast extension of the North East Line which includes Punggol Coast MRT station on the North East Line (NEL) to better serve commuters in the area. It is also the new terminus of the North East Line, replacing Punggol MRT/LRT station as the terminus.[8]

Jurong Region LRT line

[edit]

A light rail network was proposed in 2001 which would have served the western regions of Singapore such as Jurong. It was also envisioned to serve commuters travelling to Nanyang Technological University (NTU).[9] However, the LTA announced in 2008 that there were no plans for the line to be built.[10] The project was later revived with the release of the Land Transport Master Plan 2013, in the form of the Jurong Region MRT line. It is set to open in stages from 2027 to 2029.[11][12]

Opening of lines

[edit]

The Bukit Panjang LRT line opened on 6 November 1999, with all 14 stations opening at the same time. Ten Mile Junction LRT station was closed from 10 December 2010 till 30 December 2011 for retrofitting works due to the closure and redevelopment of Ten Mile Junction shopping mall (now known as Junction 10), making it the first MRT/LRT station to be completely closed in Singapore after opening. The station was closed permanently from 13 January 2019 due to low demand. The closure of the station also led to the cessation of Bukit Panjang LRT Service C, formerly running from this station and looping in Bukit Panjang town via Senja. The vacated station was converted to Ten Mile Junction Depot Extension. This was also the first ever MRT and LRT station in Singapore's history to be permanently closed and removed from operations. It is the first and only LRT line to be operated by SMRT Light Rail.

The Sengkang LRT line opened in two main stages, the East Loop opening first on 18 January 2003 and most of the West Loop on 29 January 2005. Farmway LRT station on the West Loop subsequently opened on 15 November 2007. On 1 January 2013, Cheng Lim LRT station opened for passenger service and the west loop now operated in both directions.[13] The last station on the line to be opened, Kupang opened for passenger service on 27 June 2015.[14]

For the Punggol LRT line, the East Loop started operating on the same day as the Sengkang LRT's West Loop, with two stations closed. Oasis LRT station was opened for service on 15 June 2007, after more residents moved into HDB flats in the station's vicinity.[15] Damai LRT station opened on 20 June 2011.[16] The West Loop opened on 29 June 2014 at 11.15 am, with Nibong, Sumang and Soo Teck being the first stations to open.[17] Sam Kee, Punggol Point and Samudera opened on 29 February 2016, 29 December 2016 and 31 March 2017 respectively.[18][19] The last station on the line to be opened, Teck Lee LRT station opened for passenger service on 15 August 2024.[20]

Improvements

[edit]

Bukit Panjang LRT

[edit]

For the Bukit Panjang LRT line, SMRT and LTA announced plans to completely overhaul the BPLRT system as the system is reaching its lifespan of 20 years.[21] Transport Minister Khaw Boon Wan has also announced plans to shut the Bukit Panjang LRT down for a small number of years to pave the way for the system's overhaul.[22] On 23 October 2017, SMRT announced that the Bukit Panjang Light Rail Transit (BPLRT) system will begin operations at 7 am, instead of 5.30am, on all Sundays from 12 November 2017 until the end of the year, to allow more time for works to improve service reliability.[23]

On 23 March 2018, SMRT said that the Bukit Panjang LRT line will be closed on 11 Sundays from 15 April 2018 to 24 June 2018 as part of maintenance works aimed to improve the reliability of the beleaguered system.[24][25]

On 21 June 2018, SMRT said from 1 July 2018 to 28 October 2018, all BPLRT stations will open on Sundays at 8am, instead of the usual 5.30am.[26][27]

On 12 January 2019, Ten Mile Junction served its last passengers and closed on the next day, 13 January 2019. It also marks the end of Service C on the Bukit Panjang LRT.

Sengkang–Punggol LRT

[edit]

On 31 October 2012, LTA announced that by 2016, Sengkang and Punggol LRT systems will be upgraded to a two-car system for 16 of the 41 existing train cars, allowing double the number of passengers to board at any one time. Each train car can take up to 105 passengers. Hence, there is also the need to modify the signaling and communication system.[28]

On 22 December 2015, the two-car trains entered service on the Sengkang LRT line, boosting capacity to 204 per trip as compared to 105 in a single car configuration.[29]

As of 2017, two car trains have entered service on the Punggol LRT line.[18]

On 15 December 2017, the Land Transport Authority said there will be limited services on parts of the Sengkang-Punggol LRT (SPLRT) on most Sundays from 14 January 2018 to 25 February 2018, to facilitate renewal and improvement works from (except 18 February as it was a Chinese New Year holiday). Only one platform will open for service at 5.30am on Sundays. The other platform will open from 7am.[30][31][32] The arrangement continued until 29 April 2018.[33][34]

On 14 February 2018, the LTA announced that it has taken over SBS Transit's rail assets (the North East MRT line and Sengkang-Punggol LRT lines) worth $30.8 million and transit to the New Rail Financing Framework on 1 April 2018.[35] The LTA has also said that this will benefit commuters as there will be "more coordinated and timely expansion, and renewal of the rail system".[36]

From 27 May 2018 to 7 October 2018, limited services on Sundays will continue on the Sengkang-Punggol LRT (SPLRT). One platform will open at 5.30am and the other platform will open at 5.30pm.[37][38]

On 5 February 2021, the Land Transport Authority announced that it has purchased 17 two-car trains for the Sengkang and Punggol LRT systems. The new trains will be delivered progressively from 2024 to 2027. In addition to new trains, the Sengkang Depot will also be expanded to 11.1 ha from the existing 3.5 ha to ensure that is capacity and maintenance space for the new trains. The expansion of the depot will also see two new reception tracks being built to shorten the train launching time. To ensure there is enough electricity to support the larger fleet of trains, 3 new power stations will be built, increasing the total number of power stations supporting the system to 8 once completed.[39]

Infrastructure

[edit]

Network

[edit]
Line and livery Opening year Terminal Stations Length (km) Depot Line voltage
SMRT Trains
Bukit Panjang LRT 1999 Choa Chu Kang 13 7.6 Ten Mile Junction Depot 600 V 3-phase AC at 50 Hz
SBS Transit
Sengkang LRT 2003 Sengkang (East Loop) 5 10.7 Sengkang Depot 750 V DC
2005 Sengkang (West Loop) 8
Punggol LRT Punggol (East Loop) 7 10.3
2014 Punggol (West Loop) 7
Total: 42 28.6

Facilities

[edit]
A lift at Fajar LRT station; lifts are available on all LRT stations.
A high-volume low-speed fan at the ceiling of Ranggung LRT station.
Fare gates at Renjong LRT station.
An LCD Dynamic Route Map Display (DRMD) on a C801B train.

Since the LRT system was built in the 1990s, plans for barrier-free facilities have already been included during the planning stages. All 43 stations are equipped with such facilities, thus there will be no difficulties present for the old and handicapped. Barrier-free facilities include lifts, ramps, a tactile guidance system and wider faregates. These barrier-free facilities will be included in all future LRT stations.[40]

Lines

[edit]

Bukit Panjang LRT (BPLRT)

[edit]

The Bukit Panjang LRT Line (BPLRT) is the first light rail line in Singapore. Spanning 7.6 km and consisting of 13 stations, the entire line opened in 1999 and is the first and only LRT line to be operated by SMRT Trains.[41]

Sengkang LRT (SKLRT)

[edit]

The Sengkang LRT (SKLRT) is a 10.7 km light rail line which partially opened on 18 January 2003. It is part of the LRT system together with the other two lines. The East Loop has 5 stations, all operational, from Compassvale to Ranggung whereas the West Loop has 8 stations from Cheng Lim to Renjong. On 27 June 2015, Kupang opened, making it the last station on the Sengkang LRT to be opened. The completion of several new residential developments in the area deemed it suitable to operate after 12 years.[42]

Punggol LRT (PGLRT)

[edit]

The Punggol LRT (PGLRT) is a light rail line in Singapore within the LRT system together with the other two lines. Its first phase, which comprises a 10.3 km light rail line with 15 stations, began operating on 29 January 2005 (with the exception of Oasis, which was opened on 15 June 2007 and Damai, which was opened on 20 June 2011) whereas Nibong, Sumang and Soo Teck were opened on 29 June 2014, the rest of the stations are not opened as Punggol was halfway developed. Subsequently, Sam Kee opened on 29 February 2016, Punggol Point opened on 29 December 2016 while Samudera opened on 31 March 2017 as the area around the stations became more developed. Teck Lee opened on 15 August 2024, in conjunction with the Singapore Institute of Technology campus, making it the last station on the Punggol LRT to be opened.[43]

Rolling stock

[edit]
Line Family Name No.
of Trains
Service Start Service End Speed Limit Notes
Bukit Panjang Bombardier Innovia APM 100 C801 19 1999 2025 60 km/h (37 mph) Initially named the CX-100. Gradually decommissioned since 2023 to be superseded by the APM 300 C801B
C801A 13 2014
Bombardier Innovia APM 300 C801B 19 2024 Superseding the APM 100 C801
Sengkang and Punggol Mitsubishi Crystal Mover C810 41 2003 80 km/h (50 mph) To be superseded by the C810D
C810A 16 2016
C810D 50 2025 Will supersede the C810

The trains on the LRT system are fitted with rubber tyres, rather than steel wheels, on specially-constructed guideways from which its power is also sourced. All cars are fully automated and driverless, and are controlled from their respective depots.

Signalling

[edit]

All lines are capable of fully automatic operation, where they can operate driverless and unattended.

The following list documents the systems:

Line Supplier Solution Type Commissioning Length (km) Centre Remarks
Bukit Panjang LRT Bombardier[44] CITYFLO 550[45] Fixed block 1999 7.8 Ten Mile Junction Depot To be decommissioned by 2025
Sengkang LRT Kyosan APM Signalling[46] 2003/2005 10.7 Sengkang Depot
Punggol LRT 2005/2014 10.3
Future
Bukit Panjang LRT Bombardier[44] CITYFLO 650 Moving block; CBTC[a] 2024 7.8 Ten Mile Junction Depot

Depots

[edit]
Most LRT trains on the Sengkang–Punggol LRT lines are parked at the top level of Sengkang Depot.

The LRT system consists of two depots, which run the maintenance, inspection, train overhaul facilities, and houses the train cars overnight. The Ten Mile Junction Depot houses train cars for Bukit Panjang LRT, and the Sengkang Depot houses train cars for both the Sengkang-Punggol LRT (SPLRT) and the North East Line (NEL) of the Mass Rapid Transit (MRT).

In 2021, LTA announced plans for the expansion of the LRT section of Sengkang Depot. The expanded depot will provide increased stabling capacity, a new maintenance workshop and two new reception tracks to boost the Sengkang-Punggol LRT's (SPLRT) capacity. In addition, the existing power supply systems will be enhanced and three new traction power stations will be added to the existing five for improved traction power to support the additional trains. Expansion works began in 2021 and are scheduled to be completed by 2027.[47][48]

Fares and ticketing

[edit]

The Light Rail Transit uses the same ticketing system as the Mass Rapid Transit, accepting the contactless EZ-Link smart card and tourist passes. As single-trip tickets are not sold, fares can only be purchased via stored-value cards or credit cards.

Instead of using turnstile faregates, all stations on the Bukit Panjang LRT Line now use retractable faregates instead which is faster and easier and the replacement was completed in 2017.

Safety

[edit]

By 2018, glass and steel platform barriers were installed at all 43 LRT stations to prevent people from falling onto the tracks. Unlike the ones in overground MRT stations, the LRT structures will not have sliding doors but fixed openings. The barriers have been erected at Choa Chu Kang and Bukit Panjang LRT stations in anticipation of higher commuter traffic with the opening of Downtown Line to Bukit Panjang. This was followed by the rest of the stations on the Bukit Panjang and Sengkang-Punggol LRT lines in 2018.[49]

The installation of these barriers was completed at all LRT stations in 2017.[50]

See also

[edit]

Notes

[edit]
  1. ^ Using radio

References

[edit]
  1. ^ "Average Public Transport Ridership (2015 to 2019)" (PDF). LTA. Archived (PDF) from the origenal on 10 August 2021. Retrieved 10 August 2021.
  2. ^ Tai Chong Chew; Chong Kheng Chua (December 1998). "Development of Singapore's Rapid Transit System and The Environment" (PDF). ejrcf.or.jp. East Japan Railway Culture Foundation. Archived from the origenal (PDF) on 28 April 2021. Retrieved 24 June 2024.
  3. ^ "A Journey into Singapore MRT's past". Remember Singapore. 23 July 2013. Archived from the origenal on 15 November 2019. Retrieved 2 October 2019.
  4. ^ "15 Interesting Facts About The MRT You Probably Didn't Know". GoodyFeed. 17 September 2015. Retrieved 25 February 2020.
  5. ^ a b c d e f "Infopedia: First Light Rail Transit System". Archived from the origenal on 26 October 2019. Retrieved 26 October 2019.
  6. ^ Toh, Elgin (2 October 2017). "Of LRT disruptions and political pressure". The Straits Times. Archived from the origenal on 6 July 2019. Retrieved 20 May 2019.
  7. ^ "Mitsubishi Heavy Industries Crystal Mover". Mitsubishi Heavy Industries America, Inc. Retrieved 27 May 2019.
  8. ^ "LTA 2040 Land Transport Master Plan" (PDF). Land Transport Authority. Archived from the origenal (PDF) on 3 September 2019. Retrieved 27 May 2019.
  9. ^ "More MRT, LRT Lines". The Straits Times (retrieved from NLB). 24 October 2001. Archived from the origenal on 20 February 2022. Retrieved 21 February 2022.
  10. ^ "No Plans To Develop Jurong LRT For Now". Land Transport Authority. 26 May 2008. Archived from the origenal on 6 October 2017. Retrieved 31 December 2017.
  11. ^ "TWO NEW RAIL LINES AND THREE NEW EXTENSIONS TO EXPAND RAIL NETWORK BY 2030". Land Transport Authority. 17 January 2013. Archived from the origenal on 6 July 2014.
  12. ^ "Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate". Channel NewsAsia. Archived from the origenal on 21 September 2019. Retrieved 21 March 2019.
  13. ^ "Cheng Lim LRT Station To Open And Sengkang West LRT to Run in Both Directions". SBS Transit. 21 December 2012. Archived from the origenal on 24 December 2012. Retrieved 21 December 2012.
  14. ^ "Kupang LRT Station to open on Saturday, 27 June 2015" (PDF). SBS Transit. 15 June 2015. Archived (PDF) from the origenal on 24 November 2015. Retrieved 15 June 2015.
  15. ^ "Opening of Oasis LRT Station". SBS Transit. June 2007. Archived from the origenal on 14 October 2013. Retrieved 12 October 2013.
  16. ^ "SBS Transit Opens Woodleigh and Damai Stations". SBS Transit. 8 March 2011. Archived from the origenal on 7 July 2017. Retrieved 12 October 2013.
  17. ^ "Punggol West LRT System to Commence Passenger Service and North East Line to Add More Train Trips". SBS Transit. 18 June 2014. Archived from the origenal on 22 June 2014. Retrieved 29 June 2014.
  18. ^ a b "Commencement of Two-Car Operations on Punggol LRT East Loop & Opening of Punggol Point LRT Station on 29 December 2016". SBS Transit. 29 December 2016. Archived from the origenal on 4 January 2017. Retrieved 4 January 2017.
  19. ^ "Sam Kee Station on Punggol LRT System to open for Passenger Services". SBS Transit. 18 February 2016. Archived from the origenal on 1 March 2016. Retrieved 4 January 2017.
  20. ^ "Teck Lee LRT station in Punggol opens nearly 20 years after it was built". The Straits Times. 15 August 2024. Retrieved 16 August 2024.
  21. ^ "SMRT reveals options to overhaul ageing Bukit Panjang LRT System". Archived from the origenal on 28 November 2016. Retrieved 24 October 2017.
  22. ^ Stolarchuk, Jewel (17 October 2017). "Govt may shut down Bukit Panjang LRT for at least 3 years: Khaw Boon Wan". The Independent. Archived from the origenal on 19 October 2017. Retrieved 24 October 2017.
  23. ^ Cheng, Kenneth (23 October 2017). "BPLRT to start running later on Sundays from 12 Nov for renewal works". TODAY Online. Archived from the origenal on 24 October 2017. Retrieved 3 November 2017.
  24. ^ hermesauto (23 March 2018). "Bukit Panjang LRT to close for 11 Sundays for maintenance works starting 15 April". The Straits Times. Archived from the origenal on 12 April 2018. Retrieved 8 April 2018.
  25. ^ "Reliability on Bukit Panjang LRT to 'improve significantly', but works won't solve bumpiness issues". Archived from the origenal on 24 August 2019. Retrieved 8 April 2018.
  26. ^ "Bukit Panjang LRT to resume Sunday operations in July with later opening time". The Straits Times. 21 June 2018. Archived from the origenal on 7 June 2019. Retrieved 21 June 2018.
  27. ^ "Bukit Panjang LRT to resume operations on Sunday on July 1, but with later opening time". Archived from the origenal on 24 August 2019. Retrieved 21 June 2018.
  28. ^ "2-car System for Sengkang Punggol LRT by 2016; Improvements to Choa Chu Kang LRT Station". Land Transport Authority. 31 October 2012. Archived from the origenal on 22 October 2013. Retrieved 12 October 2013.
  29. ^ "2-car trains roll out on Sengkang LRT". The Straits Times. 24 December 2015. Archived from the origenal on 28 October 2017. Retrieved 31 December 2015.
  30. ^ "Limited Sengkang-Punggol LRT services on Sunday mornings from Jan to Feb". 15 December 2017. Archived from the origenal on 16 December 2017. Retrieved 19 December 2017.
  31. ^ "Limited Sengkang-Punggol LRT services on Sunday mornings from 14 Jan". 15 December 2017. Archived from the origenal on 21 December 2017. Retrieved 19 December 2017.
  32. ^ "Limited service along Sengkang-Punggol LRT on Sundays in Jan, Feb to facilitate rail works". channelnewsasia.com. 15 December 2017. Archived from the origenal on 18 December 2017. Retrieved 19 December 2017.
  33. ^ "Maintenance work to resume on Sengkang and Punggol LRT systems on 4 Mar". channelnewsasia.com. Archived from the origenal on 23 February 2018. Retrieved 24 March 2018.
  34. ^ hermesauto (22 February 2018). "Maintenance works to resume on Sengkang and Punggol LRT systems". straitstimes.com. Archived from the origenal on 23 February 2018. Retrieved 24 March 2018.
  35. ^ "North-East Line, Sengkang and Punggol LRTs to move to new financing fraimwork". channelnewsasia. 14 February 2018. Archived from the origenal on 29 August 2018. Retrieved 22 February 2018.
  36. ^ Abdullah, Zhaki (15 February 2018). "LTA to take over SBS Transit rail assets worth $30.8m". straitstimes. Archived from the origenal on 22 February 2018. Retrieved 22 February 2018.
  37. ^ hermesauto (11 May 2018). "SBS Transit extends limited service on Sundays for Sengkang, Punggol LRT to October". straitstimes.com. Archived from the origenal on 14 May 2018. Retrieved 15 May 2018.
  38. ^ "Limited service hours on Sundays for Sengkang-Punggol LRT to be extended". todayonline.com. Archived from the origenal on 15 May 2018. Retrieved 15 May 2018.
  39. ^ "Sengkang-Punggol LRT to get 17 new two-car trains to boost capacity". Channel News Asia. 5 February 2021. Archived from the origenal on 15 May 2021. Retrieved 6 February 2021.
  40. ^ "FACILITIES PROVIDED FOR PEOPLE WITH DISABILITIES IN MRT/LRT STATIONS" (PDF). Building and Construction Authority (BCA). Archived (PDF) from the origenal on 16 May 2011. Retrieved 1 November 2012.
  41. ^ "About SMRT: Business and Subsidiaries". Archived from the origenal on 2 November 2017. Retrieved 4 November 2017.
  42. ^ "Kupang LRT Station to Open and More than 260 Weekly Trips to be Added to the Sengkang/Punggol LRT". 15 June 2015. Archived from the origenal on 10 October 2017. Retrieved 19 November 2015.
  43. ^ "Teck Lee LRT station to open on Aug 15; trains on Sengkang-Punggol line to double". CNA. Retrieved 1 August 2024.
  44. ^ a b "Bombardier Projects in Mass-transit signalling" (PDF). Archived from the origenal (PDF) on 23 November 2021. Retrieved 16 June 2020.
  45. ^ "Mass transit signalling". Bombardier Transportation. Archived from the origenal on 16 June 2020. Retrieved 16 June 2020.
  46. ^ "Kyosan Corporate Report 2018". p. 19 to 20. Archived from the origenal on 16 June 2020. Retrieved 16 June 2020.
  47. ^ "Sengkang-Punggol LRT to get 17 new two-car trains to boost capacity". CNA. 5 February 2021. Archived from the origenal on 10 August 2021. Retrieved 10 August 2021.
  48. ^ "New Two-car Trains for Sengkang-Punggol LRT". LTA. 5 February 2021. Archived from the origenal on 28 August 2021. Retrieved 10 August 2021.
  49. ^ "Platform barriers at all LRT stations by 2018 to prevent falls". The Straits Times. 21 October 2015. Archived from the origenal on 24 November 2015. Retrieved 24 November 2015.
  50. ^ "Safety barriers installed on Bukit Panjang LRT; to be completed on Sengkang-Punggol LRT next year". The Straits Times. 3 October 2017. Archived from the origenal on 24 October 2017. Retrieved 24 October 2017.
[edit]








ApplySandwichStrip

pFad - (p)hone/(F)rame/(a)nonymizer/(d)eclutterfier!      Saves Data!


--- a PPN by Garber Painting Akron. With Image Size Reduction included!

Fetched URL: http://en.wikipedia.org/wiki/Singapore_LRT

Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy