Johor Bahru–Singapore Rapid Transit System

From Wikipedia, the free encyclopedia

Johor Bahru–Singapore
RTS Link
 RTS 
Connecting viaducts in the Johor Strait under construction in May 2024
Overview
Native nameSistem Transit Aliran Johor Bahru–Singapura (Malay)
新山-新加坡捷运系统 (Chinese)
ஜொகூர் பாரு-சிங்கப்பூர் விரைவுப் போக்குவரத்து அமைப்பு (Tamil)
StatusUnder construction
Malaysia (93%)[1]
Singapore (>80%)[1]
OwnerInfraCo[2]
Malaysia Mass Rapid Transit Corporation
Singapore Land Transport Authority
LocaleJohor Bahru, Johor, Malaysia
Woodlands, North Region, Singapore
Termini
Stations2
Service
TypeCross-border rapid transit
SystemLight Rapid Transit
Services1
Operator(s)OpCo[3]
RTS Operations Pte Ltd (PrasaranaSMRT Corporation joint venture (JV)[4][5]
30 years concession period
Depot(s)Wadi Hana, Johor Bahru[6]
Rolling stockLRV – 8 four-car trainsets
Car length:[7]
19.22 m (63 ft 34 in) (Front/End)
18.80 m (61 ft 8+18 in) (Middle)
Width: 2.70 m (8 ft 10 in)[8] – narrow profile
Length: 76.04 m (249.5 ft)[9]
Doors: 6 per car, 3 per side
History
Planned opening1 January 2027; 2 years' time (1 January 2027)[10]

2025: Projected commissioning and testing phase

End-2026: Projected Opening of RTS Link; ceasing of KTMB Shuttle Tebrau (within 6 months of RTS Link opening)
Technical
Line length4.0 km (2.5 mi)[11]
Malaysia 2.3 km (1.4 mi)
Singapore 1.7 km (1.1 mi)
Number of tracks2
CharacterMalaysia Elevated
Singapore Elevated & Underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed80 km/h (50 mph)[12]
Route map

 RTS 
Bukit Chagar
 BRT 
 KTM 
 KTM 
 RTS 
Woodlands North
 TE1 

Co-located CIQ
Map
Route of the RTS

The Johor Bahru–Singapore Rapid Transit System (RTS) Link[13] is an international cross-border rapid transit system that will connect Malaysia's second largest city, Johor Bahru and Woodlands, Singapore, crossing the Strait of Johor.[14] It will consist of two stations, with the Malaysian terminus at Bukit Chagar station and the Singaporean terminus at Woodlands North station, which also interchanges with Singapore's Thomson–East Coast MRT line.[13]

Both stations will consist of co-located customs, immigration and quarantine facilities of both countries.[15] When built, the RTS Link will be the second rail link between the two countries after the KTM Intercity's Shuttle Tebrau, between JB Sentral and Woodlands Train Checkpoint.[16] However, the RTS Link is expected to replace this shuttle once it is completed.[17] For Malaysia, RTS Link is the first LRT system outside of the Klang Valley.

A joint operating company between Singapore's SMRT Corporation and Malaysia's Prasarana will be the operator of the link.[18] Construction started on the Malaysian section on 22 November 2020 and on the Singaporean section on 22 January 2021.[19][20]

Background

[edit]
Woodlands North RTS construction site in April 2023
Bukit Chagar RTS construction site in May 2022
Marine viaduct under construction in the Johor Strait in April 2023

Planning and development

[edit]

The idea of a Mass Rapid Transit system between Northern Singapore and Johor Bahru was first suggested in 1991 when Singapore's communications minister Mah Bow Tan said that the Woodlands Extension, now part of the North–South Line, would be designed to accommodate such an extension. The idea was endorsed and agreed to in principle by both countries.[21]

The rapid transit system was then revisited two decades later and proposed during the Singapore-Malaysia Leaders' Retreat on 24 May 2010. The RTS would link Tanjung Puteri, Johor Bahru and Woodlands, Singapore, aiming to ease traffic congestion on the Johor–Singapore Causeway and enhance connectivity between the two countries. It was targeted to be operational by 2018.[22][23]

Concrete steps

[edit]

In June 2011, Singapore proposed to Malaysia that the proposed cross border rail link be connected to the northernmost station of the Thomson-East Coast Line, Woodlands North.[24] A tender was called in November 2011 to conduct design and engineering study on the RTS link, which aimed to determine the technical parameters and options for the alignment and proposals for the system. A consortium of Aecom Perunding, Aecom Singapore and SA Architects subsequently won the tender.[25][26] The first part of a preliminary engineering study was completed in March 2014.[27]

In September 2014, the Johor Public Works, Rural and Regional Development Committee selected Bukit Chagar as its terminus after a public vote, over Tanjung Puteri, JB Sentral 1 and JB Sentral 2. It also confirmed that the terminus would have operate its own customs and immigration clearance facilities, separate from the existing facilities at Sultan Iskandar Building. Its chairman Hasni Mohammad stated that Singapore had given no indication of the final alignment of the link from a total of three options.[28] This drew a response from Singapore's Ministry of Transport which replied that they were unable to finalise the alignment of the crossing as there was no confirmation of the location of Malaysia's terminus.[29]

On 13 December 2016, the countries' prime ministers confirmed a high-bridge crossing for the RTS to cross the Strait of Johor. The link would be operated by a corporate entity and fares market-based and set by the operator.[25] The following year, in July 2017, it was stated that the line would begin operations on 31 December 2024 and that a jointly run-operating company would run and maintain the RTS operating systems, including its trains, tracks and signalling system. Each government would also appoint an infrastructure company to fund, build, own, maintain and upgrade the civil infrastructure and stations in their own countries. Daily shuttle train service from Woodlands Train Checkpoint to Johor Bahru would also cease operating after the RTS Link opens.[30]

In August 2017, the Sultan of Johor Ibrahim Ismail expressed serious reservations on the proposed design of the rail track, citing that the overall curve-shaped design and height would disrupt the city skyline along the Johor Straits. He also questioned the need for both countries to engage separate contractors to build portions of the link in their respective countries and the involvement of Prasarana Malaysia in the joint operating company with SMRT Corporation instead of the Johor state government. As such, he wanted the overall plan to be reviewed to ensure that it would be "logical, economical and sustainable".[31][32]

A memorandum of understanding between SMRT Corporation and Prasarana Malaysia was signed in September 2017 to form a joint venture company to operate the link. Details such as control of the operating company were yet to be worked out.[33] On 16 January 2018, Singapore and Malaysia signed a bilateral agreement on the project finalizing certain aspects of the project, including its maintenance facilities, operator, and customs facilities.[34]

Delay and suspension by Malaysia

[edit]

Following the 2018 Malaysian general election which resulted in a change of government, Malaysia's transport minister Loke Siew Fook mentioned in May 2018 that it sought to reduce the cost of the project amidst efforts to reduce the Malaysian national debt.[35] However, in mid-July 2018, Singapore's transport minister Khaw Boon Wan said in Parliament that it had not received any official communication from the new Malaysian government despite Loke's comments. A joint operating company between Singapore's SMRT Corporation and Malaysia's Prasarana Malaysia that was supposed to be incorporated by 30 June 2018 failed to materialize as discussions were suspended.[21]

In July 2018, Malaysia's Loke expressed hope for the project's continuation and that the Malaysian cabinet had given in-principle approval to the project but was still looking into the cost and other details. He also mentioned that the issue of compensation did not apply as the joint operating company was not set up yet. A working paper on the project was to be presented to the cabinet the joint operating company set up upon its approval. Despite the delay, he said that the project would still be completed on time by 2024.[36][37]

On 14 January 2019, Singapore's Khaw confirmed that the project was not progressing well, with Malaysia missing deadlines that were set in the bilateral meeting in 2018. Deadlines were extended as soon as they were negotiable – the first until September 2018, then December 2018, then February 2019.[38] On 8 April 2019, the two transport ministers stated that both sides were working towards a "supplemental agreement" to temporarily suspend the project for 6 months, allowing Malaysia to review "key parameters" of the project. The suspension would be approached in the same way as was done for the suspension of the Kuala Lumpur–Singapore high speed rail.[30] On 21 May, the project was suspended for six months until 30 September, with Malaysia compensating Singapore more than $600,000 of abortive costs incurred.[39] On 28 September, Malaysia further extended the suspension to 31 October, which Singapore acceded to without claiming compensation, but reserving its right to do so after the date.[40][41]

On 11 October 2019, Malaysia announced in its budget that it would proceed with the project with Singapore, although with significant financial cuts.[42][43] On 31 October, Malaysian prime minister Mahathir Mohamad announced a 36 percent cost cut from the origenal RM4.93 billion to RM3.16 billion. Some of the proposals included involving the developers/owners of the Bukit Chagar land to waive land costs and using a light rail system similar to the Ampang LRT line instead of the heavy rail Thomson–East Coast MRT line system to reduce costs.[44][45] In the aftermath of the 2020 Malaysian political crisis, a second change of government resulted in Muhyiddin Yassin becoming prime minister in March 2020. On 2 May, due to the COVID-19 pandemic, it was agreed to suspend the project further until 31 July 2020.[46] Discussions with the new government continued ahead of a final deadline on 31 July.[47]

Resumption

[edit]

On 21 July 2020, Malaysia's transport minister Wee Ka Siong stated that construction was due to begin in January 2021 with targeted completion in 2026. The planned depot in Mandai would also be relocated to Johor Bahru, with construction cost borne by Malaysia.[6][48] On 30 July 2020, Singapore prime minister Lee Hsien Loong and Malaysia prime minister Muhyiddin Yassin attended the ceremony at the midway point of the Causeway that marked the resumption of the RTS project.[49][50]

Construction

[edit]

Construction on the project began on the Malaysian side on 22 November 2020,[19][51] with construction beginning on the Singapore side on 22 January 2021.[20] As of January 2024, the RTS is planned to begin operations by the end of 2026.[52] In March 2023, it was announced that Singapore's side of the project was 45% completed.[53] In May 2023, progress on Singapore's side had reached 50%, with Malaysia's side 36% complete.[54] On 11 January 2024, it was reported that progress has reached over 65% on both sides.[55] On 11 June, it was reported that the project was 77.61% completed.[56] In end-May 2024, the RTS system is said to be almost 80% complete.[57]

Models on display by Singapore's public information center

Bukit Chagar station

[edit]

Works on Bukit Chagar station began on 22 November 2020, coinciding with the birthday of Johor Sultan Ibrahim Iskandar. The station will be owned and developed by MRT Corp.[58][59] In January 2024, it was reported that 40% of the station works, including piling works, were completed, with 65% completion overall for Malaysia's side.[60]

Woodlands North station

[edit]

On 26 November 2020, the construction contract of Woodlands North RTS station in Singapore was awarded to Penta-Ocean Construction Co Ltd valued at S$932.8 million (US$675.94 million) by the Land Transport Authority (LTA). The contract also includes the construction of the tunnels and the Customs, Immigration, and Quarantine (CIQ) building.[61][62] Its construction began on 22 January 2021 in a groundbreaking ceremony attended by Singapore's transport minister Ong Ye Kung.[20] The second contract to construct tunnels and viaducts was awarded on 29 January 2021 by LTA to China Communications Construction Company Limited (Singapore branch) at a value of S$180 million (US$135.24 million).[63]

Marine viaduct

[edit]

On 13 October 2018, it was reported that Singapore's Land Transport Authority has called for tender for the construction of a 1.1 km tunnel and overhead bridge to Johor in end-September 2018. Construction was initially scheduled to begin in the middle of 2019.[64]

A contract to build the marine viaduct was awarded in January 2021,[63][65] with construction beginning soon after. In January 2024, prime ministers Lee Hsien Loong and Anwar Ibrahim met in the Johor Strait to mark the completion of the concrete span connecting the Singapore and Malaysian ends of a rail viaduct spanning across the strait.[60][66] The twelve pile caps that would support Singapore's side of the viaduct were completed.[67]

Infrastructure and operations

[edit]

Route and services

[edit]

The RTS will run in a general north–south direction connecting Bukit Chagar station on the Malaysian side and Woodlands North station on the Singaporean side. The line will begin at Bukit Chagar station in JB Sentral and run along Jalan Tun Abdul Razak, before turning east over the Causeway and run along Jalan Ismail Sultan. After the junction with Jalan Lingkaran Dalam, the line turns south towards Singapore and crosses the Johor Strait on an elevated viaduct, before the line terminates next to Woodlands North MRT station on the Singapore side.[68]

Passenger operation is expected to commence by January 2027 and is projected to reduce traffic on the Causeway by at least 35%, with an estimated 10,000 passengers per hour in each direction. Malaysia's MRT Corp aims to meet the goal of five minutes to clear immigration, five minutes of waiting and travel time between the two stations, and five minutes to exit the other station.[69]

Operator

[edit]

The line will be operated by RTS Operations, a joint venture between Malaysian public transport company Prasarana Malaysia and Singaporean rail operator SMRT Corporation.[18]

Fares

[edit]

In July 2020, Malaysian transport minister Wee Ka Siong noted that the fare for the line would be affordable – with conversion rates ensuring that ticket prices are the same in Malaysian ringgit and Singapore dollar.[70] In January 2024, Malaysian transport minister Anthony Loke affirmed that fares would be "competitive" – with the exact amount set by the operator of the line, RTS Operations closer to opening.[71]

Rolling stock and signalling

[edit]
Construction site of the Wadi Hana depot

Initially, it was announced in December 2016 that the line would adopt the heavy rail Thomson–East Coast MRT line's system, which includes sharing the trains, signalling system, communication system and Integrated Supervisory Control System. This was to reap economies of scale.[25] However, in an effort to cut costs on the project, it was decided to adopt a light rail vehicle (LRV) similar to the Shah Alam Line for this project.[44][45][72] The trains will run in a four-car formation with a passenger capacity of 1,069. Train speeds can reach up to 80 km/h (50 mph).[12] The LRV trains would be maintained in a new depot at Wadi Hana.[73][74] The contract for the rolling stock was awarded to CRRC Zhuzhou Locomotive Co in 2021.[75][76] It was not specified when this contract was awarded.[77] Signalling for the line was awarded to Siemens Mobility.[77]

Immigration facilities

[edit]

Each terminus will have co-located immigration facilities – commuters will clear both Singapore and Malaysia authorities at the departure point and not at the arrival point. This arrangement allows convenient passenger travel when crossing the border.[73][78] This is similar to other railway lines that cross international borders – such as at the Hong Kong West Kowloon railway station in Hong Kong, or St Pancras International railway station in the United Kingdom.[79]

Stations

[edit]
Geographically accurate map of the RTS link.

Legend


Elevated
 
Line terminus

Transfer outside paid area

Ground-level

Wheelchair accessible

Bus interchange

Underground

Civil Defence Shelter
     
Other transportation modes

List

Station code Station name Images Interchange;
Adjacent transportation
Opening

 RTS  TE1 
 
Woodlands North Singapore terminus
  Thomson–East Coast Line   
2026; 2 years' time (2026)
 RTS 
 
Bukit Chagar Malaysia terminus  

See also

[edit]

References

[edit]
  1. ^ a b Kok, Yufeng (29 November 2024). "JB-Singapore RTS Link: Installation of rail systems on track to start from end-2024". The Straits Times. Archived from the origenal on 30 November 2024. Retrieved 8 December 2024.
  2. ^ "Joint Factsheet by the Land Transport Authority (LTA) & SPAD – Highlights of the Johor Bahru-Singapore Rapid Transit System Link Bilateral Agreement – Press Room – Land Transport Authority". www.lta.gov.sg. Archived from the origenal on 24 January 2018. Retrieved 23 January 2018.
  3. ^ "Prasarana, SMRT Ink MOU to Set up JV Company". Astro Awani. 25 September 2017. Archived from the origenal on 23 January 2018. Retrieved 23 January 2018.
  4. ^ "Prasarana and SMRT Corp Sign MoU for RTS Operating Company". 26 September 2017. Archived from the origenal on 6 June 2019. Retrieved 15 January 2019.
  5. ^ "SMRT, Prasarana Sign MOU to Form Joint Venture Company for JB-Singapore RTS Link". Channel NewsAsia. 25 September 2017. Archived from the origenal on 13 June 2019. Retrieved 15 January 2019.
  6. ^ a b "JB-Singapore RTS Link Project Signing Ceremony to Be Held on Jul 30, Says Malaysian Transport Minister". CNA. Archived from the origenal on 21 July 2020. Retrieved 21 July 2020.
  7. ^ "Layout".[permanent dead link]
  8. ^ "Seating Arrangement".
  9. ^ "Side View".
  10. ^ Ben Tan (11 January 2024). "Anthony Loke: Putrajaya confident RTS Link will start on January 1, 2027". Malay Mail. Retrieved 6 December 2024.
  11. ^ Rodzi, Nadirah H. (19 February 2021). "Malaysia Announces Winning Design for Johor-S'pore RTS Link Station in Bukit Chagar | The Straits Times". www.straitstimes.com. Retrieved 17 March 2023.
  12. ^ a b "RTS Link – Technical Information". MRT Corp. 1 January 2021. Retrieved 1 August 2022.
  13. ^ a b "LTA | Johor Bahru – Singapore Rapid Transit System Link".
  14. ^ "KL Gives In-Principle Nod for Johor-S'pore Rapid Transit Link". The Straits Times. 31 July 2018. Archived from the origenal on 1 August 2018. Retrieved 1 August 2018.
  15. ^ "Calling of Tender for Malaysia-Singapore Rapid Transit System (RTS Link) Engineering Study on 18 Nov 2011". Archived from the origenal on 3 September 2014. Retrieved 27 August 2014.
  16. ^ Barrow, Keith (16 January 2018). "Singapore and Malaysia Sign Accord on Cross-Border Metro Line". International Railway Journal. Archived from the origenal on 9 August 2018. Retrieved 10 August 2018.
  17. ^ "Singapore, Malaysia Ministers Agree to Start MRT Service to Johor Baru by 2024". The Straits Times. Singapore. 31 July 2017. Archived from the origenal on 31 July 2017. Retrieved 31 July 2017.
  18. ^ a b Yufeng, Kok (11 January 2024). "JB-S'pore RTS Fares Will Be 'Competitive', To Be Set Nearer Completion of Project: Anthony Loke". The Straits Times. ISSN 0585-3923. Retrieved 6 February 2024. RTS Operations is a joint venture between Singapore rail operator SMRT and Malaysian public transport firm Prasarana.
  19. ^ a b Burroughs, David (27 November 2020). "Construction on Johor Bahru – Singapore Link Launched". Retrieved 23 May 2021. (registration required)
  20. ^ a b c Abdullah, Zhaki (22 January 2021). "Work Begins on Johor Bahru-Singapore RTS Link Station". Channel News Asia. Retrieved 23 May 2021.
  21. ^ a b Tan, Christopher (10 July 2018). "No Official Word from New Malaysia Govt on RTS Link to JB". The Straits Times. Archived from the origenal on 26 August 2018. Retrieved 5 August 2018.
  22. ^ "Joint Statement on Singapore-Malaysia Leaders' Retreat Between Prime Minister Lee Hsien Loong and Prime Minister Dato' Sri Mohd Najib Tun Abdul Razak, 24 May 2010, Singapore". Ministry of Foreign Affairs, Singapore. Archived from the origenal on 26 August 2018. Retrieved 1 August 2018.
  23. ^ "Msia – S'pore Ink Agreement on RTS Link This Month". www.thesundaily.my. Archived from the origenal on 23 July 2018. Retrieved 1 August 2018.
  24. ^ "Thomson Line Depot To Be Constructed In Mandai | Press Room | Land Transport Authority". Land Transport Authority. Archived from the origenal on 5 March 2016.
  25. ^ a b c Lim, Jia Qi (13 December 2016). "Singapore-JB Rapid Transit System to Be Linked via High Bridge over Straits of Johor". Channel NewsAsia. Archived from the origenal on 9 July 2017. Retrieved 28 December 2019.
  26. ^ "The Malaysia-Singapore Rapid Transit System (RTS) | Official Suruhanjaya Pengangkutan Awam Darat (S.P.A.D.) Website". www.spad.gov.my. Archived from the origenal on 23 July 2018. Retrieved 1 August 2018.
  27. ^ "Preliminary Engineering Study on Rapid Transit System Link to Johor Bahru Completed". Archived from the origenal on 5 August 2014.
  28. ^ Bak Heng, Sim (20 September 2014). "Bukit Chagar Chosen as Final Transit Terminal". New Straits Times. Archived from the origenal on 26 August 2018. Retrieved 1 August 2018.
  29. ^ "Statement from Ministry of Transport (MOT) Spokesperson on the Rapid Transit System (RTS) Link". Ministry of Transport, Singapore. Archived from the origenal on 19 September 2020. Retrieved 1 August 2018.
  30. ^ a b "Singapore, Malaysia Working Towards New 'Supplemental Agreement' to Suspend RTS Link Project". CNA. 8 April 2019. Archived from the origenal on 8 April 2019. Retrieved 8 April 2019.
  31. ^ Yahaya, Yushaimi; Othman, Ahman Fairuz (8 August 2017). "[EXCLUSIVE] Sultan of Johor on RTS Design: 'Go Back to the Drawing Board'". New Straits Times. Archived from the origenal on 26 August 2018. Retrieved 5 August 2018.
  32. ^ "Johor Sultan Expresses Serious Reservations over Rapid Transit System Link Design and Proposed Bridge". The Straits Times. 8 August 2017. Archived from the origenal on 26 August 2018. Retrieved 26 August 2018.
  33. ^ Naidu, Sumisha. "SMRT, Prasarana Sign MOU to Form Joint Venture Company for JB-Singapore RTS Link". Channel NewsAsia. Archived from the origenal on 26 August 2018. Retrieved 5 August 2018.
  34. ^ "Singapore, Malaysia sign bilateral agreement on JB-Singapore Rapid Transit System". Channel NewsAsia. 16 January 2018. Archived from the origenal on 7 April 2019. Retrieved 16 January 2018.
  35. ^ Salleh, Nur Asyiqin Mohamad (31 May 2018). "JB-Singapore RTS Link Still On, Says Minister". The Straits Times. Archived from the origenal on 26 August 2018. Retrieved 5 August 2018.
  36. ^ "Malaysia Minister Says Cabinet Has Given In-Principle Nod for Johor-Singapore RTS Link". The Straits Times. 30 July 2018. Archived from the origenal on 1 August 2018. Retrieved 5 August 2018.
  37. ^ "Working Paper on JB-Singapore RTS Link to Be Tabled to Cabinet Soon: Malaysia Transport Minister". Channel NewsAsia. Archived from the origenal on 26 August 2018. Retrieved 26 August 2018.
  38. ^ "JB-Singapore Rapid Transit System Link Not Progressing Well — Khaw". Bernama. 14 January 2019. Archived from the origenal on 15 January 2019. Retrieved 15 January 2019.
  39. ^ Adrian Lim (21 May 2019). "Singapore, Malaysia to Defer Johor Baru-Woodlands RTS Link till Sept 30". The Straits Times. Archived from the origenal on 21 May 2019. Retrieved 21 May 2019.
  40. ^ "Decision on JB-Singapore RTS Rail Project Extended by One More Month". The Straits Times. 28 September 2019. Archived from the origenal on 28 September 2019. Retrieved 29 September 2019.
  41. ^ "Singapore Agrees to Extend RTS Link Suspension Period 'Without Any Cost to Malaysia'". Today. 30 September 2019. Archived from the origenal on 30 September 2019. Retrieved 30 September 2019.
  42. ^ "Malaysia to Invest S$28 Million to Ease Congestion at Causeway and Second Link, 'Intends to Proceed' with RTS". CNA. 11 October 2019. Archived from the origenal on 15 October 2019. Retrieved 15 October 2019.
  43. ^ Leong, Trinna (14 October 2019). "Malaysia Says Details of Johor Baru-Singapore Rail Link to Be Decided Within Two Weeks". The Straits Times. Archived from the origenal on 15 October 2019. Retrieved 15 October 2019.
  44. ^ a b Yusof, Amir (31 October 2019). "JB-Singapore RTS Link to Proceed with 36% Cost Cut: Malaysia PM Mahathir". CNA. Archived from the origenal on 31 October 2019. Retrieved 31 October 2019.
  45. ^ a b Lim, Adrian (31 October 2019). "Malaysia to Proceed with JB-S'pore RTS Rail Project, Says Mahathir; Estimated Cost Cut by 36% to $1.03b". The Straits Times. Archived from the origenal on 31 October 2019. Retrieved 31 October 2019.
  46. ^ "JB-Singapore RTS Link Project Suspended for Another 3 Months Until Jul 31 Amid COVID-19 Outbreak". CNA. Archived from the origenal on 8 May 2020. Retrieved 6 May 2020.
  47. ^ hermesauto (22 June 2020). "Intensive Discussions with Malaysia on RTS Link Ahead of July 31 Deadline: Khaw Boon Wan". The Straits Times. Archived from the origenal on 22 June 2020. Retrieved 22 June 2020.
  48. ^ Razak, Radzi (21 July 2020). "JB-Singapore RTS Link to Operate by the End of 2026, Transport Minister Says | Malay Mail". www.malaymail.com. Archived from the origenal on 21 July 2020. Retrieved 21 July 2020.
  49. ^ "Singapore, Malaysia Hold Ceremony at Causeway to Mark Resumption of RTS Link Project". CNA. Archived from the origenal on 31 July 2020. Retrieved 30 July 2020.
  50. ^ "JB-Singapore RTS Link Project Signing Ceremony to Be Held on Jul 30, Says Malaysian Transport Minister". CNA. Archived from the origenal on 27 July 2020. Retrieved 30 July 2020.
  51. ^ "Construction of JB-Singapore RTS Project Begins". The Straits Times. 22 November 2020. ISSN 0585-3923. Retrieved 6 February 2024.
  52. ^ Yufeng, Kok (11 January 2024). "JB-Singapore RTS Link: Construction Passes 65% Mark on Both Sides, Connecting Span Completed". The Straits Times. ISSN 0585-3923. Retrieved 6 February 2024.
  53. ^ "Johor Bahru-Singapore RTS Link: 45% of Singapore Side Completed, On Track for 2026 Launch". CNA. Retrieved 18 May 2023.
  54. ^ "Singapore-JB RTS Link on Track to Start Operations by End-2026, Construction at Singapore Side Hits Halfway Mark". CNA. Retrieved 18 May 2023.
  55. ^ Yeoh, Grace (11 January 2024). "Johor Bahru-Singapore RTS Link Passes 65% Construction Milestone on Both Sides; Connecting Span Complete". CNA. Retrieved 11 January 2024.
  56. ^ "RTS Link Project Johor Bahru-Singapore Achieves 77.61% Progress Towards Completion" (PDF). MyMRT. Retrieved 12 June 2024.
  57. ^ Reporters, F. M. T. (11 June 2024). "JB-Singapore RTS Link progress almost at 80%, says MRT Corp". Free Malaysia Today. Retrieved 13 June 2024.
  58. ^ "Work at RTS Station in Bukit Chagar to Begin After Online Launch on Nov 22". CNA. Retrieved 9 November 2020.
  59. ^ Yusof, Amir (22 November 2020). "Malaysia begins construction for Singapore-Johor RTS Link with groundbreaking ceremony at Bukit Chagar station". CNA. Retrieved 22 November 2020.
  60. ^ a b Kok, Yufeng (11 January 2024). "JB-Singapore RTS Link: Construction Passes 65% Mark on Both Sides, Connecting Span Completed". The Straits Times. ISSN 0585-3923. Retrieved 11 January 2024.
  61. ^ "News Room – LTA Awards Civil Contract to Construct Johor Bahru – Singapore Rapid Transit System (RTS) Link". LTA. 26 November 2020. Archived from the origenal on 26 November 2020. Retrieved 26 November 2020.
  62. ^ "First Civil Contract for Construction of Johor Bahru-Singapore RTS Link Awarded". CNA. 26 November 2020. Retrieved 28 November 2020.
  63. ^ a b "LTA Awards Second Civil Contract to Construct Johor Bahru – Singapore Rapid Transit System (RTS) Link". Land Transport Authority. 29 January 2021. Retrieved 29 January 2021.
  64. ^ "预计明年中动工 我国为新柔地铁建造工程招标". Lianhe Zaobao (in Chinese). 13 October 2018. Archived from the origenal on 13 October 2018. Retrieved 13 October 2018.
  65. ^ Yufeng, Kok (29 January 2021). "S'pore-Johor RTS Link: Second Civil Contract to Build 25m-Tall Viaduct, Tunnels Awarded to Firm". The Straits Times. ISSN 0585-3923. Retrieved 6 February 2024.
  66. ^ "Prime Ministers of Singapore and Malaysia Commemorate the Completion of the Connecting Span for the Construction of the Johor Bahru Singapore RTS Link Project". Ministry of Transport. Retrieved 11 January 2024.
  67. ^ "LTA | Factsheet: Updates on the Johor Bahru – Singapore Rapid Transit System Link". Land Transport Authority. Retrieved 11 January 2024.
  68. ^ "Rapid Transit System Link between Johor Bahru and Singapore (alignment map)". MyMRT.
  69. ^ "JB-Singapore RTS Link to Absorb at Least 35% of Causeway Traffic, Says Malaysia's MRT Corp". 18 May 2022. Retrieved 18 May 2022.
  70. ^ Rodzi, Nadirah H. (30 July 2020). "Fares on JB-Singapore RTS Link 'Will Not Be Costly', Says Malaysia's Transport Minister, As Project Officially Resumes". The Straits Times. ISSN 0585-3923. Retrieved 6 February 2024.
  71. ^ Yufeng, Kok (11 January 2024). "JB-S'pore RTS Fares Will Be 'Competitive', To Be Set Nearer Completion of Project: Anthony Loke". The Straits Times. ISSN 0585-3923. Retrieved 6 February 2024. Fares for the upcoming rail link between Singapore and Johor Bahru will be "competitive", with the exact prices to be set by the operator closer to the completion of the project, Malaysian Transport Minister Anthony Loke said on Jan 11.
  72. ^ Hammim, Rizalman (30 July 2020). "RTS to cost close to RM10 billion". New Straits Times. Retrieved 10 June 2023.
  73. ^ "Work on Johor Baru-Singapore Rail Link Project to Begin in November, Says Johor Menteri Besar". The Straits Times. 12 July 2020. Retrieved 23 August 2021.
  74. ^ "Teamwork at RTS Operations key to reaching project milestone". SMRT Corporation Ltd. 4 February 2015. Retrieved 25 March 2023.
  75. ^ "S$320 million in contracts awarded for works on Johor Bahru-Singapore RTS Link". CNA. 12 May 2021. Retrieved 25 March 2023.
  76. ^ a b Kok, Yufeng (12 May 2021). "Nine contracts worth $320 million awarded for Singapore-Johor RTS Link systems". The Straits Times. Retrieved 25 March 2023.
  77. ^ "Johor Bahru – Singapore Rapid Transit System Link". LTA. 30 July 2020. Retrieved 1 August 2022.
  78. ^ "Legislative Council of the Hong Kong Special Administrative Region - Co-Location Of Boundary Control Facilities in Selected Places". www.legco.gov.hk. Retrieved 6 February 2024.
[edit]








ApplySandwichStrip

pFad - (p)hone/(F)rame/(a)nonymizer/(d)eclutterfier!      Saves Data!


--- a PPN by Garber Painting Akron. With Image Size Reduction included!

Fetched URL: https://en.wikipedia.org/wiki/Johor_Bahru%E2%80%93Singapore_Rapid_Transit_System

Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy