Jump to content

Shijiazhuang Metro

From Wikipedia, the free encyclopedia

Shijiazhuang Metro
Overview
LocaleShijiazhuang, Hebei, China
Transit typeRapid transit
Number of lines3
Number of stations63
Websitehttp://www.sjzmetro.cn/
Operation
Began operation26 June 2017; 7 years ago (2017-06-26)
Technical
System length76.5 km (47.5 mi)[1]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

Shijiazhuang Metro (Chinese: 石家庄地铁; branded as SJZ Metro) is a rapid transit system in Shijiazhuang, Hebei province, China.

Network

[edit]
Shijiazhuang Metro System Map
Line Terminals
(District or County)
Commencement Newest
Extension
Length
km
Stations
 1  Xiwang
(Qiaoxi)
Fuze
(Zhengding)
2017 2019 34.3 26
 2  Liuxinzhuang
(Chang'an)
Jiahualu
(Yuhua)
2020 15.5 15
 3  Xisanzhuang
(Xinhua)
Lexiang
(Gaocheng)
2017 2021 26.7 22
Total 76.5[1] 63

Line 1

[edit]

Line 1, opened on 26 June 2017. It is 34.3 kilometers in length with 26 underground stations.

Line 2

[edit]

Line 2, opened on 26 August 2020. It is 15.5 kilometers in length with 15 underground stations.

Line 3

[edit]

Line 3, opened on 26 June 2017. It is 26.7 kilometers in length with 22 underground stations.

Background

[edit]

Planning and preparation for construction began in 2001 and 2008 respectively, but was delayed due to the world economic crisis. The projected was approved by National Development and Reform Commission[2] and included in the urban rail development project 2012–2020.[3][4] Construction of the first metro station at the Shijiazhuang railway station started in September 2012.[5][6] Construction at other sites began on 14 May 2013.[7]

Lines 1, 2 and 3 have, in total, 52 stations, 59.1 km length and will cost 42.19 billion yuan to construct. Phase 1 of Line 1, has 20 stations and is 23.9 km[8] in length. Phase 2 of Line 1 has 8 stations and is 13.495 km in length.[9] Only 6 stations in Phase 2, from Xiaohedadao to Fuze (10.4 km[10]) are operational. Line 3, has 22 stations and is 26.7 km in length. Line 2, has 15 stations and is 15.5 km in length.[11] It was opened on 26 August 2020.[11]

Line 1 runs from west to east and then to the north of city. Line 3 runs from north-west to south-east and then eastwards. Each line intersects other two. Lines 1 and 3 intersects at Xinbaiguangchang. The stations of these two lines were named in January 2013.[7][12][13] Line 2 runs from north to south.[14]

Future development

[edit]

Under construction

[edit]
Line Terminals Length
km
Stations Opening Reference
 1  (Phase 2 North section) Fuze Dongyang 3.1[15] 2 2024 [15]
 1  (Phase 3) Xiwang Huai'anlu 3.74 2 2027 [16][17]
 4  (Phase 1) Yucunnanlu Dongyuandonglu 22.4 20 [18]
 5  (Phase 1) Gongbeilu Tangubeidajie 19.9 19

Planned

[edit]

There will be 63.6 km of new lines in the Phase 2 construction plan of Shijiazhuang Metro, including Line 1 (Phase 3), Line 4, Line 5 (Phase 1), Line 6 (Phase 1).[17]

Line Terminals Length
km
Stations Reference
 6  (Phase 1) Jianhuanandajie Dongzuolu 15.76 11 [16][17]

Network map

[edit]

Map


References

[edit]
  1. ^ a b 3号线一期东段及二期工程今日开通运营!石家庄地铁首期建设顺利收官. 河北新闻网 (in Chinese). 6 April 2021. Archived from the original on 6 April 2021. Retrieved 6 April 2021.
  2. ^ "China Approves 25 Urban Rail Projects to Boost Economy". Xinhua. 25 November 2012. Archived from the original on 25 November 2012.
  3. ^ 《石家庄市城市轨道交通建设规划(2012-2020)》获批媒体沟通会. 石家庄地铁 (in Chinese). 3 August 2012. Archived from the original on 13 January 2014.
  4. ^ 石家庄市轨道交通有限责任公司. 石家庄地铁 (in Chinese). 30 May 2011. Archived from the original on 13 January 2014.
  5. ^ 石家庄新客站:西站房将于明年底投入使用 [The New Shijiazhuang Passenger Station: The Western Section Will Be Opened by the End of the Next Year]. 河北新闻网 (in Chinese). 30 August 2010. Archived from the original on 31 October 2018.
  6. ^ "Shijiazhuang Metro Line 2 Station Officially Started Yesterday". SourceJuice. 9 January 2012. Archived from the original on 13 January 2014.
  7. ^ a b "Hebei Shijiazhuang Metro to Invest 350 Million Development of the Railway to Start Next Month". Archived from the original on 10 January 2015. Retrieved 13 January 2014.
  8. ^ 石家庄地铁开通 河北正式迈入"地铁时代". CNR (in Chinese). 27 June 2017. Archived from the original on 2 August 2017. Retrieved 27 May 2019.
  9. ^ 石家庄地铁1号线二期工程顺利通过单位工程竣工验收(组图). 中工城建 (in Chinese). 22 May 2019. Archived from the original on 26 May 2019. Retrieved 27 May 2019.
  10. ^ 石家庄地铁1号线二期先开通这6座车站,票价确定. 河北新闻网. 9 June 2019. Archived from the original on 30 June 2019. Retrieved 25 June 2019.
  11. ^ a b 石家庄地铁2号线一期工程8月26日载客运营. 新华网. 16 August 2020. Archived from the original on 31 August 2020. Retrieved 16 August 2020.
  12. ^ 石家庄:地铁1、3号线出入站命名. 新华网河北频道 (in Chinese). 17 January 2013. Archived from the original on 13 January 2014.
  13. ^ "New Metro Line to Be Built in Shijiazhuang, Hebei". whatsontianjin.com. 14 November 2012. Archived from the original on 14 January 2014. Retrieved 13 January 2014.
  14. ^ "Shijiazhuang Metro Line 2 in 2015 to Start Building Huai An Road Due to Fast Road with No Line". readdailynews.com. Archived from the original on 10 January 2015. Retrieved 13 January 2014.
  15. ^ a b "开工!石家庄地铁1号线二期北段工程启动". 本次开工的1号线二期北段工程,即东上泽站至东洋站以及南牛停车场建设,线路长度3.1公里,预计工期三年
  16. ^ a b 石家庄市国民经济和社会发展第十四个五年规划和二〇三五年远景目标纲要. 石家庄日报 (in Chinese). 18 March 2021. Archived from the original on 28 November 2021. Retrieved 26 March 2021.
  17. ^ a b c 石家庄同时启动4条线路可研总承包招标 招标公告全文(1号线三期和5号线一期、4号线和6号线一期). mp.weixin.qq.com (in Chinese). 22 January 2020. Archived from the original on 25 July 2021. Retrieved 22 January 2020.
  18. ^ "石家庄轨道交通4号线、5号线开工建设 预计2027年开通运营". China News (in Chinese). 30 December 2022. Retrieved 10 January 2023.
[edit]

pFad - Phonifier reborn

Pfad - The Proxy pFad of © 2024 Garber Painting. All rights reserved.

Note: This service is not intended for secure transactions such as banking, social media, email, or purchasing. Use at your own risk. We assume no liability whatsoever for broken pages.


Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy