Integrated Science Instrument Module (ISIM)

Webb's instruments are contained within the Integrated Science Instrument Module (ISIM) which is one of three major elements that comprise the James Webb Space Telescope Observatory flight system. The others are the Optical Telescope Element (OTE) and the Spacecraft Element (Spacecraft Bus and Sunshield).

2 3d rendering views of the Webb space telescope from the rear quarter and from below front quarter labelling with the major components.
Webb Observatory major components.
NASA/GSFC CIL

ISIM contains:

ISIM being installed on webb
A rare view of the instruments being lowered into the Webb telescope at NASA/Goddard. Webb's science instruments were installed in a surgically precise operation.
NASA/Chris Gunn

In Depth:

Integrating four major instruments and numerous subsystems into one payload, the ISIM, was a daunting endeavor. To simplify integration, engineers divided the ISIM into three regions.

The "region 1" component is the cryogenic instrument module. This chills the detectors down to 39 K, a necessary first-stage cooling effort so that the spacecraft's own heat doesn't interfere with the infrared light (a form of heat) detected from distant cosmic sources. The ISIM/OTE Thermal Management Subsystem provides passive cooling. Other devices get the detectors even colder.

The "region 2" component is the ISIM Electronics Compartment, which provides the mounting surfaces and ambient thermally controlled environment for the instrument control electronics.

The "region 3" component, located within the Spacecraft Bus, is the ISIM Command and Data Handling subsystem, with integral ISIM flight Software, and the MIRI cryocooler compressor and control electronics.

ISIM Components within the Observatory
ISIM's three regions.

The image below is a SLIDESHOW. Hover over the image to see the image title and controls. Click the image to go to a detail page with more info and the ability to download the image at various resolutions (click downward arrow in lower right corner).

JWST Team Photo with Completed Flight Instrument module

Time-lapse: ISIM Installation

Time-lapse: Inside the world’s largest clean room at NASA’s Goddard Space Flight Center in Greenbelt, Maryland, the team crane-lifted the heavy science instrument package, lowered it into an enclosure on the back of the telescope, and secured it to the telescope. Credit: NASA's Goddard Space Flight Center

Behind the Scenes - cryogenic testing of the ISIM Structure

pFad - Phonifier reborn

Pfad - The Proxy pFad of © 2024 Garber Painting. All rights reserved.

Note: This service is not intended for secure transactions such as banking, social media, email, or purchasing. Use at your own risk. We assume no liability whatsoever for broken pages.


Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy