Milestones
List of Milestones for Semester I:
- 1: Preliminary Research
- 2: Qualifying Heat Stress
- 3: Heat Transfer Research and Block Diagram
- 4: Raspberry Pi Schematic
- 5: Temperature and Humidity Sensor Code and Setup
- 6: Solenoid Valve Diagram
- 7: Valve System and Nozzle Selection
- 8: Final Code and Raspberry Pi Setup
List of Milestones for Semester II:
- 1: a circuit diagram illustrating our modified system setup and integration with raspberry pi, RFID, sensor relay, and solenoid valves
- 2: a picture illustrating the wiring of our raspberry as anticipated without all the parts in yet
- 3: breadboard assembly showing correct wiring for sensor input and output to valves
- 4: picture illustrating construction of testing setup
- 5: picture of the solenoid valve and nozzle properly attached
- 6: video illustrating the LEDs used in our setup to indicate which valve is opening and if the system is running properly
- 7: Test Opening of Solenoid Valves
- 8: Test Opening of Solenoid Valves with Water Misting from Nozzles
- 9: Demonstration of each misting valve opening individually with new sensor relay (valve 3 is now fixed)
- 10: Demonstration of the valves being opened in combination with one another with new sensor relay (valve 3 is now fixed)