Semester 2 Products

Product Fabrication and Testing

Spring semester 2024 was spent fabricating, testing, and troubleshooting the design.  Three major products were developed during the Spring 2024 semester including the design report, design package, and design poster. In addition, the construction of the arm was completed and flow was successfully modulated across the arm. A video of the water truck arm demonstration is available on the website.

Water Truck Arm Design Report Spring 2024 BAE 403.pdf
Revised Design Package WT (1).pdf
Spring 2024 Poster Presentation (2).mp4
Edited Final Video.mp4