HOJA DE SUSTENTO DE METRADOS ESTRUCTURA
COLEGI O
: ANDRES AVELI NO CACERES
PROYECTI STA
FECHA
: RENZO GUTTI CORTEZ
: MAYO 2013
PARTIDA
DESCRIPCIÓN
UND
MEDIDAS
CANT
LARGO
01
OBRAS EXTERIORES (CISTERNA, TANQUE ELEVADO Y VEREDAS)
01.01
OBRAS PROVISIONALES
01.01.01
CARTEL DE IDENTIFICACION DE 3.60x7.20m.
ANCHO
PARCIAL
pza
2.00
2.00
01.01.02
ALMACEN OFICINA Y CASETA DE GUARDIANIA
2.00
m2
72.00
9.00
01.01.03
CERCO PROVISIONAL DE ESTERAS
8.00
72.00
m
520.00
520.00
01.01.04
01.01.05
01.01.06
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRABAJOS PRELIMINARES
01.02.01
TRAZO Y REPLANTEO PRELIMINAR
1.00
1.00
1.00
1.00
1.00
1.00
1.00
glb
IMPLEMENTOS DE PLAN DE SEGURIDAD
01.02
520.00
vje
FLETE TERRESTRE DE MATERIALES DIVERSOS
1.00
glb
1.00
m2
1,500.00
1,500.00
01.03
MOVIMIENTO DE TIERRAS
01.03.01
EXCAVACION DE ZANJAS PARA CISTERNA H=2.0m
01.03.02
01.03.04
01.03.05
5.80
3.00
1.75
30.45
2.00
3.00
0.70
0.35
1.47
1.00
3.00
1.10
0.35
1.16
2.00
3.30
0.70
0.35
1.62
2.00
3.30
0.10
0.05
0.03
4.00
1.60
0.10
0.05
0.03
2.00
1.90
0.15
0.35
0.20
Excavacion 1.25
1.00
35.00
base de cisterna 1.25
-1.00
6.66
volumen de la cisterna 1.25
-1.00
5.40
RELLENO CON MATERIAL PROPIO
m3
2.10
0.60
0.20
-0.32
0.40
0.20
1.60
-0.64
cimientos 1.25
-1.00
0.38
-0.48
Excavacion 1.30
1.00
35.00
45.50
Relleno 1.30
-1.00
7.00
-9.10
1.00
35.00
45.50
1.00
5.40
1.10
5.94
-1.00
2.70
0.20
-0.54
-1.00
7.00
1.00
5.40
1.10
5.94
-2.00
2.70
0.20
-1.08
1.00
5.80
3.00
0.60
10.44
2.00
1.90
0.40
0.60
0.91
1.00
1.40
0.13
0.35
0.06
1.00
1.40
0.07
0.25
0.02
1.00
1.10
0.13
0.35
0.05
1.00
1.10
0.07
0.25
0.02
1.00
1.60
0.13
0.25
0.05
1.00
0.87
0.13
0.25
0.03
1.00
1.40
0.35
0.49
1.00
1.40
0.25
0.35
1.00
1.10
0.35
0.39
m3
BOMBEO DE NAPA FREATICA
01.04.01.03
SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO
-9.10
4.90
m3
cisterna
SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M.
5.40
m2
zona de veredas
01.04.01.02
36.40
m2
AFIRMADO DE 8"
OBRAS DE CONCRETO SIMPLE
36.40
m3
ESCARIFICADO Y COMPACTADO
CIMIENTOS CORRIDOS 1:10 + 30 % P.G.
-27.00
-1.00
ELIMINACION DE MATERIAL ACARREADO
01.04.01.01
1.60
-4.00
ACARREO INTERNO, MATERIAL PROVENIENTE DE EXCAVACIONES
01.04
-8.33
2.50
1.25
Relleno 1.30
01.03.07
7.00
43.75
pinto de columnas C-1 1.25
zona de veredas
01.03.06
35.00
1.00
Excavacion 1.30
01.03.03
1,500.00
m3
cisterna
TOTAL
ALTO
10.40
m3
0.90
m3
0.20
m3
2.70
Página 1 de 4
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
01.04.01.04
01.04.01.05
DADO DE APOYO - CONCRETO F'C=175 KG/CM2
1.00
1.10
0.25
0.28
2.00
1.60
0.25
0.80
2.00
0.87
0.25
0.44
1.00
0.70
0.15
0.05
2.00
1.20
0.15
0.36
m3
ENCOFRADO Y DESENCOFRADO EN DADOS DE APOYO
0.10
0.50
m2
1,415.90
01.04.02
VEREDAS EXTERIORES
01.04.02.01
VEREDA CONCRETO 175Kg/Cm2 E=4" SEMIPULIDO Y BRUÑADO
m2
1.00
473.84
473.84
01.04.02.02
SARDINEL H=0.50m. Fc=175 Kg/Cm2 Acabdo 1:2
m
1.00
248.60
248.60
01.04.02.03
ENCOFRADO DE SARDINEL
m2
1.00
124.30
124.30
01.04.02.04
CURADO CON AGUA
m2
1.00
473.84
473.84
01.04.02.05
JUNTA DE DILATACAION
m
1.00
95.00
95.00
01.05.01.01
OBRAS DE CONCRETO ARMADO
01.05.01.01.01 CONCRETO f'c=210Kg/cm2 - COLUMNAS
m3
6.30
C-1
4.00
0.40
0.40
8.74
5.59
NC-A
3.00
0.25
0.10
2.20
0.17
CA-1
6.00
0.25
0.13
2.20
0.43
CA-1
2.00
0.25
0.13
1.57
0.10
4.00
0.80
8.74
27.97
4.00
0.30
8.34
10.01
4.00
0.50
6.54
13.08
NC-A
3.00
0.60
2.20
3.96
CA-1
6.00
0.63
2.20
8.32
CA-1
2.00
0.63
1.57
1.98
01.05.01.01.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS
m2
C-1
01.05.01.01.03 ACERO DE REFUERZO fy=4,200 kg/cm2
kg
65.30
# veces
cantidad
longitud
densidad
1,617.00
C-1
Ø 3/4"
4.00
8.00
13.94
2.24
999.22
Ø 3/8"
4.00
78.00
1.70
0.56
297.02
Ø 3/8"
4.00
78.00
1.30
0.56
227.14
Ø 1/2"
3.00
1.00
3.10
0.99
9.21
Ø 1/2"
3.00
1.00
2.60
0.99
7.72
Ø 1/4"
3.00
11.00
0.50
0.25
4.13
NC-A
CA-1
Ø 3/8"
6.00
4.00
3.10
0.56
41.66
Ø 1/4"
6.00
13.00
0.84
0.25
16.38
CA-1
Ø 3/8"
2.00
4.00
2.22
0.56
9.95
Ø 1/4"
2.00
11.00
0.84
0.25
4.62
8.00
1.90
0.25
0.50
1.90
2.10
01.05.01.02.01 CONCRETO f'c=210Kg/cm2 - VIGAS
m3
vigas
4.10
8.00
2.10
0.25
0.50
corte c-c
1.00
2.10
0.13
0.10
0.03
ducto
4.00
0.46
0.09
0.15
0.02
2.00
1.90
1.05
3.99
2.00
2.10
1.05
4.41
4.00
1.90
1.25
9.50
4.00
2.10
1.25
10.50
2.00
1.90
1.05
3.99
2.00
2.10
1.05
4.41
corte c-c
1.00
2.10
0.20
0.42
ducto
2.00
0.46
0.30
0.28
0.39
0.36
01.05.01.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS
m2
37.90
2.00
01.05.01.02.03 ACERO DE REFUERZO fy=4,200 kg/cm2
kg
# veces
0.46
cantidad
longitud
densidad
522.00
Vigas
Ø 5/8"
6.00
4.00
3.45
1.55
Ø 3/8"
6.00
8.00
1.60
0.56
128.34
43.01
Ø 5/8"
6.00
4.00
3.65
1.55
135.78
Ø 3/8"
6.00
9.00
1.60
0.56
48.38
Ø 3/4"
2.00
4.00
3.45
2.24
61.82
Ø 3/8"
2.00
8.00
1.60
0.56
14.34
Ø 3/4"
2.00
4.00
3.65
2.24
65.41
Página 2 de 4
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
corte c-c
ducto
Ø 3/8"
2.00
9.00
1.60
0.56
16.13
Ø 3/8"
1.00
2.00
2.45
0.56
2.74
Ø 1/4"
1.00
9.00
0.26
0.25
0.59
Ø 3/8"
4.00
2.00
0.90
0.56
4.03
4.00
5.00
0.30
0.25
1.50
Ø 1/4"
01.05.01.02.04 MANGUITO PVC-SAL 1 1/2" X 10CM FIERRO 1/2" 80CM
und
6.00
6.00
01.05.01.03.01 CONCRETO f'c=210Kg/cm2 - LOSAS MACIZAS
6.00
m3
01.05.01.03.02 ENCOFRADO Y DESENCOFRADO EN LOSA MACIZA
1.00
1.00
2.20
2.10
0.20
0.92
2.00
1.90
0.15
0.20
0.11
1.00
2.20
2.10
m2
5.20
2.00
01.05.01.03.03 ACERO DE REFUERZO fy=4,200 kg/cm2
kg
# veces
1.00
01.05.01.04.01 CONCRETO f 'c=210 kg/cm2 EN CISTERNA
1.90
cantidad
4.62
0.15
longitud
12.00
0.57
densidad
2.95
0.56
61.00
19.82
1.00
7.00
2.95
0.56
11.56
1.00
11.00
3.15
0.56
19.40
1.00
6.00
3.15
0.56
10.58
2.00
5.20
0.70
0.50
3.64
2.00
0.60
0.45
0.50
0.27
2.00
1.60
0.70
0.50
1.12
2.00
1.60
0.25
0.50
0.40
1.00
2.10
0.60
0.30
0.38
2.00
1.60
1.65
0.15
0.79
4.00
1.50
0.10
0.05
0.03
4.00
1.55
0.10
0.05
0.03
2.00
5.40
0.20
1.70
3.67
1.43
m3
14.50
Base inferior
Paredes laterales
2.00
2.10
0.20
1.70
pinto de columnas C-1
4.00
0.40
0.20
1.85
0.59
techo
1.00
5.40
2.50
0.15
2.03
tapa
-1.00
0.63
0.63
0.15
-0.06
2.00
0.83
0.10
0.50
0.08
2.00
0.63
0.10
0.50
0.06
desnivel
2.00
2.10
0.20
0.84
2.00
0.60
0.20
0.24
Paredes laterales exterior
2.00
5.40
1.85
19.98
2.00
2.50
1.85
9.25
Paredes laterales interior
2.00
5.00
1.70
17.00
7.14
01.05.01.04.02 ENCOFRADO Y DESENCOFRADO EN CISTERNA
m2
70.80
2.00
2.10
1.70
pinto de columnas C-1
8.00
0.20
1.85
2.96
techo
1.00
5.00
2.10
10.50
tapa
-1.00
0.63
0.63
-0.40
4.00
0.63
0.65
1.64
4.00
0.83
0.50
1.66
01.05.01.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2
kg
#veces
cantidad
longitud
densidad
898.00
Ø 1/2"
1.00
36.00
3.70
0.99
131.87
Ø 1/2"
1.00
8.00
3.30
0.99
26.14
Ø 1/2"
2.00
4.00
6.50
0.99
51.48
Ø 1/2"
2.00
11.00
3.50
0.99
76.23
Ø 1/2"
2.00
9.00
1.40
0.99
24.95
Ø 1/2"
1.00
8.00
2.20
0.99
17.42
Ø 1/2"
1.00
14.00
1.40
0.99
19.40
Ø 1/2"
4.00
9.00
1.40
0.99
49.90
Ø 1/2"
2.00
6.00
1.00
0.99
11.88
Ø 3/8"
2.00
14.00
5.70
0.56
89.38
Ø 3/8"
2.00
14.00
2.80
0.56
43.90
Ø 3/8"
2.00
18.00
2.65
0.56
53.42
Ø 3/8"
2.00
34.00
2.65
0.56
100.91
Ø 3/8"
1.00
18.00
5.55
0.56
55.94
Ø 3/8"
2.00
8.00
2.55
0.56
22.85
Ø 3/8"
2.00
28.00
2.65
0.56
83.10
Ø 3/8"
1.00
10.00
1.85
0.56
10.36
Ø 1/2"
2.00
2.00
2.00
0.99
7.92
Ø 1/2"
2.00
2.00
1.70
0.99
6.73
Ø 3/8"
4.00
2.00
0.95
0.56
4.26
Ø 3/8"
2.00
5.00
1.10
0.56
6.16
paredes
techo
tapa
Página 3 de 4
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
Ø 3/8"
01.05.02.01
01.05.02.02
2.00
3.00
1.10
0.56
3.70
fondo
1.00
2.20
2.10
0.20
0.92
2.00
1.90
0.15
0.20
0.11
paredes
2.00
2.90
0.20
1.58
1.83
2.00
2.30
0.20
1.58
1.45
2.00
0.40
0.40
1.58
0.50
techo
1.00
2.90
2.70
0.15
1.17
tapa
-1.00
0.63
0.63
0.15
-0.06
2.00
0.83
0.10
0.15
0.02
2.00
0.63
0.10
0.15
0.02
fondo
1.00
2.20
2.10
2.00
1.90
0.15
paredes
2.00
5.60
2.00
4.33
techo
1.00
2.30
1.70
2.00
1.90
0.40
1.52
-1.00
0.63
0.63
-0.40
4.00
0.63
0.30
0.76
4.00
0.83
0.15
0.50
CONCRETO f'c=210Kg/cm2 - TANQUE ELEVADO
m3
ENCOFRADO Y DESENCOFRADO EN TANQUE ELEVADO
6.00
m2
44.40
tapa
01.05.02.03
ACERO DE REFUERZO fy=4,200 kg/cm2
kg
fondo
paredes
techo
tapa
01.06
MUROS Y TABIQUES DE ALBAÑILERIA
01.06.01
MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5 cm
01.06.02
01.06.03
MURO DE LADRILLO KK TIPO IV CANTO M:1:1:4 E=1.5cm
ALAMBRE # 8 REFUERZO HORIZONTAL EN MUROS
# veces
cantidad
longitud
4.62
0.57
1.73
19.32
1.58
13.64
3.91
densidad
366.00
Ø 3/8"
2.00
9.00
3.15
0.56
31.75
Ø 3/8"
2.00
10.00
2.95
0.56
33.04
Ø 3/8"
2.00
24.00
2.60
0.56
69.89
Ø 3/8"
2.00
18.00
2.60
0.56
52.42
Ø 3/8"
2.00
14.00
3.15
0.56
49.39
Ø 3/8"
2.00
14.00
2.95
0.56
46.26
Ø 3/8"
4.00
7.00
1.56
0.56
24.46
Ø 3/8"
1.00
6.00
3.05
0.56
10.25
Ø 3/8"
2.00
2.00
1.29
0.56
2.88
Ø 3/8"
1.00
4.00
3.05
0.56
6.83
Ø 3/8"
2.00
2.00
1.29
0.56
2.88
Ø 3/8"
2.00
3.00
2.85
0.56
9.58
Ø 3/8"
1.00
3.00
2.02
0.56
3.39
Ø 3/8"
2.00
2.00
2.85
0.56
6.38
Ø 3/8"
1.00
2.00
2.02
0.56
2.26
Ø 1/2"
1.00
2.00
2.03
0.99
4.02
Ø 1/2"
2.00
2.00
1.65
0.99
6.53
Ø 3/8"
4.00
1.00
0.95
0.56
2.13
Ø 3/8"
2.00
4.00
0.30
0.56
1.34
Ø 3/8"
2.00
2.00
0.30
0.56
0.67
1.00
1.40
1.85
2.59
1.00
1.10
1.85
2.04
1.00
1.60
1.22
1.95
1.00
0.87
1.85
1.61
2.00
0.46
1.22
1.12
m2
8.20
m2
kg
1.10
# veces
cantidad
longitud
densidad
8.00
1.00
12.00
2.05
0.11
2.71
2.00
12.00
0.73
0.11
1.91
1.00
12.00
1.52
0.11
2.01
2.00
6.00
0.73
0.11
0.96
Página 4 de 4
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)