Economic Report
Bill of Materials
Bill of Materials
Below is the final bill of materials. The final cost was calculated using the bid sheet provided by the Lexington-Fayette County Urban Government (LFCUG) and other outside sources. The estimates from the LFCUG are based on previous bids and assumed to be similar to what is available in Washington Court House, Ohio. The upkeep maintenance costs, diversion costs, and calculations can be found on the corresponding tabs.
Labor Wage Reference
Labor Wage Reference
This document is used in reference for the cost of construction labor. It is for a similar project started in Ohio.
Labor Wage Reference.pdf