Products: Science Product Validation Schedules

This page houses the latest GOES-16, GOES-17, GOES-18, and GOES-19 science product validation status and schedules.

This information is current as of October 31, 2024.

All dates are subject to change.

GOES-16

GOES-T Post-Launch Science Product Validation Schedule table

click on image for larger picture


GOES-16 L2B Science Product Validation Status table

click on image for larger picture


Changes since the GOES-16 June 24, 2024 version:

  • Cloud Cover Layers was declared Provisional Maturity on May 16, 2023
  • The Provisional PS-PVR for Ice Motion (new capability, not a baseline product) has been rescheduled from June 20, 2023, to Oct. 25, 2023 due to issues in the post-processing clustering algorithm. GOES-16 and GOES-18 will be reviewed together at this PS-PVR.

Upcoming Full Validation PS-PVRs:

  • 12/09/2024: ABI L2+ Snow Cover
  • 05/16/2025: ABI L2+ Cloud Cover Layers
  • 04/17/2026: ABI L2+ Photosynthetically Active Radiation

GOES-17

GOES-17 L1b Science Product Validation status image

click on image for larger picture


GOES-17 L2B Science Product Validation Status image

click on image for larger picture


Changes since the GOES-17 January 28, 2022 version:

  • ALL PRODUCT REVIEWS DEFERRED SINCE SPACECRAFT TO ENTER STORAGE MODE

GOES-18

GOES-T launched on March 1, 2022. After reaching geostationary orbit the satellite was renamed GOES-18. GOES-18 replaced GOES-17 as NOAA’s operational GOES-West satellite on Jan. 4, 2023. GOES-18 data availability and product validation information is current as of December 6, 2023.


GOES-18 L1B Science Product Validation Status image

click on image for larger picture


GOES-18 L2B Science Product Validation Status imabe

click on image for larger picture


Changes since the GOES-18 March 21, 2023 version:

  • Cloud Cover Layers was declared Provisional Maturity on May 16, 2023
  • The Provisional PS-PVR for Ice Motion (new capability, not a baseline product) has been rescheduled from June 20, 2023, to Oct. 25, 2023 due to issues in the post-processing clustering algorithm. GOES-16 and GOES-18 will be reviewed together at this PS-PVR.
  • Dates are now available for the GOES-18 Full Validation PS-PVRs.

Upcoming Full Validation PS-PVRs

  • 09/28/2024: ABI L2+ Clear Sky Mask, Cloud Top Height, Cloud Top Phase, Cloud Top Pressure, Cloud Top Temperature, Derived Motion Winds
  • 10/12/2024: ABI L2+ Derived Stability Indices, Fire/Hot Spot Characterization, Legacy Vertical Moisture Profile, Legacy Vertical Temperature Profile, Total Precipitable Water
  • 11/09/2024: Aerosol Detection (Smoke and Dust), Aerosol Optical Depth, Downward Shortwave Radiation: Surface, Land Surface Albedo, Land Surface Reflectance, Land Surface Temperature, Rainfall Rate/Quantitative Precipitation Estimate, Reflected Shortwave Radiation: Top of Atmosphere
  • 11/21/2024: ABI L2+ Cloud Optical Depth, Cloud Particle Size Distribution, Sea Surface Temperature
  • 12/09/2024: ABI L2+ Snow Coveri
  • 12/29/2024: ABI L2+ Ice Age and Thickness, Ice Concentration and ExtentS
  • 05/16/2025: ABI L2+ Cloud Cover Layers
  • 04/17/2026: ABI L2+ Photosynthetically Active Radiation

GOES-19

GOES-U launched on June 25, 2025. After reaching geostationary orbit the satellite was renamed GOES-19. GOES-19 is planned to replace GOES-16 as NOAA’s operational GOES-West satellite on April 4, 2025. GOES-19 data availability and product validation information is current as of October 31, 2024.

GOES-19_SciProdVal Sched image

click on image for larger picture


GOES-19 L1b Science Product Validation Status table image

click on image for larger picture


GOES-19 L2b Science Product Validation Status table image

click on image for larger picture


Changes since the Sept. 20, 2024 version:

  • ABI was declared Beta on 10/1, added to GRB 10/2
  • GMAG was declared Beta on 10/9, added to GRB 10/17
  • EXIS was declared Beta on 10/18, added to GRB 10/21
  • SEISS was declared Beta on 10/22, added to GRB 10/23
  • ABI L1b/CMI Provisional rescheduled from 1/3/25 to 12/20/24
  • ABI L2+ all group Provisionals rescheduled, shifted right by ~2 weeks each
  • SEISS MPS-Hi Provisional rescheduled from 1/8 to 2/5 to account for accidental data loss at NCEI

Upcoming Beta Declarations

  • 11/04/2024: SUVI
  • 01/21/2025: GLM
  • 01/27/2025: CCOR *PS-PVR, milestone owned by SWO/NCEI

Upcoming Provisional PS-PVRs

  • 11/29/2024: SEISS SGPS
  • 12/04/2024: GMAG
  • 12/20/2024: ABI L1b/CMI (was 1/3/25)
  • 01/29/2025: ABI L2+ Group 1 (DMW, Mask, Phase, CTP) (was 1/8)
  • 02/05/2025: SEISS MPS-Hi (was 1/8/25)
  • 02/05/2025: ABI L2+ Group 2 (FHS, LAP, RR, COMP, CCL) (was 1/22)
  • 02/07/2025: SEISS EHIS
  • 02/11/2025: ABI L2+ Group 3 (LST, LSA/BRF, SRB, AOD, ADP) (was 1/29)
  • 02/11/2025: SEISS MPS-Lo
  • 02/19/2025: ABI L2+ Group 4 (SST, FSC, IAT, ICE) (was 2/5)
  • 02/24/2025: CCOR *milestone owned by SWO/NCEI
  • 02/24/2025: SUVI
  • 03/11/2025: EXIS
  • 03/27/2025: GLM
pFad - Phonifier reborn

Pfad - The Proxy pFad of © 2024 Garber Painting. All rights reserved.

Note: This service is not intended for secure transactions such as banking, social media, email, or purchasing. Use at your own risk. We assume no liability whatsoever for broken pages.


Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy