The paper appraised performance of contingency allowance in addressing projects' cost risk. To achieve this aim, impact of contingency provision in some selected building projects were evaluated. Data for the study was collected by means... more
Contractors traditionally estimate cost contingency based on subjective judgment, such as 5-10% from the cost estimated by considering past similar project. However, such method does not have a sound basis and is difficult to justify or... more
Contractors traditionally estimate cost contingency based on subjective judgment, such as 5-10% from the cost estimated by considering past similar project. However, such method does not have a sound basis and is difficult to justify or... more
A risk analysis of a construction cost estimate for a large hydroelectric project is discussed. The purpose of the study was to provide an independent check on the reliability of the estimate and the adequacy of the contingency allowance.... more
Contingency cost is the money provided as the reserve cost to face the uncertainty situation relating to the construction project. The contractor need to allocate some amount of the budget for contingency cost into the offering budget... more
Construction projects require a budget plan that would sponsor the entire project and unforeseen circumstances that comes with the project. Cost contingency is a certain amount added to the actual contract amount to cater for the risks... more